Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid 23-24 March, 2010.

Slides:



Advertisements
Similar presentations
XMM-Newton 1 Matthias Ehle - SCI-OAX EPIC BGWG Meeting#6 November 5 th, 2007 BGWG Report from the June XMM-Newton User Group Meeting Matthias Ehle.
Advertisements

Chandra X-Ray Observatory CXC Paul Plucinsky EPIC Cal April ACIS Calibration: Recent Updates, Planned Updates, & Future Issues 2.E0102: Joint.
Chubaka Producciones Presenta :.
Chandra X-Ray Observatory CXC Paul Plucinsky CUC September Overall Status of the Instrument 2.Update on Controlling the FP Temperature ACIS Ops.
Configuration Management Backup/Recovery Project Review.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Chandra Users' Committee, 27 April 2010 Chandra Director’s Office Cycle 12  CfP Release: Dec  GTO Deadline: 11 March 2010  GO Deadline: 18 March.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Writing the Honors Thesis A Quick Guide to Long-term Success.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Senior Review Evaluations (1 of 5) Proposals due: 6 March 2015 Panel evaluations: Week of 22 April 2015 Performance factors to be evaluated will include.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Mission-Based Management March 2007 Electronic CV System Users Group.
The Yohkoh Galileo Project --- International Coordination Meeting Nobeyama, Japan July 2002.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
A Preliminary Cycle 1 Calibration Plan for the JWST Science Instruments James Muzerolle.
May 15, 2013 Space Weather Product Team (SWPT) Making Sense of the Nonsensical.
Template For Building Project Schedule Jazz Presentation.
1st NRC Meeting, October 2006, Amsterdam 1 ICCS 2009 Field Operations.
Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center 25 April 2012 Implementing Portals of the Universe, April
CXC Implementing 2007 NRC Portals of the Universe Report Chandra X-ray Center Recommended Best Practices Roger Brissenden and Belinda Wilkes 25 April 2012.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
STIS Closeout Plan Paul Goudfrooij 2005 HST Calibration Workshop, 10/26/2005.
3rd NRC Meeting, 9-12 June 2008, Windsor ICCS 2009 Main Survey Field Operations.
FGM report 9 th Cross calibration workshop Elizabeth Lucek, Patrick Brown, Paul French, Chris Carr, Tim Oddy, André Balogh I mperial College London March.
1 GRPE Informal Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 64 Geneva, 07 June 2012 Informal document No. GRPE (64th GRPE, June.
1 SPSRB Decision Brief on Declaring a Product Operational Instructions / Guidance This template will be used by NESDIS personnel to recommend to the SPSRB.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Background Management Council (MC) was briefed on approach in early Feb 2003 and approved it Agreed that every Service Group (SG) will participate in.
Planetary Science Archive PSA User Group Meeting #1 PSA UG #1  July 2 - 3, 2013  ESAC PSA Archiving Standards.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
April , 2006 HEASARC Users Group Steve Drake RXTE Archive at HEASARC Status and Plans Steve Drake.
6/6/08NASA/USRA Management review- SETI TLR - 1 A New SOFIA Science Vision Charter, Progress, and Plans Tom Roellig.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
Data Management Seminar, 8-11th July 2008, Hamburg 1 ICCS 2009 – On-line Data Collection in the Main Survey.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
Southend Together Secretariat 21 st February Developing Southend Together’s Sustainable Community Strategy
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
Objectives: Upgrade Siebel to a supported application Upgrade Oracle database to current version Deliver all existing user functionality with no degradation.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
Introducing the INS Master Schedule Wayne Baggett.
Strategic Planning Deanna Herwald Vice President-Quality Management Systems.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
1 MAPPS Software Review Board MAPPS SRB – part II ESAC, Madrid, Spain 3 rd June 2016 ESA-ESTEC - “MAPPS Software Review Board” – MAPPS SRB - Part II, ESAC,
Annual Report of the DWP Experiment 9th CAA Operations Review
Business Practices Subcommittee Update
Security week June 2017 © ETSI All rights reserved.
Communications Timeline
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Astro Space Center of Lebedev Physical Institute, Moscow
Workshops, Assignments and Work place visits
McDonald’s calendar 2007.
Overall Project RAG Status:
McDonald’s calendar 2007.
Lunar Calibration Workshop Status of the preparation
2015 January February March April May June July August September
Presentation transcript:

Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 2 Contents  Science program status  Mission planning  Community Support  Instruments  SAS  Users Group

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 3 Science Program  AO8, May April 2010: status as of March 16 : A+B performed: 12,300 ks: 95% C: 2800 ks: 32% of recommended C time  AO9, May 2010 – April 2011 Oversubscription 7.7 & 539 proposals Second phase finished February 5, enhancement ~ finished  A10 milestones: Call open on August 24, 2010 Closure on October 8 (12UT) 2010 Approved program: late December 2010 Second phase: January 10 – February 4, 2011 Start observations: May 2011 Courtesy: P.Rodriguez

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 4 Mission Planning  AO9: May 2010 – April 2011: Long Term Plan in preparation, to go public in May  Scheduling: On-board antenna constraints check at SOC  efficiency fully recovered Frequent Ground/Station maintenance-upgrade periods  need to use backup G/S with sometimes lower performance  Some impact on scheduling

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 5 Community Support: data access  Archive: next XSA release week of April 26: access to 2XMMiDR3, Access to next incremental version of Slew Catalogue  Latest Slew Results (R.Duro, R.Saxton, N.Schartel)  BiRD updated with public data until September 2009 (R.Gonzalez & P.Rodriguez)

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 6 Community Support: workshops  Science Workshop: Ultra-luminous X-ray sources and Middle Weight Black Holes Program to be available on April 15 Workshop May at ESAC (bus transport from Madrid)  X-ray Universe 2011 : May or June 2011, new venue (a European capital?)  SAS workshop : June  10 th anniversary presentations at:

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 7 Community Support: documentation  Users Handbook: next update needed for AO-10: Calibration scientist (Matteo) will ask for inputs in early May Inputs needed by end of May  SAS manual: update following next release  Reminder: send your preferred pictures to the Gallery  Reminder: let us know about Thesis done with XMM-Newton data

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 8 Instruments  RGS: see Andy’ s presentation  OM Overall performance is monitored through regular observation of spectro- photometric standard stars: – time dependent sensitivity degradation correction is implemented into SAS. Bad pixels (dead and low sensitivity) are checked using flat fields and extended objects observations. Sources affected by bad pixels are flagged into SAS. Astrometry and photometric calibration (instrumental system, conversion to standard Johnson UBV and AB system in UV) are applied by SAS Grisms wavelength and absolute flux calibration applied by SAS A OM calibration paper will be submitted to a refereed publication soon.

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 9 SAS  SAS 10 is in the track … Currently frozen, Waiting for validation results  See Richard’ s presentation

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 10 Users Group  Meeting #11: May at ESAC  Recommendations for EPIC: see Matteo’ s presentation  Other: Time epoch-dependent fudge function for RGS effective area such that the joint analysis of RGS and EPIC data is possible Continue to play a leading role in cross-cal with other missions RISA: long-term task with low priority, investigate as well other options Investigate if coordinated efforts to maintain software and prepare for the future with Chandra, Heasarc, Suzaku …  New chair after this meeting: Xavier Barcons, already attending in May

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 11 Science  See, e.g. N.Schartel presentation in the 10 th anniversary event

Science Operations | M.Santos-Lleo |EPIC meeting | March 2010 | Pag. 12 Thanks ! Thank you very much to the Instrument teams for their continuous support and contribution to science operations ! Questions?