Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber Project Gulfstream Curtis Christiansen Jordan Hodge Jordan.

Slides:



Advertisements
Similar presentations
Implementing Material Resource Efficiency practices and Logistics Malcolm Waddell Construction Project Manager MRE Guide Material Logistics Plans Reverse.
Advertisements

Whole Systems, Whole Students Eric Brewer UC Berkeley, Google CCC Council November 2, 2012.
Initial Design Review Team “Chip” Tim Quinn Henry Mossell Desiree Cerretani.
Cory Fulkerson (Project Manager) - Mechanical Engineer John Graham - Computer Engineer Clayton Hooks - Electrical Engineer O’Raphael Okoro - Electrical.
Automatic Dog Walker Paul Johnson and André St. Denis 9/12/00.
A.U.V. Emeric Rochford Dale Williams Bryan Douse Ryan Gray.
Agile Robotics Site Visit Mitch Leammukda 8/8/2008 Agile Robotics Platform Integration Mitch Leammukda, Troy Jones, Lenny Paritsky, Rob Truax, Mofe Uku,
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
UltraSonic Orchard fertilizer Dispensing Automaton Erik Mueller & Patrick Thurston.
P11216 – Wandering Ambassador (Part VI) Customer: Stan Rickel Nick Leathe – Mechanical Engineer Anna Gilgur – Mechanical Engineer Rui Zhou – Electrical.
Jordan Hodge Jordan Lyford Wilson Schreiber.  Background  Problem Statement  Solution  Software 2.
“Fertibot” Mike Ambrisco Andrew Bourgeois Eric Hall Aaron Minard.
Ted Keppner Jacques Dupuis.  Farms run into problems of having to pay for workers to clean up cow bed shavings when they could be doing more important.
UltraSonic Orchard fertilizer Dispensing Automaton Erik Mueller & Patrick Thurston.
1. P09203 – 1kg Robotic Motor Module Gen 2 Platform This project is Sponsored by the Kate Gleason Foundation.  Team Members:  Lauren Farnsworth → Team.
Justin Heyer Ted Keppner. Build an autonomous barn floor scrapper Needs to be able to be adapted to multiple barns Solutions to clean either slotted/solid.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
Team 18 Dan Breuker Jon Cory Matt Edwards Kyle Israels.
The Combination Station Status Report Alex Rust & Nate Lamie.
A.G.I.L.E Team Members: Brad Ramsey Derek Rodriguez Dane Wielgopolan Project Managers: Dr. Joel Schipper Dr. James Irwin Autonomously Guided Intelligent.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
CSE Design Lab – Milestone 2 James Hopkins Dave Festa Dennis O’Flaherty Karl Schwirz.
Group Members Ikechukwu Mogbana Adewuyi Kupolati Frederick Tyson Advisor Prof. Mahmood February, Senior Project 2005/06 Undergraduate Project Proposal.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Mr. Mixer (Automatic Mixing Machine) Final Presentation Alex Rust & Nate Lamie.
Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber Project Gulfstream Curtis Christiansen Jordan Hodge Jordan.
Team MASTers™ Craig Lalumiere David Cobler Michael White.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
Team Hybrid  Daniel Farley  John Hoyt  Sean Frost Hoyt.
Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
Field Navigational GPS Robot Final Presentation & Review Chris Foley, Kris Horn, Richard Neil Pittman, Michael Willis.
Team Gantry Tyson Rogstad Erik Flum Gary Zigmann.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Guitar Neck Duplicator By Eric Hall. Background  Difficult to Replicate  Time Consuming  Generally done by hand.
In Due Time Kyle Baitz, Jonathan Pierson, Travis Haley.
10/18/2006ELM 4071 Miniproject Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann Rob.
Critical Design Review Colorado State University - Pueblo April 15, 2005.
Mix Master Status Report Alex Rust & Nate Lamie. 11/19/02Alex Rust & Nate Lamie Background Consumers enjoy elaborately mixed beverages but do not have.
Team Gary Dan Farley Tyson Rogstad Erik Flum Rob Koch Gary Zigmann.
 Rollin Bicskei  Eric Bornemann  Jason Wells  Ryan Bidlack  ELM 4701 October 2008 Toromatic Team Brown & Associates:
Team Gantry Tyson Rogstad Erik Flum Gary Zigmann.
R I T Team Members: Dan Lester → Team Lead Chris Feuerstein → Lead Engineer/Electrical Lead Mike Schwec → Electrical Support Jacob Hillmon → Electrical.
Team Hybrid Hoyt MemberSubsystem Sean Frost Electric motor, motor controller, charge controller, charge accumulators Dan Farley Hydraulics system: Pumps,
Lec#14.  Disable person needs equipment with the degree of impairment and desired degree of independence in area of personal care, mobility, leisure,
Computer assisted design of Sprinkler System Piping assemblies and sub-structures Hilti BU Installation Systems ¦ ¦
CONNECTING MODULE – conveyor 2 – sorting mechanism (waste bin) 3 – connectors (air, cooling water)
Robotic Backhoe with Haptic Display Design Overview
RoboVac a UTC Corp. Power Generation Engineer Juan Gamarra
PropaGator Oral Report 2 Andrew Wegener IMDL 2012.
Texas Integrated Energy Solutions. Development Team, Background, Objective, & Justification 2.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Phong Le (EE) Josh Haley (CPE) Brandon Reeves (EE) Jerard Jose (EE)
Trash2D2 Oral Report 1 IMDL David Mercado. Objective #1: Hold Trash Robot Body – Trash Can ▫Sturdy Outer Body ▫Inner Cavity Holds 13 Gallon Bag ▫20 Gallon.
Company for Urban Innovative Transport (CUIT) 19/12/2007 Request for proposal.
Improving Mobility of Wheelchair Users in City Environment Faculty of Mechanical Engineering, Plzeň.
IMDL Robot Presentation EEL5666 Robert Hartwell 31 Jan 2012.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
UNDERWATER SALVAGE ROBOT PROPOSAL HydroBotics Inc. O CTOBER Luke Karr Erin Fogle Dan Sowa Corbin Kruczek Kyle Zimmerman Will Huddleston Dr. Firas.
Spring CS-EE 481 University of Portland School of Engineering Project Eagle 03/04/03 Project Eagle Scott Davis Alison Hawkins Anthony Waliser.
Marco Pagani Product Manager. Agenda The system: main components Features References.
ECOLAB CLEANING CADDY Rethinking Daily Cleaning Daily Disinfecting Better Results Lower Total Cost.
EEL 5666 Intelligent Machines Design Laboratory JAWS Summer 1998 BY: Kurnia Wonoatmojo.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
A.I. and the Automation of Oil Clean Up
Lab Safety Policies Don’t stand on lab chairs
Problem Definition Review
TG-1101 Engineering Design I Introduction to “Total Design” and “Systems Engineering Design Process” (Week 2)
Presentation transcript:

Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber Project Gulfstream Curtis Christiansen Jordan Hodge Jordan Lyford Troy Mills Wilson Schreiber

Agenda Background Problem Statement Solution Statement System Overview Design Concepts o Mechanical o Electrical o Software Assignments Schedule Budget

Background Many barns that contain livestock require some method to contain the animal waste and make it easy to clean Wood shavings are typically spread to make cleanup easier

Problem Statement Wood shavings may make cleanup easier, but it is still tedious. The shavings still need to be collected and removed.

Solution Statement Our solution consists of Autonomously driven vehicle with a vacuum source to collect the material Spiraling navigation Material collection storage area, with an auger disposal Docking station for disposal (HomeBase)

System Overview Vacuum Pump Storage Bin Vacuum Hose Auger Out (when full & docked) Mobility Platform w/ Micro-controller and on-board power Collection Manifold Sensors A: HomeBase Receiver B: Bin Full Sensor C: Bin Empty Sensor D: Wheel Encoder E-F: Obstacle Sensors HomeBase Transmitter

System Overview - Navigation

Design Concepts - Mechanical

Current Design - Mechanical

Design Concepts - Electrical

Design Concepts - Power

Design Concepts - Navigation Software

Current Assignments Troy: Bin, Auger Hodge: Navigation, CAD Lyford: Vacuum, HomeBase software Curtis: Obstacle detection software, CAD, Scoop Wilson: Navigation, Bumper

Schedule Week 1 (8/30 - 9/3) o Brainstorming, Vacuum Testing, Sensor Bumper, MARV Wiring Week 2 (9/7 - 9/10) o MARV Training & Testing, Further concept development, Vacuum testing Week 3 (9/13 - 9/17) o MARV Navigation, Power systems, Vac. testing, Bin/Auger prototypes Week 4 (9/20 - 9/24) o MARV Nav., Bin construction, Implement nav. sensors, Vacuum testing Week 5 (9/ /1) o MARV Navigation, Bin construction, Mount vacuum and scoops Week 6 (10/4 - 10/8) o MARV Navigation, Implement bin sensors, Final mounting Week 7 (10/ /22) o Engineering Verification and Testing, Problem corrections Week 8 (10/ /29) o Engineering Verification and Testing, Problem corrections

Preliminary Budget Auger - $20 Vacuum Accessories - $40 Stock - $50 Fittings and Fasteners - $30 Bin - $25 Sensors - $60 Total - $225

Questions