October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.

Slides:



Advertisements
Similar presentations
Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
INTRODUCTION TO THE NEW SUBPART R Prepared by the U.S. Department of Labor, OSHA Office of Construction Standards and Compliance Assistance.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Specification section 3.3
Instrument Space Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
RACKS AND CABLES Peter Kim SLAC LST Install Readiness Review May 5, 2004.
October 21, 2003LST Mechanical Design Review - SLACN. Yu BaBar IFR Upgrades An FEA Study of the Effects of Adding Brass Plates in the IFR.
10/21/03H.J. Krebs1 LST Mechanical Design Review Brass Absorber Design H.J. Krebs October 21, 2003.
1 RAL Integration Issues MICE Collaboration Meeting, Osaka, August 1-3, 2004 Elwyn Baynham, Paul Drumm, Yury Ivanyushenkov, Tony Jones RAL.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review West Coast Team Mechanical Engineering and Design Manpower & Organization H. James Krebs October.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
May 5, 2004H.J. Krebs LST Installation Readiness Review 2004 IR-2 Installation Schedule H.J. Krebs May 5, 2004.
March 23, 2009H.J. Krebs1 BaBar D&D Schedule & Budget Overview H. James Krebs March 23, 2009.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2004 IR-2 Installation Schedule H.J. Krebs October 22, 2003.
May 5, 2004H.J. Krebs LST Installation Readiness Review Brass Absorber Production H.J. Krebs May 5, 2004.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
IFR End Door Enhancement Mechanical Engineering Status & Installation Issues H. James Krebs June 23, 2001.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
High Schools United with NASA to Create Hardware (HUNCH)
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
HALL B TUNNEL NAVIGATION Allen Ellis 5-October-2012 version 2 I have measured the Hall B truck ramp (tunnel). The smallest area is the entrance from the.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
ORKA Preservation Task Force ORKA Preservation Task Force first meeting Wednesday, February 8, Notes by Peter H. Garbincius Notes from meeting are.
11/15/02H.J. Krebs IFR Improvement Phase II (Barrel) Mechanical Engineering Issues H. James Krebs November 15, 2002.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
Status report AHCAL Mechanics Karsten Gadow CALICE Collaboration Meeting KEK, Studies of AHCAL absorber structure stability.
SiD Platform Deformation Studies John Amann ILC Mechanical Engineering 11/21/06.
The HCAL barrel absorber structure
Global Design Effort Magnetic and Mechanical FEA of SiD IRENG07 Bob Wands September 18, 2007.
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
October 7, 2009H.J. Krebs1 Super B WorkShop Overview of BaBar Detector Assembly/Installation Documentation Jim Krebs.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Summary of Platform and Hilman Rollers Deformation Studies John Amann ILC Mechanical Engineering 7/11/07.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
SuperB IFR mechanics of IFR prototype – by C. Fanin
Escalator Installation
MICE Partial Return Yoke Mechanical Design
Endcap shielding senarios:
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
LST Mechanical Design Review
Integration and IR Hall
LST Module Installation
RPC and LST at High Luminosity
GLAST Large Area Telescope:
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Limited Streamer Tube Project Summary
BaBar LST Upgrade Richard F Boyce
Presentation transcript:

October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003

October 22, 2003H.J. Krebs2 Mechanical Installation Preparation IR-12 will be the location of most mechanical preparation work during 2004 & 2005 Why IR-12? –IR-12 Hall is very similar to IR-2 Hall Same floor plan Identical 50/10 ton crane combination –We need space IR-12 is empty IR-2 is presently occupied with BaBar related items –Present status 3 technical support staff now housed at IR-12 Engineering offices are under construction –Estimated completion November 1 –Jim Krebs & Zohrab Vassilian move to IR-12 immediately after completion of this review

October 22, 2003H.J. Krebs3 IR-2

October 22, 2003H.J. Krebs4 IR-12

October 22, 2003H.J. Krebs5 IR-12 Activities Pre-installation preparation of brass plates –Radius corners –Drill & tap threaded holes for slide screws and swivel shackles –Adjust camber if necessary –Stage plates for assembly BaBar model –Build a fairly crude but full scale mock-up of the forward end of BaBar including: Barrel assembly simulating corner blocks removed FWD end doors FWD PEP pier FWD PEP beam line

October 22, 2003H.J. Krebs6

October 22, 2003H.J. Krebs7

October 22, 2003H.J. Krebs8 12” Thick (Z) Sextant Prototype

October 22, 2003H.J. Krebs9 Sextant Iron Cable Channel

October 22, 2003H.J. Krebs10

October 22, 2003H.J. Krebs11

October 22, 2003H.J. Krebs12

October 22, 2003H.J. Krebs13 IR-12 Activities Purpose of Model –Construct elevator platform Test function Check for interferences with end doors, beamline and PEP pier Load test Modify as necessary for corrections or improvements –Brass installation preparation Test installation hardware Load test Practice brass plate installation Brass push/pull test (see talk by Allen Constable) –LST detector installation preparation Test installation hardware Practice LST detector installation –A full Z length (3750mm) gap model exists for this

October 22, 2003H.J. Krebs14 Full Z Length (Layer 17) Gap Model

October 22, 2003H.J. Krebs15 Full Z Length (3750mm) Gap Model

October 22, 2003H.J. Krebs16 IR-12 Activities Steel handling fixtures –Train technical support staff –Check centers of gravity –Determine appropriate rigging –Load test –Function test, if possible –Modify as needed

October 22, 2003H.J. Krebs17 Test of End Plug Fixture

October 22, 2003H.J. Krebs18 Test of End Plug Fixture (Cont’d)

October 22, 2003H.J. Krebs19 Test of End Plug Fixture (Cont’d)

October 22, 2003H.J. Krebs20 Conclusions and Comments The full scale model will be a valuable tool for installation preparation –Earthquake bracing must be designed for this model –EQ committee approval approximately mid November –Construction of model shall commence end of November All support personnel will be trained using actual hardware Hardware will be tested to assure fit function and safe operation Brass absorber will be prepared and staged for installation