PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
Chapter 3 Project Management. Chapter 3 Project Management.
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
1 Chapter 3 part 1 Project Management. 2 Why is Project Management Important?  Why do I need to know this stuff? –Relevant across functional areas 
Project Management Operations -- Prof. Juran. 2 Outline Definition of Project Management –Work Breakdown Structure –Project Control Charts –Structuring.
18-1Project Management Chapter 18 Project Management.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Project Management Operations.
Chapter 16 – Project Management
J0444 OPERATION MANAGEMENT Project Management Pert 5 Universitas Bina Nusantara.
Chapter 16 – Project Management
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
4–14–1. 4–24–2 Chapter Four Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Irwin/McGraw-Hill Project Management  Project series of related jobs usually directed toward some major output and requiring a significant period of time.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Operations Management Project Management
Chapter 3 Project Management.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Project Management Project 01 – OFF CLASS. 3 Project Management Project – series of related jobs usually directed toward some major output and requiring.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Operations Management For Competitive Advantage 1 Project Management Operations Management For Competitive Advantage Chapter 3.
PROJECT MANAGEMENT Chapter Four Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Structuring Projects.
Intro : Project Management. 1.Project : series of related jobs usually directed toward some major output and requiring a significant period of time to.
1 Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure  Project Control Charts  Structuring Projects  Critical.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Chapter 10. Activity-on-Node Network Fundamentals X Y Z Y and Z are preceded by X Y and Z can begin at the same time, if you wish (B) ABC A is preceded.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
MBA 8452 Systems and Operations Management
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
© The McGraw-Hill Companies, Inc., Project Management CPM and PERT.
Tata McGraw CHAPTER 3 Project Management. Chapter 3 Project Management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Operations Fall 2015 Bruce Duggan Providence University College.
Chapter 3 Project Management.
© The McGraw-Hill Companies, Inc., Chapter 3 Project Management.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
1 Slides used in class may be different from slides in student pack Chapter 3 Project Management  Definition of Project Management  Work Breakdown Structure.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
2010© Wiley Chapter 16 – Project Management Operations Management by R. Dan Reid & Nada R. Sanders 4 th Edition © Wiley PowerPoint Presentation by R.B.
Project Management.
Chapter 3 Project Management. Chapter 3 Project Management.
Project Management Chapter Topics
Project Management Operations -- Prof. Juran.
Chapter 4: Project Management
Project Planning & Scheduling
Project Planning & Scheduling
Critical Path Method (CPM). Background & History Developed in the 1950s by the US Navy & Du Pont. Originally, the critical path method considered only.
Project Planning and Budgeting
Chapter 3 Project Management.
Project Management Operations -- Prof. Juran.
Presentation transcript:

© The McGraw-Hill Companies, Inc., Chapter 3 Project Management

© The McGraw-Hill Companies, Inc., Definition of Project Management Project Control Charts Structuring Projects Work Breakdown Structure Critical Path Scheduling —CPM with a Single Time —CPM with Three Time Estimates OBJECTIVES

© The McGraw-Hill Companies, Inc., Project Management Defined Project —A series of related jobs usually directed toward some major output and requiring a significant period of time to perform Project Management —The management activities of planning, directing, and controlling resources (people, equipment, material) to meet the technical, cost, and time constraints of a project

© The McGraw-Hill Companies, Inc., Project Management Project are usually: —Infrequent —Exact duration is difficult to estimate —Control may be difficult because of: Makeup of the project team Expert among experts

© The McGraw-Hill Companies, Inc., Structuring Projects: Pure Project Defined A pure project is where a self-contained team works full-time on the project

© The McGraw-Hill Companies, Inc., Structuring Projects Pure Project: Advantages The project manager has full authority over the project Team members report to one boss Shortened communication lines Team pride, motivation, and commitment are high

© The McGraw-Hill Companies, Inc., Structuring Projects: Pure Project Disadvantages Duplication of resources —Equipment and people not shared across projects Organizational goals and policies are ignored —Team members detached from headquarters Lack of technology transfer —Due to weakened functional division Team members have no functional area "home“ —Project termination often delayed as members worry about life after the project

© The McGraw-Hill Companies, Inc., Structuring Projects: Functional Projects Defined President Research and Development EngineeringManufacturing Project A Project B Project C Project D Project E Project F Project G Project H Project I A functional project is housed within a functional division Example, Project “B” is in the functional area of Research and Development.

© The McGraw-Hill Companies, Inc., Structuring Projects: Functional Project Advantages A team member can work on several projects Technical expertise is maintained within the functional area The functional area is a “home” after the project is completed Critical mass of specialized knowledge

© The McGraw-Hill Companies, Inc., Structuring Projects: Functional Project Disadvantages Aspects of the project that are not directly related to the functional area get short-changed Motivation of team members is often weak Needs of the client are secondary and are responded to slowly

© The McGraw-Hill Companies, Inc., Structuring Projects: Matrix Project Organization Structure President Research and Development Engineering Manufacturing Marketing Manager Project A Manager Project B Manager Project C

© The McGraw-Hill Companies, Inc., Structuring Projects: Matrix Project Advantages Enhanced communications between functional areas Pinpointed responsibility Duplication of resources is minimized Functional “home” for team members Policies of the parent organization are followed

© The McGraw-Hill Companies, Inc., Structuring Projects: Matrix Projects Disadvantages Too many bosses —Functional manager often listened to first because of direct influence on promotions and raises Depends on project manager’s negotiating skills Potential for sub-optimization —PM’s could hoard resources for own projects —Other projects could be harmed

© The McGraw-Hill Companies, Inc., Phases of Project Management Planning —Work breakdown structure —Feasibility study —Precedence determination Scheduling —Construct the chart and apply times —Identify priorities Execution and control —Review and modify the project

© The McGraw-Hill Companies, Inc., Work Breakdown Structure Defined Program Project 1Project 2 Task 1.1 Subtask Work Package Level Task 1.2 Subtask Work Package A work breakdown structure defines the hierarchy of project tasks, subtasks, and work packages

© The McGraw-Hill Companies, Inc., Work Breakdown Structure Allows the elements to be worked on independently Make them manageable in size Give authority to carry out the program Monitor and measure the program Provide the required resources

© The McGraw-Hill Companies, Inc., Project Control Charts: Gantt Chart Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Activity 6 Time Vertical Axis: Always Activities or Jobs Horizontal Axis: Always Time Horizontal bars used to denote length of time for each activity or job.

© The McGraw-Hill Companies, Inc., Network-Planning Models A project is made up of a sequence of activities that form a network representing a project The path taking longest time through this network of activities is called the “critical path” The critical path provides a wide range of scheduling information useful in managing a project Critical Path Method (CPM) helps to identify the critical path(s) in the project networks

© The McGraw-Hill Companies, Inc., Prerequisites for Critical Path Methodology A project must have: well-defined jobs or tasks whose completion marks the end of the project; independent jobs or tasks; and tasks that follow a given sequence.

© The McGraw-Hill Companies, Inc., Types of Critical Path Methods CPM with a Single Time Estimate —Used when activity times are known with certainty —Used to determine timing estimates for the project, each activity in the project, and slack time for activities CPM with Three Activity Time Estimates —Used when activity times are uncertain —Used to obtain the same information as the Single Time Estimate model and probability information Time-Cost Models —Used when cost trade-off information is a major consideration in planning —Used to determine the least cost in reducing total project time

© The McGraw-Hill Companies, Inc., Steps in the CPM with Single Time Estimate 1.Activity Identification 2.Activity Sequencing and Network Construction 3.Determine the critical path —From the critical path all of the project and activity timing information can be obtained

© The McGraw-Hill Companies, Inc., Example 1. CPM with Single Time Estimate Consider the following consulting project: Develop a critical path diagram and determine the duration of the critical path and slack times for all activities. ActivityDesignationImmed. Pred.Time (Weeks) Assess customer's needsANone2 Write and submit proposalBA1 Obtain approvalCB1 Develop service vision and goalsDC2 Train employeesEC5 Quality improvement pilot groupsFD, E 5 Write assessment reportGF1

© The McGraw-Hill Companies, Inc., Example 1: First draw the network A(2)B(1) C(1) D(2) E(5) F(5) G(1) ANone2 BA1BA1 CB1CB1 DC2DC2 EC5EC5 FD,E5 GF1GF1 Act.Immed. Pred. Time

© The McGraw-Hill Companies, Inc., Example 1: Determine early starts and early finish times ES=9 EF=14 ES=14 EF=15 ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=4 EF=9 ES=4 EF=6 A(2)B(1) C(1) D(2) E(5) F(5) G(1) Hint: Start with ES=0 and go forward in the network from A to G.

© The McGraw-Hill Companies, Inc., Example 1: Determine late starts and late finish times ES=9 EF=14 ES=14 EF=15 ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=4 EF=9 ES=4 EF=6 A(2)B(1) C(1) D(2) E(5) F(5) G(1) LS=14 LF=15 LS=9 LF=14 LS=4 LF=9 LS=7 LF=9 LS=3 LF=4 LS=2 LF=3 LS=0 LF=2 Hint: Start with LF=15 or the total time of the project and go backward in the network from G to A.

© The McGraw-Hill Companies, Inc., Determining the Critical Path & Slack A path is a sequence of connected activities running from start to end node in a network The critical path is the path with the longest duration in the network —It is also the minimum time, under normal conditions, to complete the project —Delaying activities on the critical path will delay completion time for the project A slack is amount of scheduling flexibility —Critical activities have no slacks

© The McGraw-Hill Companies, Inc., Example 1: Critical Path & Slack ES=9 EF=14 ES=14 EF=15 ES=0 EF=2 ES=2 EF=3 ES=3 EF=4 ES=4 EF=9 ES=4 EF=6 A(2)B(1) C(1) D(2) E(5) F(5) G(1) LS=14 LF=15 LS=9 LF=14 LS=4 LF=9 LS=7 LF=9 LS=3 LF=4 LS=2 LF=3 LS=0 LF=2 Duration = 15 weeks Slack=(7-4)=(9-6)= 3 Wks SLACK=LS-ES=LF-EF A PATH IS CRITICAL IF: ES=LS, EF=LF, and EF-ES=LF-LS=D

© The McGraw-Hill Companies, Inc., CPM with Three Activity Time Estimates Task times assumed variable (probabilistic) The variability is based on the beta distribution Uses three time estimates —Optimistic —Most Likely —Pessimistic Consolidates them into one expected time Then calculates ES, EF, LS, LF, & CP as in before

© The McGraw-Hill Companies, Inc., Example 2. CPM with Three Activity Time Estimates

© The McGraw-Hill Companies, Inc., Example 2. Expected Time Calculations ET(A)= 3+4(6)+15 6 ET(A)=42/6=7

© The McGraw-Hill Companies, Inc., Example 2. Network A(7) B (5.333) C(14) D(5) E(11) F(7) H(4) G(11) I(18) Duration = 54 Days ES=0 EF=7 ES=7 EF=21 ES=21 EF=32 ES=32 EF=36 ES=36 EF=54 ES=0 EF=5.3 ES=5.3 EF=16.3 ES=7 EF=12 ES=12 EF=21 LS=0 LF=7 LS=36 LF=54 LS=32 LF=36 LS=25 LF=36 LS=19.7 LF=25 LS=25 LF=32 LS=20 LF=25 LS=21 LF=32 LS=7 LF=21

© The McGraw-Hill Companies, Inc., Example 2. Probability Exercise What is the probability of finishing this project in less than 53 days? What is the probability of finishing this project in less than 53 days? p(t < D) T E = 54 t D=53

© The McGraw-Hill Companies, Inc., (Sum the variance along the critical path.)

© The McGraw-Hill Companies, Inc., There is a 43.8% probability that this project will be completed in less than 53 weeks. p(Z < -.156) =.438, or 43.8 % (NORMSDIST(-.156) T E = 54 p(t < D) t D=53

© The McGraw-Hill Companies, Inc., Example 2. Additional Probability Exercise What is the probability that the project duration will exceed 56 weeks?

© The McGraw-Hill Companies, Inc., Example 2. Additional Exercise Solution p(Z >.312) =.378, or 37.8 % (1-NORMSDIST(.312)) t T E = 54 p(t < D) D=56

© The McGraw-Hill Companies, Inc., Time-Cost Models Basic Assumption: Relationship between activity completion time and project cost Time Cost Models: Determine the optimum point in time-cost tradeoffs — Activity direct costs — Project indirect costs — Activity completion times

© The McGraw-Hill Companies, Inc., Time-Cost Model Trade-Offs Prepare a CPM-type network listing — Normal and crash times for each — Normal and crash costs for each Determine incremental cost per unit of time each activity is expedited — Incremental cost =(CC-NC)/(NT-CT) Calculate the critical path Shorten the CP at the least cost

© The McGraw-Hill Companies, Inc., Time-Cost Model: Example For the project with the following times, find the cost of reducing its duration to its lowest possible time. If the project is reduced by just 2 days, how much would it cost? A26110 B59218 C463 8 D351 9 ActivityTimeCostTimeCostINCL=NT-CT NORMAL CRASH

© The McGraw-Hill Companies, Inc., A B D C ES= EF= ES= EF= ES= EF= ES= EF= LS= LF= LS= LF= LS= LF= LS= LF= A B D C ES= EF= ES= EF= ES= EF= ES= EF= LS= LF= LS= LF= LS= LF= LS= LF= A B D C ES= EF= ES= EF= ES= EF= ES= EF= LS= LF= LS= LF= LS= LF= LS= LF= A B D C ES= EF= ES= EF= ES= EF= ES= EF= LS= LF= LS= LF= LS= LF= LS= LF=

© The McGraw-Hill Companies, Inc., A B D C ES= EF= ES= EF= ES= EF= ES= EF= LS= LF= LS= LF= LS= LF= LS= LF= A B D C ES= EF= ES= EF= ES= EF= ES= EF= LS= LF= LS= LF= LS= LF= LS= LF= A B D C ES= EF= ES= EF= ES= EF= ES= EF= LS= LF= LS= LF= LS= LF= LS= LF= A B D C ES= EF= ES= EF= ES= EF= ES= EF= LS= LF= LS= LF= LS= LF= LS= LF=

© The McGraw-Hill Companies, Inc., CPM Assumptions/Limitations Project activities can be identified as entities (There is a clear beginning and ending point for each activity.) — But this is seldom true Project activity sequence relationships can be specified and networked — Sometime we do not know all project activities ahead of time

© The McGraw-Hill Companies, Inc., CPM Assumptions/Limitations Project control should focus on the critical path — But there are near-critical activities The activity times follow the beta distribution, with the variance of the project assumed to equal the sum of the variances along the critical path — But activities are infrequent. Can we assume normality? — Are we really sure that it is beta distributed?