GIS Development: Step5 - DB Planning and Design Step6 - Database Construction Step7 - Pilot/Benchmark (Source: GIS AsiaPacific, June/July & August/September.

Slides:



Advertisements
Similar presentations
DATA PROCESSING SYSTEMS
Advertisements

Components of GIS.
Geographic Information Systems “GIS”
The Role of Error Map and attribute data errors are the data producer's responsibility, GIS user must understand error. Accuracy and precision of map and.
Data Models There are 3 parts to a GIS: GUI Tools
Copyright, © Qiming Zhou GEOG1150. Cartography Data Models for Computer Cartography.
Geographic Information Systems GIS Software. 1. The Early GISs SURFACE II, by Kansa Geological Survey SYMAP, by Harvard Laboratory for Computer Graphics.
GIS for Environmental Science
MANAGING A GIS PROJECT. Starting Points for GIS: Do your homework: GIS, RS, GPS Get familiar with the terminology Gain general knowledge of spatial analysis:
GIS: The Grand Unifying Technology. Introduction to GIS  What is GIS?  Why GIS?  Contributing Disciplines  Applications of GIS  GIS functions  Information.
Maps as Numbers Getting Started with GIS Chapter 3.
1 presented by: Tim Haithcoat University of Missouri Columbia QA/QC and Risk Management.
Geographic Information Systems
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
IURC Digital Mapping Update Electric Utilities Task Force April 6, 2004.
GIS 200 Introduction to GIS Buildings. Poly Streams, Line Wells, Point Roads, Line Zoning,Poly MAP SHEETS.
Geographic Information Systems : Data Types, Sources and the ArcView Program.
NPS Introduction to GIS: Lecture 1
Computers: Tools for an Information Age
Information Systems Development and Acquisition Chapter 8 Jessup & Valacich Instructor: Ramesh Sankaranarayanan.
Data Input How do I transfer the paper map data and attribute data to a format that is usable by the GIS software? Data input involves both locational.
Introduction to ArcView ArcView_module_2 May 12, 10:40 AM.
USING GIS TO FOSTER DATA SHARING AND COMMUNICATION SEAN MURPHY IVS BURLINGTON, VT.
“DOK 322 DBMS” Y.T. Database Design Hacettepe University Department of Information Management DOK 322: Database Management Systems.
Geography 241 – GIS I Dr. Patrick McHaffie Associate Professor Department of Geography Cook County, % population < 5.
Introduction to GIS fGRG360G – Summer Geographic Information System Text Computer system GIS software Brainware Infrastructure Ray Hardware Software.
Design, Implementation and Maintenance
Rebecca Boger Earth and Environmental Sciences Brooklyn College.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
Geographic Information Systems GIS Software. 1. The Early GISs ► SURFACE II, by Kansas Geological Survey ► SYMAP, by Harvard Laboratory for Computer Graphics.
Welcome to Mapping Tom Sellsted – City of Yakima, Washington Vladimir Strinski – Hitech Systems.
Lecture 4 Data. Why GIS? Ask questions Solve a problem Support a decision Make Maps Involve others, share data, procedures, ideas.
Data Quality Issues-Chapter 10
Chapter 10.
MSS Technologies and the AIIM Grand Canyon Chapter present: Electronic Document Management System Needs Analysis.
ITEC224 Database Programming
GEOGRAPHICAL INFORMATION SYSTEM (GIS)
1 1 ISyE 6203 Radical Tools Intro To GIS: MapPoint John H. Vande Vate Spring 2012.
1 GIS Development: General Issues Step1 - Needs Assessment Step2 - Conceptual Design of GIS Step3 - Survey of Available Data Step4 - Evaluation of HW and.
Introduction to Interactive Media The Interactive Media Development Process.
OVERVIEW- What is GIS? A geographic information system (GIS) integrates hardware, software, and data for capturing, managing, analyzing, and displaying.
Geographic Information System GIS This project is implemented through the CENTRAL EUROPE Programme co-financed by the ERDF GIS Geographic Inf o rmation.
Copyright 2010, The World Bank Group. All Rights Reserved. COVERAGE, FRAMES & GIS, Part 2 Quality assurance for census 1.
GIS Data Structure: an Introduction
Data input 1: - Online data sources -Map scanning and digitizing GIS 4103 Spring 06 Adina Racoviteanu.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
GIS Development: Step8 - Acquisition of HW & SW Step9 - GIS System Integration Step10 - Application Development Step11 - GIS Use & DB Maintenance (Source:
Information: Policy, Strategy and Systems Module Overview
Copyright 2010, The World Bank Group. All Rights Reserved. Managing Mapping Operations Section B 1.
Teaching and Learning with Technology to edit Master title style  Allyn and Bacon 2002 Teaching and Learning with Technology lick to edit Master title.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
INTRODUCTION TO GEOGRAPHICAL INFORMATION SCIENCE RSG620 Week 1, Lecture 2 April 11, 2012 Department of RS and GISc Institute of Space Technology, Karachi.
GIS & Health ESPM 9: W 5-8 April 7, 2010 Instructors: Maggi Kelly Kevin Koy Mark O’Connor Geospatial Innovation Facility College of Natural Resources -
1 Overview Finding and importing data sets –Searching for data –Importing data_.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
INTRODUCTION TO GIS  Used to describe computer facilities which are used to handle data referenced to the spatial domain.  Has the ability to inter-
What is GIS ? A method to visualize, manipulate, analyze, and display spatial data “Smart Maps” linking a database to the map.
Crime Analysis and Mapping Jonathan Lewin. Impacting Crime Considerations in Developing a Crime Mapping Application.
WFM 6202: Remote Sensing and GIS in Water Management © Dr. Akm Saiful IslamDr. Akm Saiful Islam WFM 6202: Remote Sensing and GIS in Water Management Dr.
ESRI Education User Conference – July 6-8, 2001 ESRI Education User Conference – July 6-8, 2001 Introducing ArcCatalog: Tools for Metadata and Data Management.
Unit 17: SDLC. Systems Development Life Cycle Five Major Phases Plus Documentation throughout Plus Evaluation…
Data Storage & Editing GEOG370 Instructor: Christine Erlien.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
Geographic Information Systems “GIS”
INTRODUCTION TO GEOGRAPHICAL INFORMATION SYSTEM
Developing Information Systems
Geographic Information System
Geographic Information Systems
Lecture 2 Components of GIS
Database Design Hacettepe University
Presentation transcript:

GIS Development: Step5 - DB Planning and Design Step6 - Database Construction Step7 - Pilot/Benchmark (Source: GIS AsiaPacific, June/July & August/September 1998; and New York State Archives GIS Development Guides) Faculty of Computer Science University of Indonesia Dr. Aniati Murni Copyright ©AniatiMurni

2 GIS Development Cycle Needs Assessment Conceptual Design Database Planning and Design Available Data Survey Pilot / Benchmark HW and SW Survey Database Construction Acquisition of GIS HW and SW GIS System Integration Application Development GIS Use and Database Maintenance The GIS development cycle is based on the philosophy that one first decides what the GIS should do and then as a second activity decides on how the GIS will accomplish each task.

3 Step 5: DB Planning and Design Activities include the followings:  Select a source (document, map, digital file, etc.) for each entitiy and attribute included in E-R diagram;  Set-up the actual database design (logical and physical design);  Define the procedures for converting data from source media to database;  Define procedures for managing and maintaining the database.

4 Step 5: DB Planning and Design The quality of information  Information is stored in a database;  Bad construction and data error will give Garbage instead of Geographic Information System;  What kind of map projection will be used;  What scale is the data;  What is the coverage;  How much attribution should be included;  What is the attribute data format;  What is the data reliability;  How fast is it to be retrieved.

5 Step 5: DB Planning and Design Information required for database design:  A complete list of data, properly defined and checked for validity and consistency (from the master data list, E-R data model, and metadata entries);  A list of potential data source (maps, aerial photos, tabular files, digital files) cataloged and evaluated for accuracy and completeness (from available data survey);  The list of functional capabilities required from the GIS (from needs assessment). Such as visualization, spatial analysis, statistical analysis and modeling.

6 Step 5: DB Planning and Design Entities, Attributes, and Spatial Object Deep Ocean Shelf Upper Slope Rise Lower Slope Plateau or Terrace

7 Step 5: DB Planning and Design Plan for data sharing  Benefits of data sharing include: (i) the development of much larger database for far less cost; (ii) the development of more efficient interaction between public agencies; and (iii) all agencies shared the same up-to-date database / information.  Database maintenance requires two efforts: ongoing user training (how to maintain the database) and user support (who will be responsible for updating which data).

8 Step 5: DB Planning and Design Designing the Database  Most of databases in GIS software packages are based on the relational database model;  Two choices of using data table: as much data in one table or small/compact data in one table;  How you will represent the data: point, line, polygon, network, etc.

9 Step 5: DB Planning and Design Spatial Database  In the past, all Database System does not include spatial data; today Oracle already has Spatial Data Cartridge.  In GIS spatial data (point, line, polygon) can be used simultaneously. The data is stored using an index system.

10 Step 6: GIS Database Construction + Database construction can be divided into two major activities: ! creation of digital files from maps, air photos, tables, and other source documents; ! organization of the digital files into a GIS database.

11 Step 6: GIS Database Construction Database construction/conversion is the process of building the digital database from the source data - maps and tabular files. The main emphasis is management of the activity and quality assurance / quality control of the converted data. Close and effective management is critical factor in successful data conversion, where the conversion process is often “contracted out” and involves large quantities of source maps and documents.

12 Step 6: GIS Database Construction Data Conversion Manual digitizing using a digitizing tablet and cursor tool (puck); Scanning (converts lines and text into series of pixels); Raster to Vector Conversion (convert series of pixels into series of (x,y) coordinates points), this facility is usually provided by a GIS software; Hybrid solution (overlaying vector format data with an image provides a powerful graphic display tool; Entry of attribute data is done by joining a table of new attributes to an existing table already in the GIS; Acquisition of external digital data (integrating existing database with GIS should be carefully considered before buying a GIS system).

13 Step 6: GIS Database Construction GIS HW and SW for Data Conversion (digitizing and editing): Digitizing station: precision digitizing tablet, high resolution display terminal for digitizing, querying, displaying and editing data; Editing workstation: is used for QA/QC functions of conversion, has the same capability as digitizing station except for digitizing; Graphic data review / tabular data input workstation: is used for displaying and reviewing graphic data and for entering tabular attribute data associated with this graphic feature; Digitizing station: precision digitizing X terminal: allows for graphic display and input of data utilizing the X Window System communication protocol. The data conversion can be done in-house or out-contracted.

14 Step 6: GIS Database Construction Three basic entities of the geographical object data (Point- Line-Area) Source: Purwadhi (1997)

15 Step 6: GIS Database Construction GIS Data Model Graphics Data Index Map graphics represent all of the features (entities) on a map as points, lines, areas, or pixels; Tabular databases contain the attribute information which describe the entities (building, parcel, etc.); A common key (graphics data index) must be established between the map graphics and the tabular database records to create a link.

16 Step 6: GIS Database Construction Raster Data (pixels) Raster GIS Data Graphics Grid / RasterValue Attribute Table Cell ValueReal World Entity 2 Lake 3 Wooded 5 Built-up

17 Step 6: GIS Database Construction Vector GIS Data Vector GIS Polygon Layer Polygon Attribute Table Polygon Identity Attribute Numbet 1 Lake 2 Wooded 3 Built-up 1 2 3

18 Step 7: Pilot / Benchmark Pilot Study and Benchmark Tests  To demonstrate the functionality of the GIS software.  To show what the commercial GIS from the vendor can do.  To demonstrate to potential users and management what the GIS will do for them.  To show that the performance data of the GIS system can be determined. Deep Ocean Rise Lower Slope

19 Step 7: Pilot / Benchmark Objectives of A Pilot Study  A pilot study is a focused test to prove the utility of GIS within a local unit;  It is not a full GIS implementation;  It is not a GIS demonstration;  It is a test of how GIS can be deployed within an organization to improve operations. Deep Ocean Rise Lower Slope

20 Step 7: Pilot /Benchmark Benchmarking a System:  A benchmark is the process of testing various combination of hardware and software, and evaluating their functionality and performance. This test is usually important for short listed vendors. The same data set should be used to test all hardware software configuration.  Get a committee of 8-10 members to set up the benchmark test.  The tasks performed by the vendor should be measureable (time, ease of use, can the function be done, etc.), rating various aspects of the system, and rating also the vendor (teamwork, communication, technical skills).  Send out the outlines of task the vendor should do in the benchmark test including the setting up time, task performing time, how many people allowed to be in the testing process.

21 Step 7: Pilot / Benchmark Planning a pilot study includes:  creating a sample of the database;  testing the quality of source documents;  testing applications;  testing data management and maintenance procedures;  estimating data volumes;  estimating costs for data conversion;  estimating costs for staffing training. Shelf

22 Step 7: Pilot / Benchmark Procedures for carrying out a pilot study:  select applications from needs assessment;  determine study area;  review conceptual database design;  determine conversion strategy;  develop physical database design;  procure conversion services and develop conversion work plan;  commence source preparation;  develop acceptance criteria and qc plan;  develop data management and maintenance procedures;  test application;  evaluate and quantify results;  prepare cost estimates. Shelf