1 Global Biomarker Standardization Consortium Chairs: Holly Soares, Henrik Zetterberg, Piotr Lewczuk.

Slides:



Advertisements
Similar presentations
Manager Performance Evaluation
Advertisements

DE SREC Procurement Program Overview (877) x100 Call-in for this webinar is (917) PIN:
Responding to Sources Sought and Request for Information Charles Williams September 8, 2011.
DOL AME Grant RFPs Manufacturing Lab Equipment Pre-Award Webinar July 25, 2013.
Metadata Management – Our Journey Thus Far
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
Fusion GPS Externalization Pilot Training 1/5/2011 Lydia M. Naylor Research Lead.
Case Studies in Change Management IFF February 2009.
Evaluating Your STEM Outreach Program MISO Spring Workshop May 7, 2012 MISO Data Analytics Team Jeni Corn, Tricia Townsend, Alana Unfried
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
Field Questions. –Asked by sub or GC when discrepancy in construction docs or existing site conditions Design change verification request Field information.
Welcome to the Johnson Space Center Financial and Business Management Services Virtual Industry Day 1.
Updates, Best Practices & New Features Schedule of Classes Summer/Fall 2011.
21 August Agenda  Introductions  Logistics  Selecting a project  Working with a client.
1 Global Biomarker Standardization Consortium: CSF Reference Method Sub-group Chairs: Kaj Blennow & Henrik Zetterberg.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
U.S. Department of Agriculture eGovernment Program April 14, 2003 eGovernment Working Group Investment Year 2006 Planning/Budgeting Activities U.S. Department.
Notes of 21nov2011 Alz. Assoc. CSF Reference Method Sub-group.
DHHS COE Meeting Agenda May 16, 2012 Welcome Introductions Contract Compliance Reporting Open Window Updates Questions and Answers.
1 SPE & SEL Q&A Session with Bidders. 2 Agenda ►Introduction ►Guidelines ►Schedule of Events ►Q&A session.
MSD Total Supplier Performance and Inventory Control Keleigh Bicknell, William Darlington, Alex Resnick, Brian Woodard.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
Query Health Distributed Population Queries Implementation Group Meeting December 13, 2011.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Electronic Submission of Medical Documentation (esMD)
Copyright 2006 by Ironsclad Solutions, Inc. All rights reserved April 28, 2006 The Business Capture Process J. Jeffrey Irons.
Process Overview. Page 2 Agenda Problem Reporting and Escalation Procedure RMA Process Overview.
1 Status of the BCD GDE Area System Leaders Meeting (Jan.19-20, 2006) Nobu Toge (KEK)
IEEE P Architecture Subcommittee Conference Call January 24, IEEE P Architecture Subcommittee.
Quick Quote. Bernard (Contoso): I really like your solution. I think Microsoft cloud solutions can help us solve our productivity issues! But I’m still.
SYSTEM ANALYSIS AND DESIGN LAB NARZU TARANNUM(NAT)
John Philbrick PE, CCP, PMP
Update on the Alzheimer’s Association Quality Control (QC) program
Global Biomarker Standardization Consortium
The Alzheimer’s Association QC program for CSF biomarkers
New project request process training
Innovation Ecosystems Fellowship Overview
Microsoft Dynamics CRM User Group (CRMUG®)
CSF Round Robin Program
Pre-Investigational New Drug (pre-IND) Meeting with FDA
Please review these important Webinar Etiquette guidelines
Institute for Reference Materials and Measurements (IRMM)
Supply Chain Management Principles
2017 Update on the Alzheimer’s Association
Proposed Bay TMDL Schedule
IRMM/IFCC Project Overview
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Phase 2 Tollgate Review Discussion Template
Outcross Resources - Services Overview
Phase 2 Tollgate Review Discussion Template
Standards Development: An Overview
Have Instrument, make method; How new methods are made and validated
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
دورة حياة تطوير النظم system development life cycle
Data Quality Model Welcome to Everyone
Internal Audit Training
Workshop on Distributed Embedded Systems, Lorentz Center, 21–24 Nov.05
Phase 2 Tollgate Review Discussion Template
Legislative Budget Office (LBO) 2-Year Workplan
Collection Process and Collection Events Overview
TGh Status, meeting objectives and agenda
LAMAS Working Group 29 June-1 July 2016
User Guide Employee & Manager
HERUG Development requests Proposal
CXS TC First meeting summary
Annex A1.6.2b RU access to OBI RNE General Assembly 16 May 2018.
Presentation transcript:

1 Global Biomarker Standardization Consortium Chairs: Holly Soares, Henrik Zetterberg, Piotr Lewczuk

2 TEAM OBJECTIVES To create a certified reference material (i.e. human CSF pools) that can use by assay developers to create a gold standard for absolute and accurate measures of CSF Aβ42 and T-Tau. To create universal reference calibrators that can be used in the antibody independent reference method to measure absolute concentrations of CSF AB42 and T-tau To create a large pool of quality control material that the end user lab could use to check assay precision.

3 Certified Reference Material Many options –Immunodepleted matrix spiked in with endogenous peptide or engineered peptide –Matrix equivalent spiked in with endogeneous peptide or engineered peptide. –Native material (e.g. human CSF pools) Team agreement –Human CSF pools of sufficient quantity to provide primarily assay developers for 1-3 years. –Action Item: companies to get answer specific questions

4 Questions for company Where are companies (both IVD and pharma) getting as starting materials for both ab42 and tau? How to get common starting point of the materials? INNX-Manu able to report small overview presentation for next call; Source materials and share materials for next meeting Would like to hear from all companies about what they can and can’t share to the group. George Green to give update on outside 3 rd party opportunity. Henrik to give update on IFCC (?) from Dec. 16 (from JPMD mtg)

5 Issues Does group scope include collection of CSF pool or stop at certified ref materials? Cancel 19dec and meet next in Jan 2012 Holly to take first draft and send to all for input before we get those questions to IVD and pharma company permissions. Henrik and Kaj to give overview of QC program. Review process to take 3 weeks in one company’s estimate, thus attempt to get questions as quick as possible to enable internal company preparation and approval.

6 CRM Actions/notes 11/29/11 Henrik has submitted a proposal to IFCC to make reference material for analytes and it was approved. –IFCC would observe the project and IRMM would be actively involved as a partner that would guide the creation of the reference material. –IFCC requires a reference method. –The most feasible approach is to create a large pool and then test the pilot ref material for stability, homogeneity and stability. Henrik will update team on IFCC and IRMM activities at December call. Request more information from assay developers regarding reference materials –Manu (INNX/FBI) and Pankaj (MSD) to inquire on whether data can be shared –Holly to invite OCD/SBI and Roche to team discussions

7 Update QC program 11/29/11 Calibrators discussion will be tabled. And on the next call we should have a discussion to talk about the next steps there. QC issues: currently there are a few efforts towards this end, Bob asked that perhaps on another call we could have a discussion of the QC programs. Maria will schedule a webinar for later to do a good comparison between the two, the AA CSF QC and the German project of Piotr.

8 AGENDA 12 Dec 2011 Review of Objectives Review of Action items Introduction additional assay manufacturers USDS reference calibrator proposal Next steps

9 Future Call Dates Monday 12/12 - 6:30 am PST / 8:30 am CST / 9:30 am EST / 3:30 pm Sweden Monday 12/19 - 6:30 am PST / 8:30 am CST / 9:30 am EST / 3:30 pm Sweden