GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

Quality Assurance U. S. ITER Project Office U.S. ITER Project 1 November 15, 2006 U. S. ITER QUALITY ASSURANCE Gail Okulczyk, Presenter U. S. ITER Quality.
Mission Success Starts With Safety GSFC Electrostatic Discharge (ESD) Control Program Are you plugged in? Jeannette Plante, Program Manager, Code 300.
1 HYDROSTATIC TESTING Approved for Public Release.
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
USING NASA QUALITY STANDARDS NASA Academy of Aerospace (AAQ) Quality Mini-Workshop Ken Crane Quality Engineering Technical Discipline Team Lead NASA SAFETY.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Quality Management System
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
DATE: 28/11/2012 INSTRUCTOR: HANIF ULLAH Tutorial 7.
ISO 9000 Overview The Purpose of this Overview l “What is ISO 9000?” l What will it require from YOU, as a (Company) Employee?
NVLAP Overview and Accreditation Process March 2006.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
Dan Conlon Auditor Workshop “Output Matters” 14 July 2008.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Safety and Mission Assurance Jorg Fischer, PFP SMA Manager.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
INSPECTION AND ACCEPTANCE CRITERIA. PRODUCT CONFORMANCE Dimensional conformance - within tolerances as defined on product drawing Dimensional conformance.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Status Review – December 15, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 Survey & Process Review conducted at Teledyne on Nov. 14, 2003.
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
Safety and Mission Assurance Lockheed Martin Space Operations (LMSO) Science, Engineering, Analysis, and Test Operation Safety and Mission Assurance Activity.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
01.Oct.01 SPIRE BSM Product Assurance Team Briefing 1 BSM Product Assurance Plan Team Briefing & PA plan roll-out Ian Pain.
Accelerator Readiness Review October 31, 2006
EFW DFB Systems Assurance
EFW DFB Systems Assurance
Software and Systems Integration
THEMIS Mission Assurance
ISUAL Product Assurance
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
ISO 9001 Awareness Training.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
AS 9100 Awareness Training.
GLAST Large Area Telescope:
DOE Review of the LCLS Project October 2006
Presentation transcript:

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM & TEM-PS MRR – Part 3 LAT Senior Quality Engineer at General Technology Corporation (505) Ext Gamma-ray Large Area Space Telescope

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, Quality System Requirements  General Technology Corporation (GTC) is Certified to ISO 9001:2000 and AS9100-B in accordance with AIR5359B  GTC has provided a copy of their Quality Assurance Manual (GTC-1000) Rev. B –Applicable 2 nd tier documents include: GTC-1007, Customer Supplied Product GTC-1008, Material and Product Identification GTC-1009, Process Control GTC-1010, Inspection and Testing GTC-1011, Calibration Control GTC-1013, Nonconformal Material and Product GTC-1014, Corrective and Preventive Action GTC-1015, Material Control GTC-1022, Quality Planning

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, TEM & TEM-PS Assemblies QA Activities  TEM assembly vendor qualification  A quality survey was performed June at General Technology Corp. in Albuquerque, New Mexico –Survey team included LAT QA and GSFC QE –No issues were identified Excerpt from Survey Report »“General Technology Corporation (GTC) has demonstrated their ability to fabricate a flight worthy product through their process and quality controls.”  Technical Exchange Meeting took place at General Technologies on June 30 th  LAT QA, Electronics Engineering, and Manufacturing Engineering met with General Technologies technical staff to review and discuss technical requirements  On-site Quality Assurance and source inspection  LAT Quality Assurance Engineer will be on site, full time for source inspection and oversight at General Technologies –Individual will participate in Technical Exchange Meetings –Full time throughout all phases of hardware assembly and test

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, Workmanship Standards  ESD  GTC-2004 Electrostatic Discharge Sensitive (ESDS) Material Handling Procedure for Protection of Electronic Parts and Assemblies –MIL-STD-1686 Electrostatic Discharge Control Program –MIL-HDBK-263 Electrostatic Discharge Control Handbook  Training –All personnel who handle ESDS components are required to complete an ESD training course –Annual training is provided and documented  Facilities –Work Stations equipped with means for operator to connect with ground –Work Stations equipped with static dissipative work surface and inspected on monthly basis

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, Workmanship Standards  IPC/EIA J-STD-001C Requirements for Soldered Electrical and Electronic Assemblies.  Personnel trained and certified by in-house instructor.  IPC J-STD-001CS Space Applications Electronic Hardware Addendum to Requirements for Soldered and Electrical and Electronic Assemblies.  Personnel trained and certified by in-house instructor.  NASA STD Crimping, Interconnecting Cables, Harnesses and Wiring.  Individual operator certification to NASA STD is not required. GTC’s internal workmanship standards have been approved. –Excerpt from NASA QE Survey Report “The criteria for implementing NASA can be included in the statement of work and would require no further action.”

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, Inspection Requirements  GTC will perform Receiving Inspection, In-Process Inspections and Final Inspections per their internal inspection plan and procedures.  SLAC Quality Assurance Engineer will approve plan prior to any assembly activities  Mandatory Inspection Points (MIP’s) to be performed by SLAC Source Inspector. MIP’s will be documented on GTC’s traveler and stamped by the SLAC Source Inspector after the inspection/witness activity.  100% Prior to conformal coat  100% Post conformal coat  Witness of environmental test activities  Witness of functional and acceptance electrical test  Final Inspection and End Item Data Package review

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, Oversight and Surveillance Activities  Surveillance  SLAC Source Inspector on-site full time with full access to all production activities associated with GLAST. –Conformance to drawing specifications, SOW, GTC procedures and workmanship standards –Polymeric material shelf life dates –Adhesive mix records –Mate/Demate logs –Calibration records –Torque Logs –ESD

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, Oversight and Surveillance Activities  Audits  SLAC Source Inspector has the right to conduct audits with prior coordination with GTC.

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, MRB Process  Documents  GTC-1013 Nonconforming Material and Product  GTC-2075 Process Specification, In-Process Material/Product Nonconformance  NCMR Nonconformance Material/RMA report  Procedure  GTC will identify, segregate, document and report all parts, materials, CCA’s and electronic assemblies/units which do not meet drawing or specification requirements. –Defects that can not be reworked using approved procedures –Receipt of SLAC supplied material –Failures or anomalies –Nonconformances found at final Inspection

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, MRB Procedure  GTC will provide immediate notification to SLAC source inspector of NCMR initiated –Description of nonconformance Violation of drawing or specification IS and S/B conditions –Location by drawing reference zones –Part number –Serial number –Quantity –Corrective/Preventive Action as available  SLAC Source Inspector will convene a MRB with SLAC within 24 hours –Darren Marsh, LAT Performance Assurance –Gunther Haller, LAT DAQ Subsystem Manager (or designee) –LAT Manufacturing Engineering (as applicable)

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, MRB Procedure  Disposition –Quality Manager from GTC receives disposition instructions from SLAC Source Inspector. Use as Is Repair Scrap

GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, End Item Data Package  Certifications of Compliance for each assembly  Copies of travelers/shop orders  Nonconformance Reports  As-Built drawing and parts list  As-Built configuration record  In process and final test reports  End Item acceptance test data including environmental test  Inspection reports as applicable  Mate/Demate log for flight connectors  Digital Photos