5 th February 2010 FP7 Prep WP9000 Progress Meeting 1 Update Tim Morris Durham University FP7 Prep WP 9340.

Slides:



Advertisements
Similar presentations
1 CANARY Laser Guide Star Multi-Object Adaptive Optics (LGS MOAO) E-ELT PATHFINDER ON-SKY DEMONSTRATOR FOR EAGLE Richard Myers Durham University Royal.
Advertisements

The Project Office Perspective Antonin Bouchez 1GMT AO Workshop, Canberra Nov
AO188/LGS status AO188 development group(Subaru Telescope, NAOJ) (JST)
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
NGAO System Design Phase Update Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max, Sean Adkins for NGAO Team SSC Meeting February 20, 2008.
PALM-3000 Management Update A. Bouchez, J. Roberts Team Meeting #15 10/29/09.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
PALM-3000 Management Update A. Bouchez Team Meeting #9 10/22/2008.
1 Laser Guide Star Wavefront Sensor Mini-Review 6/15/2015Richard Dekany 12/07/2009.
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
LGS Project Meeting February 1, 2006 Agenda 1.IPT status updates: Laser facility, AO optomechanics, AO software (Bouchez, Roberts, Trinh; 30 min) 2.Sum-Frequency.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Software Requirements Review Thang Trinh PALM-3000 Requirements Review, Caltech Campus November 12, 2007.
NGAO Status R. Dekany January 31, Next Generation AO at Keck Nearing completion of 18 months System Design phase –Science requirements and initial.
PSWG March Adaptive Optics Systems Engineering on GMT Peter McGregor.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Project Manager Tim Norton.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO Team Meeting Management Peter Wizinowich March 19, 2009.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
NGAO Instrumentation Preliminary Design Phase Planning September 2008 Sean Adkins.
AO Opto-mechanical System Design Status, Issues, and Plans Don Gavel UCO/Lick Observatory (for the opto-mechanical design team) Keck NGAO Team Meeting.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Low Cost Fundus Camera P15590 December 11th, 2014
AO proposal for FP7 June 2006, N. Hubin Proposal for a European Adaptive Optics Program to be funded in the frame of FP7 N. Hubin European Southern Observatory.
“Milliarcsecond imaging in the UV- Optical domains: Preparing the way to space borne Fresnel Imagers”, Nice, Sept INSTALLING A FRESNEL IMAGER.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
MULTIPLE OBJECT ADAPTIVE OPTICS Mixed NGS/LGS Tomography Tim Morris (Durham University, UK) and Eric Gendron, Alastair Basden, Olivier Martin, David Henry,
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
1 Manal Chebbo, Alastair Basden, Richard Myers, Nazim Bharmal, Tim Morris, Thierry Fusco, Jean-Francois Sauvage Fast E2E simulation tools and calibration.
The on-sky NGS/LGS MOAO demonstrator for EAGLE Tim Morris Durham University.
 MOAO description  MOAO on the E-ELT  CANARY Phase A  System calibration  On-sky results  CANARY Phase B.
Real-time control system verification for ELT AO systems Alastair Basden 1, Richard Myers 1, Tim Morris 1, Ali Bharmal 1, Urban Bitenc 1, Nigel Dipper.
Telescope Integration and Tests Tuesday Afternoon.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
ATLAS The LTAO module for the E-ELT Thierry Fusco ONERA / DOTA On behalf of the ATLAS consortium Advanced Tomography with Laser for AO systems.
Pg 1 Spherical Grating Spectrographs CALSYS Upgrade Darragh O’Donoghue Why? Unacceptably low light throughput resulting in loss of science time while getting.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
Status report of AO188+LGS (+future AO) Yutaka Hayano (Subaru Telescope, NAOJ) S. Oya, M. Hattori, Y. Saito, Y. Minowa, M. Ito, H. Terada, T.S. Pyo, H.
A global approach to ELT instrument developments J.-G. Cuby for the French ELT WG.
Introduction of RAVEN Internal meeting on future instrument projects at Subaru Shin Oya ( Subaru Telescope/NAOJ) ‏ Hilo.
Experimental results of tomographic reconstruction on ONERA laboratory WFAO bench A. Costille*, C. Petit*, J.-M. Conan*, T. Fusco*, C. Kulcsár**, H.-F.
Tomography in Adaptive Optics Multiple Object Adaptive Optics CANARY Status and Results Impact on future AO systems.
Pre-focal wave front correction and field stabilization for the E-ELT
Overview Science drivers AO Infrastructure at WHT GLAS technicalities Current status of development GLAS: Ground-layer Laser Adaptive optics System.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
AO4ELT, Paris A Split LGS/NGS Atmospheric Tomography for MCAO and MOAO on ELTs Luc Gilles and Brent Ellerbroek Thirty Meter Telescope Observatory.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Introduction of RAVEN Subaru Future Instrument Workshop Shin Oya (Subaru Telescope) Mitaka Adaptive Optics Lab Subaru Telescope Astronomical.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Pyramid sensors for AO and co-phasing
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
TSF Upgrade Project Overview Resources Plans and Timetable
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
Presentation transcript:

5 th February 2010 FP7 Prep WP9000 Progress Meeting 1 Update Tim Morris Durham University FP7 Prep WP 9340

5 th February 2010 FP7 Prep WP9000 Progress Meeting 2 Contents Brief CANARY overview –Relationship to EAGLE –CANARY Consortium CANARY Status FP7 Prep Specifics –Systems Engineering / Key Component Selection Status –Deliverables and Schedule

5 th February 2010 FP7 Prep WP9000 Progress Meeting 3 CANARY overview EAGLE – Phase A instrument concept study for E-ELT –Multi-IFU with LGS/NGS MOAO CANARY complements SESAME –Lab demonstrator CANARY consortium: LESIA, Durham, ONERA, UKATC, LAM Location: 4.2m WHT La Palma (Nasmyth platform enclosure) is the on-sky demonstrator for PhaseOn-sky DatesConfiguration A July 2010 FDR Dec 08 3 NGS tomo., low-order 52-act DM, truth sensor, near-IR camera, C n 2 mon. B Q2 - Q FDR Dec 09 Adds 4 Rayleigh LGS + WFS C Q2 - Q Adds High-order 1024-act DM

5 th February 2010 FP7 Prep WP9000 Progress Meeting 4 CANARY Overview CANARY is funded by a combination of French and UK funding, along with FP7 Prep and FP7 OPTICON JRA-1 Additional funding from: –STFC –INSU –Observatoire de Paris –Durham University UK STFC funding for Phase C approved but frozen –Decision expected soon! FP7 Prep funding covers systems engineering support and key component selection Layout of upgraded Nasymth platform at the WHT

5 th February 2010 FP7 Prep WP9000 Progress Meeting 5 CANARY Status Phase A on-sky dates awarded from 21 st to 28 th July (6 nights) –2 months later than originally planned Principal optomechanical subsystems have been assembled and are undergoing testing CANARY instrument control system is being integrated with the hardware Full system integration in Durham begins next week

5 th February 2010 FP7 Prep WP9000 Progress Meeting 6 Key Components: Telescope Simulator Passed initial acceptance tests in December 2009 Minor modifications required to phase screen motors and fibre source clamps Modifications completed and system being delivered to Durham next week Field lens/Fold mirror assembly also completed –Required for AIT tests with the Telescope Simulator Telescope simulator integration (UKATC)

5 th February 2010 FP7 Prep WP9000 Progress Meeting 7 Key Components: AO Path AO path has been aligned –Dummy DM flat mirror used –Avoids DM flattening routine –Allows alignment jig design WFE ~55nm RMS –Error budget allowance of 104nm RMS Throughput 633nm with DM flat –Expected 69% in V-band with DM –ADONIS DM to be measured AO Path aligned with dummy flat DM (Durham) Flat mirror in place of DM

5 th February 2010 FP7 Prep WP9000 Progress Meeting 8 Key Components: Low-order DM ADONIS DM re-polished –Less than 50nm RMS error after flattening 4% open-loop error after calibration Tested using SESAME –Closed-loop SR = 0.39 –Open-loop SR = 0.35 Currently integrated in Durham –DMC testing –Truth Sensor interfaces –NCPA removal Closed-loop CANARY DM and Truth Sensor testbench (Durham)

5 th February 2010 FP7 Prep WP9000 Progress Meeting 9 Key Components: NGS WFSs 4 x Andor Ixon (E2V 128x128 EMCCD) selected –3 x open-loop tomography –1 x closed-loop All cameras have been interfaced to the RTC –2 cameras in Paris –2 cameras in Durham Cameras have been integrated with: –SESAME for open-loop tomography tests (LESIA) –DM testbench for closed-loop control and interface tests (Durham) NGS Pickoff optics aligned (LESIA) –Installed on 2 of 3 cameras Truth sensor being integrated with main AO path (Durham) NGS pickoff and WFS optics before alignment (LESIA)

5 th February 2010 FP7 Prep WP9000 Progress Meeting 10 Key Components: NGS TAS Target Acquisition System assembled WFSs to be mounted after SESAME tests completed Motion control interface completed –Probe collision detection software requires development Shipping to Durham for AIT mid-March NGS TAS during assembly (LESIA)

5 th February 2010 FP7 Prep WP9000 Progress Meeting 11 Key components: WHT Nasmyth Upgrade Upgraded GHRIL platform work progressing New bench and kinematic mounts installed Repositioned walls installed and derotator flange sealed Air conditioning units to be installed early March Derotator assembly starts after Telescope Simulator delivery (UKATC) Provisional derotator installation date of March –Backup date in May CANARY bench installation within GHRIL (ING)

5 th February 2010 FP7 Prep WP9000 Progress Meeting 12 AIT Progress: Optomechanics WHT Nasmyth Telescope Simulator NGS Pickoffs 3 x NGS WFS NGS FSM Low-order DM Science Verification Truth Sensor Figure Sensor GHRIL Derotator NGS TAS AO Path Focal Plane Calibration Field Lens Fold Mirror Science Relay Acquisition Camera External Turbulence Profiler Green bars show subsystem progress towards final CANARY configuration ~80% complete

5 th February 2010 FP7 Prep WP9000 Progress Meeting 13 Instrument Control System

5 th February 2010 FP7 Prep WP9000 Progress Meeting 14 Instrument Control System

5 th February 2010 FP7 Prep WP9000 Progress Meeting 15 Instrument Control System

5 th February 2010 FP7 Prep WP9000 Progress Meeting 16 Instrument Control System

5 th February 2010 FP7 Prep WP9000 Progress Meeting 17 Instrument Control System

5 th February 2010 FP7 Prep WP9000 Progress Meeting 18 Instrument Control System

5 th February 2010 FP7 Prep WP9000 Progress Meeting 19 Instrument Control System

5 th February 2010 FP7 Prep WP9000 Progress Meeting 20 RTCS Progress 4 main components

5 th February 2010 FP7 Prep WP9000 Progress Meeting 21 RTCS Progress RECONSTRUCTOR STATUS: Shaktiware has delivered two reconstructor boxes Undergoing final acceptance

5 th February 2010 FP7 Prep WP9000 Progress Meeting 22 RTCS Progress WAVEFRONT PROCESSING UNITS STATUS: WPUs interfaced to cameras WPUs interfaced to RTCS Being used on testbenches

5 th February 2010 FP7 Prep WP9000 Progress Meeting 23 RTCS Progress DEFORMABLE MIRROR CONTROLLER STATUS: DMC interfaced to DM and RTCS Software interfaces being finalised

5 th February 2010 FP7 Prep WP9000 Progress Meeting 24 RTCS Progress CLUSTER AND CONTROL WORKSTATION(S) STATUS: Low-level interfaces defined, tested and working AO operations scripts and GUI under development

5 th February 2010 FP7 Prep WP9000 Progress Meeting 25 ICS/RTCS Progress: Summary RTCS interfaced to subsystems at Paris and Durham Low-level functionality has been implemented and is being tested Scripting interface implemented –Durham/Paris each have a list of scripts to implement and test GUI framework developed –Command set and functionalities identified –GUI running on workstation

5 th February 2010 FP7 Prep WP9000 Progress Meeting 26 Schedule (1 of 2)

5 th February 2010 FP7 Prep WP9000 Progress Meeting 27

5 th February 2010 FP7 Prep WP9000 Progress Meeting 28 Schedule Progress Some delayed subsystems: –RTCS reconstructor box –Telescope simulator –NGS TAS –WPU Delays identified early and have not impacted overall schedule –RTCS/ICS testing continued with hardware in test configurations SESAME bench DM testbench in Durham –Software development continued with dummy systems Awarded an on-sky date 2 months after initial plan month allowance for schedule slip –Still have ~ 2 week buffer for hardware (more for software)

5 th February 2010 FP7 Prep WP9000 Progress Meeting 29 GLOBAL Milestones (And EU funding deliverable due dates) Scheduled Phase A preliminary design, B&C concept design review DONEJun 2008 Phase A final design review DONE → FP7 Prep WP9-D15 Conceptual Design Report T0+12 ISSUED Dec 2008 Jan 2009 Phase A purchase and assembleJun 2009 Phase A AIT prep review (tomographic WFS test bench Paris, closed loop RTC test bench Durham, Simulator UKATC ) → FP7 Prep WP9-D16 Phase A AIT Readiness Review Report T0+24 Sep 2009 Jan 2010 Phase A Full system AIT DurhamJan 2010 Phase A - 3 NGS low order system on sky → FP7 Prep WP9-D16 CANARY Phase A on-sky report Jul and Sep 2010 Jan 2011 Upgrade (Phase B) preliminary design review (+ OPTICON WP2.1 M1) → FP7 OPTICON WP2.1 CANARY UPGRADE D1 Preliminary Design Report T0+18 Dec 2009 June 2010 Upgrade (Phase B) purchase and assembleMay 2010 Upgrade (Phase B) integrate with RTC at DurhamOct 2010 Upgrade (Phase B) AIT DurhamJan 2011 Upgrade (Phase B) final design report inc AIT results (+ OPTICON WP2.1 M2) → FP7 OPTICON WP2.1 CANARY UPGRADE D2 Final Design Report T0+30 Jan 2011 June 2011 Upgrade (Phase B) – 4 LGS & 3 NGS low order system on sky (+ OPTICON WP2.1 M3)May & Sep 2011 Upgrade (Phase B) On-Sky Report (+ OPTICON WP2.1 M4) → FP7 OPTICON WP2.1 CANARY UPGRADE D3 On-sky Report T0+42 Jan 2012 June 2012 Phase C preliminary design reviewDec 2010 Phase C purchase and assembleJun 2011 Phase C woofer tweeter integrate with RTC DurhamOct 2011 Phase C AIT DurhamJan 2012 Phase C final design review inc AIT resultsJan 2012 Phase C - 4 LGS & 3 NGS high order system on skyMay 2012

5 th February 2010 FP7 Prep WP9000 Progress Meeting 30 GLOBAL Milestones (And EU funding deliverable due dates)Scheduled Phase A preliminary design, B&C concept design review DONEJun 2008 Phase A final design review DONE → FP7 Prep WP9-D15 Conceptual Design Report T0+12 ISSUED Dec 2008 Jan 2009 Phase A Purchase and assemble ONGOINGJun 2009 Phase A AIT Prep review: DONE Tomographic WFS test bench - Paris Closed loop RTC test bench - Durham Telescope simulator - UKATC → FP7 Prep WP9-D16 Phase A AIT Readiness Review Report T0+24 ISSUED Sep 2009 Jan 2010 Phase A Full system AIT Durham ONGOINGJan 2010 Phase A - 3 NGS low order system on sky → FP7 Prep WP9-D16 CANARY Phase A on-sky report Jul & Sep 2010 Jan 2011 FP7 Prep Deliverables