Stream Crossings: Effects on Streams at Fort Riley Military Installation Gilbert Malinga 1, James Steichen 1, Stacy Hutchinson 1,Phillip Woodford 2, Tim.

Slides:



Advertisements
Similar presentations
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Stream Geomorphology Leslie A. Morrissey UVM July 25, 2012.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Project Collaboration In 1999, as a result of several years of monitoring of neotropical migratory birds such as the willow flycatcher, Jim Steele from.
River Studies. Outline of Events During your river field work you will be visiting two different sites in the lower course of the river. At each site.
River Systems - Runoff.
Fort Bragg Cantonment Area Background The USGS is working with the U.S. Army at Fort Bragg to develop a Storm Water Pollution Prevention Plan (SWP3). The.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Objectives Describe how surface water can move weathered materials.
Road Decommissioning Monitoring For every 10 miles of road decommissioned, one ¼ mile monitoring segment is established and monitored. Segments are monitored.
Design of Open Channels and Culverts
Channel Repair of Montezuma Creek in Coronado National Memorial following Fire and Flood Damage Stephanie Yard, P.E. & Allen Haden, Aquatic Ecologist Natural.
Examples for Mitigation Category 1 and 2 Streams.
Hydrologic Studies Unit Land and Water Management.
A GIS-Enabled Kinematic Wave Approach for Calculating the Transition between Sheet and Concentrated Flows Stacy L. Hutchinson 1, J.M. Shawn Hutchinson.
Forest Hydrology Issue: Interaction of forests, fish, and climate One of the dominant pathways by which land cover change affects freshwater fish habitat.
Overview: Assessing the Impact of Maneuver Training on Nonpoint Source Pollution and Water Quality (Project #CP-1339) James M. Steichen 1, Phillip L. Barnes.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
Water Cycle - Running Water
Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University BAE 579: Stream Restoration Lesson.
FNR 402 – Forest Watershed Management
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Abstract Background Conclusion Stream Bed Morphology and Discharge Rates of Deckers Creek Data was collected at 5 different points along a 100 meter transect.
Chapter 13 Surface Water.
Habitat Restoration Division Coastal Program Partner For Wildlife Program Schoolyard Habitats Chesapeake Bay Field Office U.S. Fish and Wildlife Service.
Stream Stability and Sediment Transport Environmental Hydrology Lecture 21.
Surface Water Chapter 9.
Methods A predictive method will be developed from NBSS measurements and vegetation/channel properties from the flume data. The predictive method will.
Materials Transport & NSCD Material Classes Velocity to Transport Relationships York NSCD Restoration PSY CCREP.
Step 1: Assess Riparian Resource Function Using PFC §1d. Complete PFC assessment l 17 questions about attributes and processes l Reminder – PFC based on:
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
Basic Hydrology Water Quality: Sediment production and transport.
San Pedro Creek: A Longitudinal Profile Study Andrew Georgeades Anne Jurek Mary Snow.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
National Consultation with TNMC 3 May 2005, Bangkok WUP-FIN Phase II – Bank erosion study.
Sensitivity analysis of hydraulic model to morphological changes and changes in flood inundation extent J.S. Wong 1, J. Freer 1, P.D. Bates 1, & D.A. Sear.
Stream Erosion and Transport
Poplar River Sediment Source Assessment John L. Nieber Bruce N. Wilson Department of Bioproducts and Biosystems Engineering University of Minnesota July.
Detroit District, Hydraulics & Hydrology Office US Army Corps of Engineers River Bank Erosion Siskiwit River, Cornucopia, WI.
Comparison of Benthic Invertebrate Communities Upstream and Downstream of Proposed Culvert Installations in Alabama Amy C. Gill USGS, Alabama Water Science.
Findings Is the City of Oberlin a source or a sink for pollutants? Water quality in Plum Creek as a function of urban land cover Jonathan Cummings, Tami.
A Sediment Budget for Two Reaches of Alameda Creek (1900s through 2006) Paul Bigelow, Sarah Pearce, Lester McKee, and Alicia Gilbreath.
A river system is made up of a main stream and tributaries – Tributary: a stream that flows into a lake or into a larger stream.
7. Bedforms in coarse-grained channels Step-pool units Cluster bedforms Riffle-pool sequences.
Erosion and Transportation
RIVERS THE MIDDLE COURSE.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
River Systems Section 2 Section 2: Stream Erosion Preview Key Ideas Parts of a River System Channel Erosion Development of River Channels Tributary, River.
Chapter 2: The Flow of Freshwater. Draw the water cycle diagram in your daybook and label it in your own words. p.41 in your text.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Riparian Vegetation and Geology in the Jail Branch Watershed in Central Vermont Past and Present Images 1927 Flood 1936 Flood Study Area 23 km Stream
Bridges Reach analysis Fundamental tool for design
Rivers.
Streams Hydrodynamics
The Flow of Freshwater.
Changes in a river from source to mouth
Module # 17 Overview of Geomorphic Channel Design Practice
Anthony Keene Kristin LaForge CIVE 717 Spring 2018
Module # 8 Channel Evolution Implications & Drivers of Instability
Kastanis- Existing Conditions
Longitudinal Profile Survey for Successful Culvert Replacement
Stream Crossing Replacement Policy
In-Stream Structures & Grade Control
Presentation transcript:

Stream Crossings: Effects on Streams at Fort Riley Military Installation Gilbert Malinga 1, James Steichen 1, Stacy Hutchinson 1,Phillip Woodford 2, Tim Keane 3, and Amanda Pollock 4 1 Dept. of Biological and Agricultural Engineering, Kansas State University. 2 Integrated Training Area Management, Fort Riley. 3 Dept. of Landscape Architecture, Kansas State University. 4 Dept. of Architecture, Kansas State University Background Military maneuvers involve effectively moving soldiers and equipment across Fort Riley military installation training areas, and this sometimes involves crossing streams. Prior to 1992, the military randomly selected where they would cross a stream or constructed earthen fords to cross. During or after high-flow events, both the randomly selected sites and earthen fords posed a safety issue for soldiers and equipment (Fig.1 and 2). Furthermore, use of the randomly selected sites and earthen fords caused tremendous degradation to the streams through tearing of stream banks and generation of excessive amounts of sediment, exceeding Total Maximum Daily Load (TMDL) limits for water quality downstream. In 1992, a Low Water Stream Crossing (LWSC) project was initiated at Fort Riley to address problems related to use of earthen fords and randomly selected crossing sites. New designs were developed. Selected stream crossing sites were modified by hardening stream beds and approach roads with rock and gravel (Fig.3). By 2002, the LWSC project was generally considered a success. Project achievements realized were: provided safer training conditions for military, improved access to additional training areas, and alleviated some of the environmental impacts related to crossing streams. Hardened LWSC Design and Construction Design of hardened LWSCs depends on a number of site characteristics, and these include: topography, soil type, area draining into stream crossing and stream channel characteristics. Construction Procedures Cut or fill approaches to LWSC site to a grade not exceeding 12%, minimum width of approach road shall not be less than 5.5m (Fig.4). Stream bed at crossing shall be excavated to a depth of 1.2 m or until a firm surface is reached. Minimum width and length of excavation shall not exceed 6.1 m and stream width plus 3 m respectively (Fig.5). Caution should be exercised not to over-modify stream channel dimensions. Geotextile material shall be laid over excavated bed area and filled with cm diameter rock and compacted until original bed elevation is reached. Layer of geotextile shall be laid on surface of graded approach road, and a layer of 30 cm high of cm rock placed above the geotextile. An additional layer of 30 cm high rock is placed to fill voids in the larger rock and also act as a wearing surface (Fig.6) Drainage ditches constructed on the sides of approach roads shall be graveled with riprap. BMPs shall be employed during construction of LWSCs so as to minimize potential environmental impacts. Current Research Overview Current research is focused at assessing impacts of stream crossings on stream morphology. Objectives: Assess impacts of stream crossings on stream morphology. Make recommendations for design and construction of LWSCs. Based upon lessons learned studying stream crossings, make recommendations for site selection for LWSCs. Methods used include: Stream mapping. Sediment sampling. Road mapping. Delineation of drainage areas serving stream crossings. Stream Mapping. Techniques employed include: 1. Cross section ( Fig. 7) and longitudinal profile surveys (Fig. 8): These surveys are conducted annually and after high flow events. The re- surveys provide a means of monitoring lateral and vertical migration rates of stream channel. Road Mapping and Design Sediment transported from upland areas through approach roads and deposited into streams is a major concern to stream stability. Mapping of slopes, soil types and vegetation on approach roads will be conducted to develop a better understanding of erosion dynamics on approach roads and potential for sediment delivery into streams through stream crossing sites. Delineation of drainage areas Surveys of watershed areas serving the stream crossing sites has been conducted using a blimp (Fig. 10). Future surveys will conducted using Light Detection And Ranging (LIDAR) technology. Digital Elevation Model (DEM) developed from resulting data will give us a picture of the changed size of the watershed areas. Fig.10 Blimp taking aerial photos of watershed areas serving a stream crossing site. Lessons Learned Based upon lessons learned, we have observed that: Design and construction of LWSC is working well, but the major concern is site selection for stream crossings. Fig.11 and 12 show a stream crossing site where a stream is creating a meander cutoff. Questions raised are; was this a good location for a stream crossing and is the crossing the cause of the meander cutoff or is it simply aiding the creation of the meander cutoff. Riffles are best locations for LWSCs, avoid pools, meander bends (Fig.13.) and tributary entry locations on streams. Sediment transported from approach roads is another major concern. Gravelling of roads, at least up to 200 ft on either side of LWSC will reduce amount of sediment detached from the roads. Creation of water bars (built across roads) to divert storm runoff to riparian management zones will reduce amount of sediment from upland areas delivered through approach roads into the streams. Fig.4 Cross Section of Approach Road (drawing courtesy of Sample,1996). Fig.6 Profile of hardened LWSC (drawing courtesy of Sample,1996). Fig.7 Cross section survey across a riffle on Silver Creek. Fig.8 Longitudinal profile (across reach on Three Mile Creek) looking downstream. 2. Bank profile surveys (Fig. 9): Sites have been instrumented with erosion pins, which will be resurveyed annually to estimate and also validate annual erosion rates predicted using Bank Erosion Hazard Index (BEHI) and Near Bank Stress (NBS) methods (Rosgen,2005). 3. Bed material characterization: Wolman pebble count (1954) and bar sample analysis (Rosgen,2005) are conducted annually and after high flow events. Data collected from these tests are essential for understanding sediment transport characteristics of streams. 4. Scour chains: Scour chains have been installed at designated locations along the streams. The chains are resurveyed annually and after high flow events to determine scour or deposition depth and entrainment sizes of bed material. Suspended Sediment Sampling Sampling of suspended sediment at locations along the stream, above and below LWSC is being conducted using ISCO automatic water samplers. Goal of the sampling is to estimate amount of sediment entering the streams at stream crossing sites. Conclusion and Future Work Stream crossings at Fort Riley exhibit a potential of causing stream instability. In order to develop a better understanding of stream dynamics, stream monitoring needs to be conducted on a continuous basis. LWSCs designs and construction procedures work well, but more attention should be paid to LWSC site selection and conditions of approach roads. Some stream crossings work well and others do not. Future work is focused on developing a better understanding of how stream crossings affect stream dynamics. Fig.1 Military tank stuck in an unimproved stream crossing Fig.2 Ruts created by military tank at an unimproved crossing site. (Photo Courtesy of Sample, 1996) Fig.3 Hardened LWSC under construction. Fig.5 Plan view of hardened low water stream crossing (drawing courtesy of Sample,1996). Fig. 11 and 12 stream creating meander cutoff at stream crossing site Fig.13 Stream depositing sediment at stream crossing site After a decade of operation, a need has arisen to re-evaluate performance of LWSCs and their impact on stream stability. Current research is aimed at investigating potential impacts of stream crossings on stream morphology. Fig.9 Site on Wind Creek instrumented with erosion pins.