1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Operations Management
Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
© The McGraw-Hill Companies, Inc., Chapter 16 Operations Scheduling.
Operations Scheduling
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J Operations.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
Operations Scheduling
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
Scheduling Chapter 19.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling. Characteristics of a “job” Constituent operations Constituent operations Due date Due date Time of arrival in shop Time of arrival in shop.
Scheduling Operations Management - 5 th Edition Chapter 16 Roberta Russell & Bernard W. Taylor, III.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Operations Management R. Dan Reid & Nada R. Sanders
Operations Management
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
Scheduling – Day 2. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material.
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
Industrial Systems Engineering Dept. İzmir University of Economics
1. Facility size 2. Equipment procurement Long-term
Copyright 2009, John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Scheduling Operations Management - 5 th Edition Chapter 17.
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling Process and Production Management.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Operations Management Operations Scheduling
Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough - UNH.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
1 Chapter 10 Scheduling 1 Chapter 10 SCHEDULING McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved.
Scheduling for Low-volume Operations
© Wiley 2007 Chapter 15 – Scheduling Operations Management by R. Dan Reid & Nada R. Sanders 3rd Edition © Wiley 2005 PowerPoint Presentation by R.B. Clough.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling Seminar exercises Process and Production Management.
Scheduling. Scheduling of Operations A planning tool for the short term  Provides an opportunity to make use of new information as we approach real time.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Production Activity Control
Infinite loading A scheduling approach that ignores capacity constraints. Click here for Hint finite loading or infinite loading or priority rule?
Scheduling Operations
CHAPTER 8 Operations Scheduling
assemble-to-order (ATO) A system that produces standard modules to be
Chap 11 Learning Objectives
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Scheduling Seminar exercises
Operations Management
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor

2 Learning Objectives Explain the different kinds of scheduling Describe different shop loading methods Describe priority rules Describe scheduling performance measures

3 Definitions Routing: The operations to be performed, their sequence, the work centers visited, & the time standards Bottleneck: A resource whose capacity is less than the demand placed on it Due date: When the job is supposed to be finished Slack: The time that a job can be delayed & still finish by its due date Queue: A waiting line

4 High Volume Operations High volume flow operations generally have fixed routings Bottlenecks are easily identified Commonly use line-balancing to design the process around the required tasks Examples?

5 Low Volume Operations Low volume job shop operations are designed for flexibility. Each product or service may have its own routing (scheduling is much more difficult) Bottlenecks move around depending upon the products being produced at any given time Examples?

6 Gantt Charts Graphical tools used to illustrate workloads & help monitor job progress Load charts: Illustrates the workload relative to the capacity of a resource Progress charts: Illustrates the planned schedule compared to actual performance

7 Load Chart

8 Progress Chart

9 Loading Workstations Infinite loading: Ignores capacity constraints, but helps identify bottlenecks in a proposed schedule – enabling proactive management Finite loading: Allows only as much work to be assigned as a station should be able to handle – but doesn’t prepare for inevitable slippage

10 Example Infinite: Schedule in time period needed Finite: Schedule according to capacity limits

11 Forward Vs. Backward Scheduling Start processing when order is received regardless of due date Schedule the job’s last activity so it is finished right before the due date

12 Operations Sequencing A short-term plan of actual jobs based on available capacity & priorities Priority rules: Decision rules to allocate the relative priority of jobs at a work center Local priority rules: determines priority based only on jobs at that workstation Global priority rules: also considers the remaining workstations a job must pass through

13 Common Priority Rules First come, first served (FCFS) Last come, first served (LCFS) Earliest job due date (EDD) Shortest processing time (SPT) Longest processing time (LPT) Min Critical ratio: (CR) (Time until due date)/(processing time remaining)

14 How to use priority rules Decide which rule to use. List all the jobs waiting to be processed at the work-center and their job time Job time includes setup and processing time Using your priority rule, determine which job has the highest priority and should be worked on 1 st, 2 nd, 3 rd,etc.

15 Machine Shop with 6 jobs waiting Use SPT (shortest processing time) Determine sequence of jobs Job NumberJob Time (setup & run) A3 days B7 days C6 days D4 days E2 day F5 days

16 Performance Measurement Job flow time: Time a job is completed minus the time the job was first available for processing Average jobs in system: Measures amount of work-in-progress =Total job flow time/Make-span Make-span: The entire time it takes to finish a batch of jobs Job lateness: Whether the job is completed ahead of, on, or behind schedule Job tardiness: How long after the due date a job was completed

17 More Data on the jobs Job Number Job Time (setup & run) Due Date (days from now) Remaining job time at other WC Critical Ratio A3 days15615/(3+6) B7 days208 C6 days305 D4 days203 E2 day227 F5 days205

18 Completion Data Job Number Compet- ion Date Due Date (days from now) Lateness (days) Tardiness (days) A B C D E F Negative lateness means job is finished ahead of due date. 0=on time

19 Group In-Class Activity Each team should use each of these rules calculate all performance measures: Critical Ratio Longest Process Time EDD

20 Worksheet for your method:____________ Job #Job Time (setup & run) Due Date -days from now Remaining job time at other WC Job FlowJob Lateness Job Tardiness CR A3 days156 B7 days208 C6 days305 D4 days203 E2 day227 F5 days205 AVE Make-span____________ Job flow-time____________ Average jobs in system____________

21 What are the company’s objectives? What priority rule works best? Fairness? Minimizing mean job tardiness? Minimizing mean job flow time, lateness, and average jobs in the system?

22 Sequencing through 2 work centers Johnson’s rule All jobs are processed through 2 work centers sequentially 1.List the jobs and processing times 2.Find the shortest activity processing time among all jobs (not yet schedule). If it is the first activity, put job needing that activity in the earliest available position in the sequence If it is the second activity, put the job needing that activity in the last avaiable position in the job sequence. One you schedule a job, it’s eliminated from further consideration 3. Repeat step 2 until every job is on the schedule

23 Sample Problem Metal JobActivity 1 Metal Cutting Activity 2 Deburr & Grind A12 B35 C24 D54 E42

24 Sample Problem (days) Metal Job Activity 1 Metal Cutting Activity 2 Deburr & Grind A1 (first) 2 B3 (fourth) 5 C2 (second) 4 D54 (fifth) E42 (third) Act1Act1 ACCBBBDDDDDEEEE Act2Act2 AACCCCBBBBBDDDDEE Ties: pick either

25 Group In-Class Problem HallActivity 1 Mopping Activity 2 Buffing A43 B27 C65 D45 E34 F51