Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.

Slides:



Advertisements
Similar presentations
Cavity BPM for Spectromety: progress and plans A. Lyapin.
Advertisements

Progress of the sub-harmonic bunching system (i.e. upgrading progress of BEPCII present bunching system) Pei Shilun for the SHBS team Accelerator center,
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
S. Smith LCLS Facility Advisory April 16, BPMs and Toroids Facility Advisory Committee April 16, 2007 System overview.
LCLS Control Group LCLS-Week Oct , 2005 BPM Signal Processing T. Straumann, M. Cecere, E. Medvedko, P. Krejcik SLAC.
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
Bob Lill LCLS week January 22-24, 2008 LCLS Cavity BPM Production Status.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Bob Lill FAC meeting Cavity October 30, 2007 LCLS Cavity BPM Status and Testing.
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
New Electron Beam Test Facility EBTF at Daresbury Laboratory B.L. Militsyn on behalf of the ASTeC team Accelerator Science and Technology Centre Science.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
The Cavity Beam Position Monitor (BPM) Massimo Dal Forno Paolo Craievich, Raffaele De Monte, Thomas Borden, Andrea Borga, Mauro Predonzani, Mario Ferianis,
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
High resolution cavity BPMs in the context of the European XFEL
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
Beam Test status and Plans of the ILC Main LINAC BPM
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
Development of a High Resolution Cavity BPM for the CLIC Main Beam
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
X-band Based FEL proposal
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Communication 40 GHz Anurag Nigam.
Re-entrant BPM R&D for ILC Main Linac
CLIC Workshop 2016: Main Beam Cavity BPM
12.4: SRF HOM Diagnostics: Experimental Results and Future Plans
Controls CBETA controls will extend existing EPICS control system
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
Low Level RF Status Outline LLRF controls system overview
Advanced Research Electron Accelerator Laboratory
Low Level RF Status Outline LLRF controls system overview
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Undulator System Components Status Dean Walters
High Level Physics Applications for LCLS Commissioning
Undulator Cavity BPM System Status
Undulator Cavity BPM Status
Overview of RF Gun Specifications and Technical Issues
Breakout Session SC3 – Undulator
Beam Position & Charge Monitors LCLS Lehman Review July 11, 2007
Presentation transcript:

Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status

Bob Lill Undulator Cavity BPM System April 16, 2007 Design Review Outline BPM System Design Overview Cavity Design Electronics and ADC Current status for phase II testing First article and production

Bob Lill Undulator Cavity BPM System April 16, 2007 LTU and Undulator BPM System Specification ParameterSpecification Limit Condition Resolution < 1  m 0.2 – 1.0 nC +/- 1 mm range Offset Stability < +/- 1  m 1 hour +/- 1 mm range / Celsius Offset Stability < +/- 3  m 24 hours +/- 1 mm range / Celsius Gain Error< +/- 10 %+/- 1 mm range / Celsius Dynamic Range, Position+/- 1 mm10 mm diameter vacuum chamber Dynamic Range, Intensity> 14 dBPC Gun 0.2 – 1.0 nC

Bob Lill Undulator Cavity BPM System April 16, 2007 In-Tunnel Receiver Block Diagram

Bob Lill Undulator Cavity BPM System April 16, 2007 Design Development Cold Test Unit ITS Test Unit First Article Design

Bob Lill Undulator Cavity BPM System April 16, 2007 X-Band Cavity BPM Design Each BPM has position cavity and reference cavity SLAC selective coupling design utilized to reduce monopole mode Iris couplers are precisely EDM into Solid Copper Body Waveguide transition brazed to body

Bob Lill Undulator Cavity BPM System April 16, 2007 Tuning Pins Feature Added Tuning pins prototyped and tested in lab Tuning pin simulations verify lab measurements Tuning pins will improve performance and production yield Tuning Pins

Bob Lill Undulator Cavity BPM System April 16, 2007 Prototype BPMs for 3-BPM test

Bob Lill Undulator Cavity BPM System April 16, 2007 Polished and re-surfaced All 4 bodies need rework Argonne surface laboratory provided polishing and measurements of critical surfaces (0.1 micron rms) 1 st unit brazed Altair Inc.

Bob Lill Undulator Cavity BPM System April 16, 2007 Preliminary Cold Test Test fixtures designed and built for preliminary tuning before brazing Critical tuning experience gained Encouraging cold test results after rework/tuning

Bob Lill Undulator Cavity BPM System April 16, 2007 Cold Test Before Brazing ( GHz Goal) Serial #R/ Position Cavity Freq. GHz) Reference Cavity Freq. GHz)

Bob Lill Undulator Cavity BPM System April 16, 2007 X-Band Receiver Development

Bob Lill Undulator Cavity BPM System April 16, 2007 X-Band Receiver Packaging Design Receiver enclosure 12.5 wide by 15 deep by 2.5 thick (inches) with integral heat sink Houses input filters local oscillator and down- converter 3-WR75 Inputs, 3-type “N” outputs, LO ref. input Type “N”, power and control cable

Bob Lill Undulator Cavity BPM System April 16, 2007 X-Band Receiver Chassis 4 receivers chassis built and tested High/Low gain feature (28/0dB) to extend dynamic range Integrated self-test Multi-mode operation with phase locked LO

Bob Lill Undulator Cavity BPM System April 16, 2007 X-Band Receiver Chassis Line Replaceable Unit (LRU) design Local status interface indicators for power, operational mode, gain range, self-test Integral EMI chassis design

Bob Lill Undulator Cavity BPM System April 16, 2007 Receiver Test Fixture Development Test fixture developed for bench testing Multi-mode operation with phase locked local oscillator or free-run test capabilities Test fixture inspected before operated

Bob Lill Undulator Cavity BPM System April 16, 2007 Prototype Receiver Specification ParameterSpecification Limit Condition RF Frequency GHz20.0 +/ Celsius Dx, Dy, Intensity Input Peak Power50 watts peakNo damage (limiter protection) LO Frequency GHz (2856 MHz*4) / Celsius 1nC, 1mm offset, 200fs BL LO Power Range+10 dBm Max.Provide LO for 3 down converters IF Frequency50 MHz Min / Celsius Noise Figure Dx and DY2.7 dB Max / Celsius Noise Figure Intensity (reference)4.0 dB Max / Celsius LO to RF Isolation40 dB Min / Celsius LO to IF Isolation45 dB Min / Celsius Output Power+14 dBm1 dB compression Conversion Gain25 dB typical20.0 +/ Celsius

Bob Lill Undulator Cavity BPM System April 16, 2007 Dynamic Range Testing

Bob Lill Undulator Cavity BPM System April 16, 2007 System Response Frequency Sweep

Bob Lill Undulator Cavity BPM System April 16, 2007 BPM System Test Approach Phase I Injector Test Stand ITS Install single X-Band Cavity and modified off- the-shelf down converter receiver Mount BPM on two-axis translation stage Phase II LEUTL test with PC gun Install three X-Band Cavities BPMs Mount all 3 BPMs together on a two-axis translation stage

Bob Lill Undulator Cavity BPM System April 16, 2007 Injector Test Stand (ITS) Beam Parameters Charge- 1 nC single- bunch Bunch length- ~ ps FWHM for ps laser Spot size on final screen at 5.5 MeV ~ 0.75 mm rms, ps laser

Bob Lill Undulator Cavity BPM System April 16, 2007 (Phase I) ITS BPM Test Results BPM setup on X/Y translation stage Aligned BPM Pitch and Yaw to < 25  m Initial beam spot size 2-3 mm rms at low charge (0.05 nC) at faraday cup before adding new focusing magnets to reduce to 200 um rms Beam stability limited to 50  m rms. Laser improvements ongoing

Bob Lill Undulator Cavity BPM System April 16, 2007 Prototype Cold Test (Dipole cavity 500 micron offset) Parameter (500 µm offset) PredictedMeasured Prototype # 1 bolted end caps Measured Prototype # 2 brazed end caps Frequency TM GHz8.271 GHz8.243 GHz Coupling TM dB-69 dB-62 dB Frequency TM GHz GHz GHz Coupling TM dB-28 dB-24 dB Q (loaded) TM X/Y Isolation TM dB-33 dB-23 dB Dipole to Monopole cavity Isolation <-80 dB<-85 dB<-89 dB Frequency TM GHz GHz GHz Coupling TM dB-64 dB-50 dB

Bob Lill Undulator Cavity BPM System April 16, 2007 ITS Data Processing Development Cavity BPM and electronics tested using ITS beam line First raw cavity voltage outputs captured on scope 6/9/06 Mover system calibration Ref. Hor. Vert.

Bob Lill Undulator Cavity BPM System April 16, 2007 Waveforms acquired with sampling scope and processed via Epics

Bob Lill Undulator Cavity BPM System April 16, 2007 Phase II Testing Objectives 3 BPM Test Test three BPM separated by fixed distance to determine single-shot Evaluate First Article Prototypes Complete test matrix to prove compliance to specification

Bob Lill Undulator Cavity BPM System April 16, 2007 In-Tunnel Progress 2-axis translation stage installed and tested Stages provide sub- micron controllable horizontal and vertical motion Multiple experiments planned to verify operation

Bob Lill Undulator Cavity BPM System April 16, 2007 LEUTL 3 BPM Test Readiness Mid-May Testing Scheduled PC gun beam 325 MeV to dump 33 Hor. and 23 Vert. micron normalized emittance Compressed beam less than 1 ps

Bob Lill Undulator Cavity BPM System April 16, 2007 SLAC ADC Development The PAD (Phase and Amplitude Detector) being considered for Cavity BPM ADC Linear Technologies LTC bit digitizer chip specified to run up to 130MHz

Bob Lill Undulator Cavity BPM System April 16, 2007 Stability Testing

Bob Lill Undulator Cavity BPM System April 16, 2007 PAD Dynamic Range

Bob Lill Undulator Cavity BPM System April 16, 2007 System Layout and Planning X-band receiver LRU Beam

Bob Lill Undulator Cavity BPM System April 16, 2007 BPM SUT Hardware Cavity BPM mounted for SUT testing Receiver mounting hardware prototyped

Bob Lill Undulator Cavity BPM System April 16, 2007 Production Schedule

Bob Lill Undulator Cavity BPM System April 16, 2007 Production Phase Production of 2 BPMs for LTU 07/07 Production of 6 BPMs for undulator 07/07 Production of 10 BPMs for undulator 09/07 Production of 11 BPMs for undulator 11/07 Production of 7 BPMs for undulator 01/08 Spares 4 BPMs 01/08

Bob Lill Undulator Cavity BPM System April 16, 2007 Summary X-Band Cavity BPM Development Ongoing 4 Cavity BPM machined 1 st unit waiting brazed 3 other units are being brazed 3-BPM test planned for mid-May Receiver Prototype Development 3-BPM test prototype design incorporates high/low gain, self-test and final packaging First 4 Prototypes assembled with good results Data Acquisition and Test Collaborating with SLAC to use the same ADC as SLAC LINAC BPM upgrade Testing is on going at this time with promising results