W. KozaneckiMCC AP meetiing, 20 May 04 Serendipitous measurement of beam-beam tune shift in the LER  Principle  measure colliding tunes (tune tracker.

Slides:



Advertisements
Similar presentations
W. KozaneckiMDI meeting, 5 May 06 Slide 1 Online DCH background analysis  Compare on-line DCH background ratio to Martin's offline analysis  Can we identify.
Advertisements

2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
W. KozaneckiMCC AP meeting, 8 Mar 07  MD goals  Experimental procedure  HER-only x & y scans + high-current extrapolation  [LER only X & y scans +
W. KozaneckiPEP-II MAC meeting, Dec 04Slide 1 Run-4 Beam-beam Performance Summary  Time evolution of beam currents, spot sizes, tunes & luminosity.
1 Beam-Beam Collimation Study Stephanie Majewski, Witold Kozanecki June 4, 2004 Acknowledgments: Ted Fieguth, Roger Barlow.
W. KozaneckiMD planning meeting, 20 Jan 04 Background characterization strategy  MD goals  Background sources  Operational procedures  Open questions.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
W. KozaneckiMDI meeting, 19 Mar 04 Separating the luminosity background from the non-colliding beam-gas contribution  Principle  the problem  the beam-gas.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
3/31/2005 KEK, Japan 1 G4Beamline for KEK test K. Yonehara Illinois Institute of Tech.
W. KozaneckiPEP-II MAC Review, 9-11 Oct 03 Beam-beam: Experimental Status  Introduction: PEP-II collision parameters & recent performance  Interplay.
MCC meeting, 2 May 03W. Kozanecki Current-dependence of PEP-II beam sizes Current-dependence of PEP-II beam sizes as measured on 30 Apr 03, after moving.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
PEPII MAC Meeting, 14 Dec 04 Luminous Region Measurements with BaBar  Real-time Measurements  x,y,z centroids, RMS widths, x-z tilt  Offline Measurements.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
W. KozaneckiMDI meeting, 9 Mar 07  MD goals  Experimental procedure  HER-only x & y scans + high-current extrapolation  [LER only X & y scans] + high-current.
IR vacuum M. Sullivan PEP-II meeting Feb. 22, 2007.
W. KozaneckiMCC AP meeting, 24 Apr 06 Slide 1 Using the gas-induced beam blowup to measure vertical IP beam sizes  Principle  heat PR02 VP8020.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
W. KozaneckiMCC AP meeting, 29 July 04  Goal: measure the luminosity degradation associated with  parasitic crossings  horizontal crossing angle  Principle.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, N.Kazarinov.
6. betatron coupling sources: skew quadrupoles, solenoid fields concerns: reduction in dynamic (& effective physical) aperture; increase of intrinsic &
MDI meeting, March 19, 2004 Categorizing radiation aborts Livio Piemontese When something really bad happens to the beams, they are aborted. An optimized.
Developing Tune Feedback for PEP-II Alan Fisher SLAC e + e – Factories 2003 October 13–16.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Luminosity expectations for the first years of CLIC operation CTC MJ.
Finnish Custom Lab., Pekka Ravio
LHC progress Report LHCC Wednesday 23 rd March 2011.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Afterglow Studies Eric Torrence University of Oregon 183 nd LMTF Meeting 10 October 2013.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Chromaticity correction (without RCS.A78B2) Thanks to: F. Roncarolo, E.Todesco, M.Lamont, J.Wenninger.
U. Wienands, Y. Cai, F.-J. Decker, M. Donald, W. Kozanecki, Yu. Nosochkov, T. Raubenheimer, J. Safranek, D. Sagan., A. Seryi, K. Sonnad, C. Steier, P.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
9/6/2007 PEP-II LER RF High Current MD Report Dan Van Winkle, Claudio Rivetta, Kirk Bertsche, Themis Mastorides.
Comparing Luminosity Scans and Profile Monitor Results The size of the overlap of the two beams can be calculated from the individual beam sizes using:
Orbits, Optics and Beam Dynamics in PEP-II Yunhai Cai Beam Physics Department SLAC March 6, 2007 ILC damping ring meeting at Frascati, Italy.
Recent MIA Results Yiton T. Yan Stanford Linear Accelerator Center Acknowledgement: Y. Cai, F-J. Decker, S. Ecklund, J. Irwin, J. Seeman, M. Sullivan,
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
Beamspot Longitudinal Profile Analysis Christopher O’Grady, Benoit Viaud March 17, 2006 Input from: Witold Kozanecki, Josh Thompson, Matt Weaver F.-J.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
1 Bunch length measurement with BaBar SVT B. VIAUD B. VIAUD Université de Montréal Université de Montréal.
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Plan for 500 GeV Development Vadim, Mei. Goals 1.Explore polarization transmission to the 500 Gev CM energy. 2. Inspect the luminosity aspects (with 2.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
Target insertion matching and standard cell optics optimization
dependence on QL can not longer be seen
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
MODIS Characterization and Support Team Presented By Truman Wilson
Weekend Summary Squirted N2 at 3027 under various conditions
Boost Angles Measurement Technique Crossing Angle Measurement
XFEL Bunch Compression System Tuning
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Beam spot size measurements
BEPCII Background Issues: Collimators and Masks
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Luminosity performance comparison: 5-6 Jun vs. 23 Dec 03
Super-B Factory in a “4400m” Tunnel
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

W. KozaneckiMCC AP meetiing, 20 May 04 Serendipitous measurement of beam-beam tune shift in the LER  Principle  measure colliding tunes (tune tracker data in CRR plot)  dump HER only (RF abort)  LER tunes move   (no beam-beam)   or  (tune feed-forward senses I HER = 0 + small LER beam loss)  measure single-beam LER tunes and subtract variation in tune multiknobs (from MKB history). This yields  unshifted LER tunes  beam-beam tune shift   x, y (related to, but different from, beam- beam parameter    x, y )  Experimental details: PEP-II e-log, 15 May 04 swing shift  data in PHYSICS3_DATA:[pep2.ip.witold.spr04]lumb_t_1_15May W. Kozanecki

MCC AP meetiing, 20 May 04 Fast history of beam currents & of LER tune knobs LER_NUX.MKB LER / HER coeff = -210E-7 / 0 LER currentHER current LER_NUY.MKB LER / HER coeff = -150E-7 / 150E-7 Note: how well calibrated are the tune knobs?  

W. KozaneckiMCC AP meetiing, 20 May 04 LER tune spectra, in- and out-of-collision In collision (18 May 04) Single beam (27 Feb 04) Well-defined peaks: tune-tracker phase scan unambiguous Where is “the” tune? Could the relationship between phase & peak change significantly ?

W. KozaneckiMCC AP meetiing, 20 May 04 Conclusions: LER tunes, raw & corrected LER x tune, rawLER y tune, raw LER x (corrected)LER y (corrected) x LER only =.504 y LER only =.556  x + =.008  y + =.036 x LER, cldg =.512 y LER, cldg =.592 Caveat Relationship between tracker phase & peak? Caveat How well calibrated are the tune knobs?