SuperDARN Scheduling Working Group Report Tim Yeoman for Gareth Chisham and the Scheduling Working Group SuperDARN Workshop 2011.

Slides:



Advertisements
Similar presentations
EFW Operational Modes RBSP SWG San Antonio September 2014.
Advertisements

Cluster Analysis Measuring latent groups. Cluster Analysis - Discussion Definition Vocabulary Simple Procedure SPSS example ICPSR and hands on.
SuperDARN Workshop, 2011 Upstream Pc3 ULF wave signatures observed near the Earth's cusp Tim Yeoman Darren Wright (Leicester) Mark Engebretson, Fei Lu,
A combination of two similar yet different madness…
SuperDARN Workshop May 30 – June PI Report Mark Lester On behalf of the SuperDARN PIs.
31 May 2011SuperDARN Workshop, 29 May - 3June 2011, Hanover, US 1 Short-period Doppler shift variations in the polar cap: ULF waves or something else?
RHB C-band radar scan strategy constraints Cloud top height less than 1.5 km altitude Features of interest < 5 km in scale Rapid evolution of cells  fast.
Spacecraft working group report SuperDARN workshop 2011 Rob Fear, Jim Wild & the spacecraft working group.
A. McDonald (1), J. Devlin (2). (1) Department of Physics, La Trobe University, Victoria, Australia (2) Department of Electronic Engineering, La Trobe.
By Sophia, Ethan F and Lucas. What does Gamblers Help do? Gamblers Help provides counselling for those who are suffering from problem gambling. Problem.
Mean, Median, and Mode An Introduction to Data Management: Measures of Central Tendencies.
Chapter 6: CPU Scheduling
Current status of A. Matsuoka, Y. Miyoshi, I. Shinohara, T. Takashima, K. Asamura, and ERG project team ERG project ERG project Van Allen Probes SWG 2014/09.
Solar observation modes: Commissioning and operational C. Vocks and G. Mann 1. Spectrometer and imaging modes 2. Commissioning proposals 3. Operational.
SWG Meeting Wrap-up Review of Action Items from RBSP SWG Meeting Nicky Fox & Barry Mauk RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes.
VIENNA DEVELOPMENT METHOD -II. Improving the Incubator System  The software will not only record the current temperature of the system, but will also.
1 H. Laakso, SERENA - HEWG meeting, Mykonos, Greece, 8-11 June Coordinated MMO and MPO observations Harri Laakso ESA/ESTEC, Code SRE-OS, Noordwijk,
Lesson 3-5 Example Example 2 1.Write the prime factorization of each denominator × 22 × ×
School of something FACULTY OF OTHER School of Physics & Astronomy FACULTY OF MATHEMATICS & PHYSICAL SCIENCES The Cornish Survey Workshop.
Paper waste ! Do you have the optimal paper widths ?
Radar composites Elena Saltikoff FMI Ilmatieteen laitos / PowerPoint ohjeistus1.
Research Methods. Measures of Central Tendency You will be familiar with measures of central tendency- averages. Mean Median Mode.
Must be something you can __________________________________. Cannot be an __________________ such as which flowers do you like better, roses or daises?
SuperDARN Collaboration with THEMIS Ray Greenwald, on behalf of the SuperDARN Community JHU/APL THEMIS Workshop December, 2005.
SuperDARN operations Pasha Ponomarenko.
Fractal reconnection at the Earth’s magnetopause and associated ionospheric convection. Gary Abel, Iain Coleman, Mervyn Freeman and Gareth Chisham British.
1. If the amount of water increases, then the height of the plant will increase. This is an example of A hypothesis.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
William Liu Canadian Space Agency June 12, 2007, Uppsala, Sweden CSA Report to the 5 th ILWS Working Group Meeting.
HWT Spring Experiment 2011 model comparisons 1 June OK-MO severe storms Very subtle boundaries, really not a lot of surface forcing But lots of storms.
Implications of Errors in Density Response Time Delay on Satellite Prediction Error Rodney L. Anderson and Christian P. Guignet October 28, 2010, NADIR.
SuperDARN:Looking ahead to RBSP Jim Wild Physics Department, Lancaster University, UK Tim Yeoman & Robert Fear Department of Physics & Astronomy, University.
SuperDARN Observations of ULF Pulsations During a Substorm Expansion Phase Onset N. A. Frissell, J. B. H. Baker, J. M. Ruohoniemi, L. B. N. Clausen, R.
Dario Barberis: Conclusions ATLAS Software Week - 10 December Conclusions Dario Barberis CERN & Genoa University.
Status of SD-RBSP Coordination: November 12, 2012 Contents (13 slides): 1) Background of SuperDARN coordination with the RBSP mission 2) Explanation of.
Sona Software Workshop University of Sussex Department of Psychology.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
The SuperDARN Radar network and the RBSP mission – ULF waves
Track-While-Scan (TWS)
LHC Status Fri Morning 3-June
The Super Dual Auroral Radar Network (SuperDARN)
Department of Electrical and Computer Engineering, Virginia Tech
Solving System of Linear Equations
December 2010 S R G V TM Silicon Valley Research Group Inc.
ESO Phase 1 & 2 Procedures Gaitee Hussain
CEDAR 2013 Workshop International space weather and climate observations along the 120E/60W meridional circle and its surrounding areas Space weather observations.
© T Madas.
Operations update… Kevin Sterne SuperDARN Weekly Group Meeting
An overview by: Thomas Jones December 2, 2002
Radar Modeling Cloud observation, attenuation case 3 radars data fusion Leonid Tolstoy, UMass-UPRM Collaborative Ph.D. Student Sandra Cruz-Pol, Ph.D.
CPU Scheduling Basic Concepts Scheduling Criteria
Chapter 6: CPU Scheduling
Partnerships Unit 8.2.
Notes: Cell Theory.
Benefits of Self Reflection
Activator Complete the table and write the function rule:
Introduction to Cells: How Were Cells Discovered?
مديريت موثر جلسات Running a Meeting that Works
2.3a: Introduction to Cells: How Were Cells Discovered?
Process for Organising Software Development Activities
Simple & Compound Sentences
i-THRIVE: Implementation Checklist Workshop
½ of 6 = 3.
Rule #5 Combining Sentences.
Similarities Differences
Workshop: Exploring the implications of current and future trends
Workshop: Collaborative Innovation
First Hint Chemical usage form, Sat 14th Logbook Comment.
Presentation transcript:

SuperDARN Scheduling Working Group Report Tim Yeoman for Gareth Chisham and the Scheduling Working Group SuperDARN Workshop 2011

Scheduling has once again run smoothly over the last year with very few scheduling conflicts The only conflicts at present are between the scheduling of THEMIS Common Time and Discretionary Time (with THEMIS Time generally having priority) SuperDARN Scheduling in the Last Year

SuperDARN Time Usage 2010/ Discretionary Time Common Time (1-min) Common Time (THEMIS)

01/0207/08 02/03 03/04 04/05 05/06 06/07 SuperDARN Time Usage Yearly Variation Common Time (2-min) Common Time (1-min) Discretionary Time Special Time Common Time (THEMIS) 08/09 09/10 10/11 Year

Issues for Consideration/Discussion (1) Should THEMIS Common Time continue as it is at present? Should THEMIS Common Time still be scheduled with the highest priority? How much THEMIS Common Mode data has been used in combination with spacecraft observations? (How many papers?) Given that it is not exclusively all THEMIS-related time, should it be renamed Spacecraft Common Time or something similar? Is the present mode (2-min scan with single camping beam – 100 range gates) still the best mode for coordinated analysis?

SuperDARN scheduling challenges for 2012: Radar support for RBSP Radar conjunctions with RBSP can be scheduled as for THEMIS/Cluster Storm times are of prime interest. How do we organise a scheduling system which can respond to storm alerts/forecasts

SuperDARN scheduling challenges for 2012: Radar support for RBSP What radar modes should be run for: Network-wide support during storm times Apogee conjunctions with individual radars