Javier A. Sevilla April 5, 2005 1 Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria,

Slides:



Advertisements
Similar presentations
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
David Saenz FAC CF April 20, 06 Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities D. Saenz.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
David Saenz FAC CF April 07, 2005 Conventional Facilities Overview SLAC Site Plan Systems Description Construction Schedule.
Javier A. Sevilla Interface & Configuration FAC Review April 16, Interface and Configuration Management Outline CF.
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
Richard Hislop FAC April 20-21, 2006 CONSTRUCTION SAFETY Richard Hislop LCLS Construction Safety Coordinator.
Javier A. Sevilla MMF FAC Review October 27, Magnetic Measuring Facility (MMF) Outline Summary of Facility Requirements.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
David Saenz FAC CF Oct 12-13, 2004 Conventional Facilities Overview SLAC Site Plan Systems Description Construction Schedule.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
David Saenz CF Oct 30, CF MEP Commissioning.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
Jo Beth Folger FAC - CF Breakout – Sector April 8, Sector 20 Project Overview Sector 20 Site Plan Description Schedule.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
Mike Scharfenstein FAC Review - November 11, 2008 SLAC National Accelerator Laboratory 1 Environment Safety & Health Status.
Richard Hislop FAC October Construction Safety Richard Hislop.
M. Scharfenstein - ES&H Coordinator 8 June 2009
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
Javier A. Sevilla Interface & Configuration FAC Review October 12, Interface and Configuration Management Outline.
Industrial Risk Control
David Saenz FAC Review CF Design, Cost and Schedule Oct 27, 2005 CF Overview & Status Design Status CMGC Status Latest.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
David Saenz EIR Review Oct 9-11, Conventional Facilities (CF) WBS 1.9 ETC and Methodology David Saenz CF Systems Manager.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
LCLS-II ES&H Requirements: Subcontractors
CF Organization & Schedule
Meeting of the LCLS Facilities Advisory Committee
Sector 20 Project Overview
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall Hutches Civil Construction
Conventional & Experimental Facilities Dept.
CONVENTIONAL FACILITIES STATUS
M. Scharfenstein - ES&H Coordinator 14 May 2009
Ian Evans SSRL Safety Office
Conventional Facilities (WBS 1
Details supporting the increase
Far Experimental Hall - Hutches
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
Conventional Facilities WBS 1.9
Integrated Safety and Environmental Management
CONVENTIONAL FACILITIES
Richard Hislop Construction Safety Coordinator
DOE Review of the LCLS Project October 2006
LCLS MMF Facility Status
Department Of Energy Review Linac Coherent Light Source Project
Phase 1 Statement of Work Preconstruction “Plan The Work”
Javier A. Sevilla Conventional Facilities
CF Scope, Management & Organization
CMGC Overview SLAC Site Plan Systems Description Construction Schedule
Presentation transcript:

Javier A. Sevilla April 5, Magnetic Measuring Facility (MMF) Outline Organizational Chart Facility Design Criteria, User’s Requirements and Layout Previous Work Status to Date (Site preparation, Title II and Title III) Budget and Schedule Technical Challenges (Risks) ES&H Issues Management Challenges Path Forward

Javier A. Sevilla April 5, Organizational Chart Magnetic Measurement Facility (MMF) Robert Ruland – Alignment Mgr Zachary Wolf – User Conventional Facilities-WBS 1.09 David Saenz – Conventional Facilities Manager Jim Welch – CF Systems Physicist Javier A. Sevilla-CF Project Engineer/CAM Jo Beth Folger-CF Engineer Richard Hislop – Construction Safety Manager Anita Malahowski –Cost/Schedule Bruce Patten – Contracts/Procurement Jesse Saldivar – CF Technical Assistance Conventional Facilities Project Office Facility Requirements- Scope Cost/ Schedule SAFETY

Javier A. Sevilla April 5, Facility Design Requirements Technical Note LCLS-TN-041-Z Space Requirements Environmental Stability (3 areas) Space Temperature: ± 0.1 °C short term may go up to 0.3°C if < 1Hr Relative Humidity: 45%± 5% Other areas: ±1°C and ±2.5°C Vibration <0.5 microns-MM Lab Utility Requirements Electrical (new 800A feeder MMF  Bldg Upgrade) Other (compressed air and small chiller for User’s equipment)

Javier A. Sevilla April 5, MMF Facility Uses Undulator magnet tuning – 2 magnet measuring machine test stands Aligned with same orientation to Earth’s magnetic field as LCLS Undulator Hall. Undulator fiducialization – large coordinate measuring machine Cradle assembly area Magnet storage/temperature acclimation Work desks in lab and office space for 2 employees

Javier A. Sevilla April 5, Resultant Building Criteria ~4,800 sq. ft. floor space (inc. ~3,000 laboratory space, mech Rm) + mezzanine 1,400 sf (HVAC & Electrical) Locate within an existing building to aid in temperature control Adequate ceiling height for overhead cranes Accessible for magnet delivery using trucks and forklifts Electrical service – 800A, 480v, 3 Ø

Javier A. Sevilla April 5, Building 081 Location LCLS Undulator Hall Research Yard PEP Ring RoadNORTH LINAC

Javier A. Sevilla April 5, Building 081 Site Layout Front Rear Haz Mat

Javier A. Sevilla April 5, Building 081 Current Uses ~25 Ft height

Javier A. Sevilla April 5, New Space Allocation for Bldg. 081 SHIPPING & RECEIVING EQUIPMENT REPAIR VEHICLE SHOP Offices (N) MCC-B081 Front Rear (N) Fire Alarm Panel

Javier A. Sevilla April 5, MMF Ground Floor Plan Coordinate Measuring Area ~ 1,000 ft. sq. Cradle Assembly Area ~325 ft. sq. Magnet Loading and Storage ~850 ft. sq. ± 2.5°C ± 1°C, 45% RH ±5 Magnet Measuring Lab ~1,800 ft. sq. ± 0.1°C, 45%RH ±5 Rear Mechanical Room ~256 ft. sq.

Javier A. Sevilla April 5, Mezzanine Floor Plan Mezzanine for Mechanical/Electrical Equipment in Conditioned space 4 Air handling Units 1 Motor Control Center, X-trmr, Panels, 1 small Compressor HVAC Control Panel Equipment: Rear MCC

Javier A. Sevilla April 5, Rear Elevation-MMF Roll up door for magnets delivery Mechanical Access Staff Access Mezzanine

Javier A. Sevilla April 5, User’s Layout (By R. Ruland, Oct, 2004) Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) Test stand lay-out is driven by requirement to match the Earth Magnetic Field conditions in lab to Undulator Hall, i.e. azimuth and gap orientation need to be identical

Javier A. Sevilla April 5, Previous Work Title I Drawings and Specifications – completed by JE External Review October 14, 2004 Report with recommendations Internal reviews (SLAC) Facility’s User (Metrology Group) 50% and 100% drawings and Specs: ES&H, Citizen’s Committees Conventional Experimental Facilities Dept (CEF) old SEM

Javier A. Sevilla April 5, Status Title II Drawings and Specifications –prepared by JE Issued for Construction-March 11, 05 In-progress: Review and “Final” approval by SLAC’ Citizens Committees and ES&H- Obtained approval for bidding Site Preparation Work (activities delayed) Resources allocation  Accident related (CEF support) On-going: Design and coordination (new storage carrousel, shelving and Haz Material storage relocation, move occupants new electrical feeder to building, FA system and data network upgrade) Title III Procurement: Select only “qualified” subcontractors based on a “criteria” Develop and implement a “Commissioning” plan Beneficial Occupancy: Feb’06

Javier A. Sevilla April 5, Budget & Schedule Title III Including Site Preparation $2.04M (excludes: fire alarm building upgrade B081 and some relocation costs) Bidding and Award April – June Site visit: April 7, 2005 Bids due May 5 and Award May 27, 2005 Construction and Commissioning Execution: Mid June 05 – February 06 Beneficial Occupancy to Project Office  Feb-06

Javier A. Sevilla April 5, Schedule P3

Javier A. Sevilla April 5, Cost Estimate- WBS Estimated Total Cost $2.04M Construction Subcontract: $ 1,493 K Site Preparation & Electrical LLP: $ 546K Allocated Contingency: 30% construction-not included

Javier A. Sevilla April 5, Risks Internal technical: Not achieving the Temperature and Stability requirements Plan: Design reviews, constructability and commissioning plan Internal non-technical: Delays in the BO date Plan: Use good and effective Project Management approach, and select only “qualified” contractors including subs Internal non-technical: Safety accidents Plan: Pre-qualification of contractors, strict implementation and close monitoring of Safety Plans and Procedures

Javier A. Sevilla April 5, ES&H Issues Demolition activities Site Preparation: Excavation Excavation Permit for Relocation of Haz Mat Storage was obtained Sampling of soil by ES&H Air quality-BAAQMD-not applicable Construction Activity Hazards Construction Safety oversight by LCLS Safety Manager, LCLS Divisional ES&H Coordinator, SLAC Safety OSHA Inspectors and by SLAC trained UTR. Subcontractors will be required to staff project with a Construction Safety Professional Includes preparation of Pre-work Hazard Analysis, Job Hazard Analysis and Mitigation (JHAM) and all applicable DOE and Federal Safety Regulations. Radiation None Hoisting/Rigging Citizens’ Committee and/or Hoisting/Rigging inspector will review and approve the Subcontractor’s Rigging Plan for the testing, commissioning and acceptance of new cranes

Javier A. Sevilla April 5, Management Challenges Cost/Schedule Risks Cost estimate based on Jacobs estimate– confirmation when bids are received from subcontractors (Factors: Market conditions, qualification criteria and NEW Safety Requirements). Schedule Coordination and Support from other SLAC’s Departments (ES&H, Stores, CEF) SLAC policy changes in the wake of 10/11/04 electrical accident are still being developed. (UTR responsibilities, Authority and Oversight may change, etc.)

Javier A. Sevilla April 5, Path Forward Enforce Safety Regulations to All Sub-Contractors Implement Criteria Selection for Bidding and Construction to ALL Sub-Contractors Coordinate and Complete ALL Site Preparation activities Management and Lab support Construction and Commissioning Schedule and Cost Controls Strict compliance with Drawings and Specifications Execute an integrated verification of: operational performance, testing, complete documentation and training of SLAC personnel, which will operate and maintain this Facility.