Cost. Overview In this section we want to translate the production data into cost data. In other words, we will want to understand how the cost of producing.

Slides:



Advertisements
Similar presentations
Learning Objectives Delineate the nature of a firm’s cost – explicit as well as implicit. Outline how cost is likely to vary with output in the short run.
Advertisements

Long Run Demand for Labor
Chapter 7 (7.1 – 7.4) Firm’s costs of production: Accounting costs: actual dollars spent on labor, rental price of bldg, etc. Economic costs: includes.
11 OUTPUT AND COSTS © 2012 Pearson Addison-Wesley.
Chapter 9: Production and Cost in the Long Run McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Chapter 7Copyright ©2010 by South-Western, a division of Cengage Learning. All rights reserved 1 ECON Designed by Amy McGuire, B-books, Ltd. McEachern.
1 Production and Costs in the Long Run. 2 The long run u The long run is the time frame longer or just as long as it takes to alter the plant. u Thus.
1 Long Run Cost Here we study the long run.. 2 Long Run Costs Remember the long run is when all inputs are variable. I think it is useful to think of.
1 Short Run Production Example Here we use an example to illustrate some additional concepts.
10 Output and Costs Notes and teaching tips: 4, 7, 23, 27, 31, and 54.
1 Costs in a Graph The curves we consider here are the ones used the most in our economic analysis.
Chapter 8 Costs © 2006 Thomson Learning/South-Western.
Chapter 6 Production and Cost
1 Perfect Competition in the Short Run. 2 Perfect competition Firms in the real world make either one product or make more than one product. They also.
1 Production and Costs in the Short Run. 2 Overview In this section we want to 1) Think about how production might occur and change as different amounts.
1 Section 2a Production and Costs. 2 Overview In this section we want to 1) Think about how production might occur and change as different amounts of.
1 Production and Costs in the Long Run. 2 The long run u The long run is the time frame longer or just as long as it takes to alter the plant. u Thus.
Production In this section we want to explore ideas about production of output from using inputs. We will do so in both a short run context and in a long.
Long Run Demand for Labor
11 OUTPUT AND COSTS. 11 OUTPUT AND COSTS Notes and teaching tips: 5, 8, 26, 29, 33, and 57. To view a full-screen figure during a class, click the.
10 OUTPUT AND COSTS CHAPTER.
Chapter 8 Cost McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved.
PPA 723: Managerial Economics
1 Costs APEC 3001 Summer 2007 Readings: Chapter 10 & Appendix in Frank.
Module 14 Cost in the Short Run.
Cost and Production J.F.O’Connor. Production Function Relationship governing the transformation of inputs or factors of production into output or product.
Lecture 9: The Cost of Production
Marginal Rate of Technical Substitution: The rate at which one factor can be substituted for another factor while maintaining a constant level of output.
The Costs of Production Chp: 8 Lecture: 15 & 16. Economic Costs  Equal to opportunity costs  Explicit + implicit costs  Explicit costs  Monetary payments.
Chapter 8 © 2006 Thomson Learning/South-Western Costs.
1 Chapter 7 Production Costs Key Concepts Summary Practice Quiz Internet Exercises Internet Exercises ©2002 South-Western College Publishing.
The Costs of Production
9.1 Chapter 9 – Production & Cost in the Short Run  Our focus has been on the fact that firm’s attempt to maximize profits. However, so far we have only.
Production Cost and Cost Firm in the Firm 1 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part,
PPA 723: Managerial Economics Study Guide: Production, Cost, and Supply.
Modelling the producer: Costs and supply decisions Production function Production technology The supply curve.
6 CHAPTER Output and Costs © Pearson Education 2012 After studying this chapter you will be able to:  Distinguish between the short run and the long.
Chapter 7 The Cost of Production. ©2005 Pearson Education, Inc. Chapter 72 Topics to be Discussed Measuring Cost: Which Costs Matter? Cost in the Short.
The Costs of Production Chapter 6. In This Chapter… 6.1. The Production Process 6.2. How Much to Produce? 6.3. The Right Size: Large or Small?
Theory of Production & Cost BEC Managerial Economics.
Chapter 7 The Cost of Production. Chapter 7Slide 2 Topics to be Discussed Measuring Cost: Which Costs Matter? Cost in the Short Run Cost in the Long Run.
Chapter 7 The Cost of Production. Chapter 7Slide 2 Topics to be Discussed Measuring Cost: Which Costs Matter? Cost in the Short Run Cost in the Long Run.
11 OUTPUT AND COSTS © 2012 Pearson Addison-Wesley The Firm and Its Economic Problem A firm is an institution that hires factors of production and organizes.
Chapter 7 Production and Cost in the Firm © 2009 South-Western/Cengage Learning.
1 Module 14 Cost in the Short Run. ObjectivesObjectives  Understand the relationship between the short run production function and short run costs. 2.
Chapter 8 Cost. Types of Cost Firm’s total cost is the expenditure required to produce a given level of output in the most economical way Variable costs.
Chapter 8 Cost McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All Rights Reserved.
© 2010 Pearson Addison-Wesley CHAPTER 1. © 2010 Pearson Addison-Wesley.
1 Chapters 8: Costs of Production. 2 Cost Definitions Total cost (TC) = all costs of production –If r is the cost of capital (rental cost), and w is the.
Output and Costs CHAPTER 10. After studying this chapter you will be able to Distinguish between the short run and the long run Explain the relationship.
TUMAINI UNIVERSITY FACULTY OF BUSINESS ADM Managerial Economics G. Loth.
© 2010 Pearson Education Canada Output and Cost ECON103 Microeconomics Cheryl Fu.
9-1 Learning Objectives  Graph a typical production isoquant and discuss the properties of isoquants  Construct isocost curves  Use optimization theory.
1 Module 14 Cost in the Short Run. Objectives:Objectives:  Understand the relationship between the short run production function and short run costs.
© 2010 Pearson Addison-Wesley. Decision Time Frames The firm makes many decisions to achieve its main objective: profit maximization. Some decisions are.
Chapter 9: Production and Cost in the Long Run
UNIT 6 COSTS AND PRODUCTION: LONG AND SHORT-RUN, TOTAL, FIXED AND VARIABLE COSTS, LAW OF DIMINISHING RETURNS, INCREASING, CONSTANT AND DIMINISHING RETURNS.
Costs.
Chapter 9 Production and Cost in the Long Run
Production.
Production and Cost in the Firm
CHAPTER 6 COST OF PRODUCTION. CHAPTER 6 COST OF PRODUCTION.
MICROECONOMICS: Theory & Applications Chapter 8 The Cost of Production
NİŞANTAŞI ÜNİVERSİTESİ
Chapter 6 The Cost of Production Chapter 6 1.
Production & Cost in the Long Run
Costs.
8 Short-Run Costs and Output Decisions Chapter Outline
CHAPTER 6 COST OF PRODUCTION. CHAPTER 6 COST OF PRODUCTION.
Presentation transcript:

Cost

Overview In this section we want to translate the production data into cost data. In other words, we will want to understand how the cost of producing various units of output might change as different amounts of inputs are used.

Fixed/variable inputs Inputs can be classified as either fixed or variable. A variable input is one that can be changed as the level of output is changed. A fixed input is one that can not be changed as the level of output is changed. We often think of labor as a variable input and capital or land as a fixed input.

Short run/long run The notion of a fixed or variable input is related to the time frame of production. The short run is that period of time when at least one input is fixed in amount. The long run is that period of time in which all inputs are variable. As an example of this consider fast food in Wayne. About any store in town could remodel and increase floor space in about 3 months. So after 3 months we have the long run, all inputs can vary - even floor space. But less than three months is the short run because there is only so much floor space to use.

short run costs In the short run we will consider the fixed and variable costs of production and how they change as more of the variable input is used. Definitions: Total cost (TC) = Total variable cost(TVC) + Total fixed cost (TFC). Marginal cost(MC) = (change in TC)/(change in output). where change in output = 1 when possible. Average cost (AC) = TC/Q. Average variable cost(AVC) = TVC/Q. Average fixed cost(AFC) = TFC/Q. Note that in the short run fixed costs must be paid whether output is zero, 100,000, or any other number of units.

example Let’s take the production example. Say the fixed costs is $1000 per unit of capital and we have two units and the cost of labor is $400 per unit. The next screen shows the example with an added TP or output amount.

QLQMPLAPLTFCTVCTC

QLQMPLAPLTFCTVCTCAFCAVCATCMC

COST Curves

Idealized graph of per unit costs in the short run $/unit Q MC AC AVC Note AVC and AC equal MC when AVC and AC are at their minimum values.

When you look back at the marginal product and average product curves note that the horizontal axis is measuring labor units used and the curves are inverted u-shaped curves. When you look back at the marginal cost and various average cost curves note that the horizontal axis is measuring output units and the curves are u-shaped curves. There is a relationship between these two graphs. When you move to the right by adding labor in the one graph you are moving to the right in the other by having output increased.

How much output should the firm make? How much of the variable labor should be hired? We are not yet ready to answer this question. We are only talking about cost. Will have to talk revenue and profit later before we can answer these questions.

Two production facilities, one type of output. Say you can make output in 1 of 2 facilities. Let’s also say the MC in each (plant a MC) MCa = 12Qa and (plant b MC) MCb = 4Qb. For the firm the first unit of output has MC = 12 in plant a and 4 in plant b. So the first unit should come from plant b. For the firm the second unit could be the first from plant a or the second from plant be. The respective MC’s are 12 and 8. Have it come from plant b. The third unit will also come from plant b. But the 4 th unit for the firm will be the 1 st unit from plant a because of comparing MC’s, 12 in a and 16 in b.

Two production facilities, one type of output. We would keep apply this logic to see which plant the next until of output should come from. A summary of the firm level MC is found by adding the two MC’s in the following way: MCa = 12Qa and MCb = 4Qb. Re-arrange these in Q from like the following (just express each with Q term on the left) Qa = (1/12)MCa and Qb = (1/4)MCb. Q = Qa + Qb = (1/12)MC + (1/4)MC = ((1/12) + (3/12))MC = (1/3)MC. So we have Q = (1/3)MC or MC = 3Q. If you want Q = 32, MC = 96 at the firm level. IN plant a if MC = 96, Qa = (96/12) = 8 and in plant b Qb = (96/4) = 24. Note Qa + Qb = 32.

Isocost lines An isocost line includes all possible combinations of labor and capital that can be purchased for a given total cost. In equation form the total cost is TC = wL + rK, where TC = Total cost, w = the wage rate, L = the amount of labor taken, r = the rental price of capital, and K = the amount of capital taken. This equation can be re-expressed as K = TC/r - (w/r) L.

example As an example say labor is $6 per unit and capital is $10 per unit. Then if we look at a total cost of $100 we see various combinations of inputs: L = 10 and K = 4 or L = 0 and K = 10 or L = and K = 0, amoung others. On the next screen we can view the isocost line in a graph.

graph of isocost line K L This is the isocost line at $100. If we wanted to see higher costs we would shift the line out in a parallel shift and a lower cost we have a shift in.

cost and output K L On this slide I want to concentrate on one level of output, as summarized by the isoquant. Input combination L1, K1 could be used and have cost summarized by 4th highest isocost shown. L2, K2 would be cheaper, and L*, K* K1 K2 K* L1 L2 L* is the lowest cost to produce the given level of output. Here the cheapest cost of the output occurs at a tangency point.

cost and output K L On this slide I want to concentrate on one level of cost, as summarized by the isocost line. Input combination L1, K1 could be used and have this cost but more output would be obtained if L*, K* were used. K1 K* L1 L* Here, the most output for a given cost occurs at a tangency point.

cost and output On the last two screens we have seen the tangency of an isoquant and isocost line shows either 1) the cheapest way to produce a certain level of output, or 2) the most output that can be obtained for a given amount of cost. These two things are different sides of the same coin and profit maximizing firms would be expected to reach the tangency positions. The exception to reaching the tangency would be the short run when the amount of some input can not be changed to reach the tangency. In the long run all inputs can be changed in amount and thus the tangency point could be reached.

short run K L Here the cheapest way to produce the output level as depicted in the isoquant would be to hire L*, K*. But the firm as committed to having K1 units of capital. Thus the cost of this output is indicated by the fourth highest isocost line. K1 K2 K* L1 L2 L* We could follow K1 out and see costs of other levels of output(by putting in more isoquants).

Tangency = equal slopes Our optimal point for the firm in general was slope of isoquant = slope of isocost (or MRTS = w/r) and this gives MPl/MPk = w/r. We can rearrange this to get MPl/w = MPk/r. This last form has an interesting economic interpretation: The extra output from the last dollar spent on labor has to equal the extra output from the last dollar spent on capital. Remember this occurs at the lowest cost level. Example: say MPl = MPk = 4, and w = 4 and r = 2. Note we do not have MPl/w = MPk/r. Since MPl/w = 4/4 = 1/1 taking a dollar away from labor means we lose roughly 1 unit of output. Also since MPk/r = 4/2 = 2/1 = 1/.5 we only have to spend 50 cents on capital to add back the unit of output we lost from having less labor. When the ratio is not equal costs are too high!

Cost concepts in a graph Q unit costs $ MC ATC AVC Q1Q1 MC 1 AVC 1 ATC 1 a b

Interpretation I have picked Q 1 arbitrarily and have drawn a line from this Q up to the highest cost curve. MC 1 is the MC of the this unit. AVC 1 is the AVC of all the units. ATC 1 is the ATC of all the units.

Interpretation continued Since TC = TFC + TVC, ATC = AFC + AVC or AFC = ATC - AVC. So in the diagram, AFC 1 = ATC 1 - AVC 1. Area a = AVC 1 times Q 1 = TVC 1. Area b = (ATC 1 - AVC 1 ) times Q 1 = TFC 1.

Interpretation continued Area a + b =TVC 1 + TFC 1 = TC 1. The concept of diminishing returns is the primary force driving costs in the short run. The rest of the ideas are definitions. The u - shape of the curves are due to the diminishing returns concept.

Long Run The above example assumed we could only have one unit of capital. Now let’s imagine we can have two units of capital. We would have a similar table of numbers and graphs as we did when only one unit of capital was available.

Long Run continued When we switch from one unit of capital to two units, we have the long run because all inputs are then variable. But with the two units we would have short run curves for that level of capital. Now we have two sets of cost curves, one for one unit of capital and one for two units of capital.

Long run continued Thus the graph of the long run is really just a bunch of curves, one for each plant size. I will draw two ATC curves, each with a different amount of capital used.

Long Run Graphs ATC Q ATC 1 ATC 2 Q1Q1

Interpretation If output is going to be less than Q 1 in the long run then only one unit of capital would be wanted because those units would be produced cheapest with one unit of capital. Greater than Q 1 would be produced cheapest with two units of capital.

Interpretation The long run curve is parts of the short run curves. For each range of output the long run curve is the segment of the short run curve that is the lowest, representing the cheapest way to produce that range of output in the long run. The final long run curve is smooth. Let’s see.

Smooth long run curve ATC Q

Reason for long run shape The long run cost curve is said to be u - shaped, just as in the short run, but for a different reason. In the short run we had diminishing returns. In the long run we have economies of scale.

Reason continued The basic idea of economies of scale is that at least for a while when the plant size is increased the average cost curve is pushed down, implying average costs are lowest in a bigger plant. It may be that further increases in plant size push the average cost curve back up. This would technically be called diseconomies of scale.