1/9/09 System Level Design Review January 16, 2009 Aaron Heyman – Lead Adam Cook Jose Rodriguez Abraham Taleb.

Slides:



Advertisements
Similar presentations
RESTAURANT CONTROLLABLE PROFIT
Advertisements

IT Asset Management Status Update 02/15/ Agenda What is Asset Management and What It Is Not Scope of Asset Management Status of Key Efforts Associated.
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
1 Distribution Capacity Analysis P09721 MSD II Final Presentation Distribution Capacity Analysis P09721 MSD II Final Presentation Aaron Heyman – Lead Jose.
PROJECT RISK MANAGEMENT
Chapter 7 Schedule Control
CAPACITY LOAD OUTPUT.
ITIL: Service Transition
1 Lafayette Crisis Center Scheduling System Project # 3 WISE.
Mid-Quarter Design Review April 7, 2009 Aaron Heyman Adam Cook.
Meet the Team Aaron Heyman  5 th Year Industrial Engineer  Team Lead Adam Cook  5 th Year Industrial Engineer Jose Rodriguez  5 th Year Industrial.
Project Management Technique By: Penny Leahy Jackie Holohan.
Fundamentals of Information Systems, Second Edition 1 Information and Decision Support Systems Chapter 6.
Presented By: Katie, Jake, Janet, Marcellous, and Junaid.
Distribution Capacity Analysis P09721 MSD 1 Project Review Aaron Heyman – Lead Jose Rodriguez Adam Cook Abraham Taleb Sponsor: CooperVision.
Validating and Improving Test-Case Effectiveness Author: Yuri Chernak Presenter: Lam, Man Tat.
Meet the Team Abraham Taleb  4 th Year Industrial Engineer Jose Rodriguez  5 th Year Industrial Engineer Aaron Heyman  5 th Year Industrial Engineer.
Iterative development and The Unified process
Mid-term evaluation. Midterm evaluation meeting Purpose of the meeting is to evaluate individuals and their contribution to the team effort Grading pass/fail.
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 7 System Design and Implementation System Design and.
System Implementations American corporations spend about $300 Billion a year on software implementation/upgrade projects.
Introduction to Cost management
User Centered Design Lecture # 5 Gabriel Spitz.
Performing User Interface Design
Operations Planning Horizons
Portfolio Manager ® Learning Objectives In this session, you will learn about EPA’s ENERGY STAR Portfolio Manager tool and how to: –Edit property.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
S/W Project Management
© Mahindra Satyam 2009 Project Metrics QMS Training.
Unit B065 – Coding a solution PREP WORK 1)Make sure you keep a work log / diary. Use the table on page 16 of the hand book as a template 2)Keep a bibliography.
Group 8: Shenanigans Mike Ostrowski Josh Patsey Michelle Boomer Tom Parks Levent Niazi.
Modeling.
Chapter 6 : Software Metrics
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Sponsor: Dr. K.C. Chang Tony Chen Ehsan Esmaeilzadeh Ali Jarvandi Ning Lin Ryan O’Neil Spring 2010.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Executive Summary Target Deployment – January 4, 2005 Actual Deployment – December 22, 2004.
Think. Learn. Succeed. Optimal Investment Strategy Sponsor: Dr. K.C. Chang Tony Chen Ehsan Esmaeilzadeh Ali Jarvandi Ning Lin Ryan O’Neil.
Managing the Information Systems Project © Abdou Illia MIS Spring /26/2015.
Project Charters Module 3
Company LOGO Team assignment 03 Team 04 K15T02. Members… 1.Hoàng Thị Kim Dâng 2.Thái Thanh Nhã 3.Trần Thị Mộng Hà 4.Trần Tiễn Hưng 5.Chu Thị Thu Hương.
Leadership Training Program Labor. Labor Team supports and assists management teams to: Understand and manage their labor budget. Identify labor hours.
The Development of BPR Pertemuan 6 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Search Engine Optimization © HiTech Institute. All rights reserved. Slide 1 What is Solution Assessment & Validation?
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
BSBPMG504A Manage Project Costs 7.2 Determine Budget Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of aggregating.
DHHS COE Meeting Agenda May 19, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
Project Management Basics
Lecture 13.  Failure mode: when team understands requirements but is unable to meet them.  To ensure that you are building the right system Continually.
Tivoli © 2010 IBM Corporation CCMDB New Features for CCMDB August 2010.
Portfolio Manager ® Learning Objectives In this session, you will learn about EPA’s ENERGY STAR Portfolio Manager tool and how to: –Edit property.
DHHS COE Meeting Agenda February 11, 2010 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
BCS Software Developed by M.E.E.M. Mgnt. Inc. BCS: The User Friendly Management Tool Overview Review M.E.E.M. Mgnt. Inc. 2013
Project Management Processes for a Project
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Project Review of P09271 Aaron Heyman Abe Taleb Adam Cook Jose Rodriguez Spring 2009 DISTRIBUTION CAPACITY ANALYSIS AND PROCESS IMPROVEMENTS AT.
Knowledge Based Systems ExpertSystems Difficulties in Expert System Development u Scarce resources – new technology – demand for trained personnel u Development.
The No Wrong Door System Management Tool: Supporting Governance, Performance Measurement, and Reporting 1.
The training simulator Final Conference, Athens, Greece 16 September 2011.
System Administration Usage Reports. Agenda Usage Reports What are they Who can access them How to get them How to analyze the data collected Create basic.
Engineering Quality Software Week02 J.N.Kotuba1 SYST Engineering Quality Software.
Braun Intertec & Dynamics AX
ITIL: Service Transition
Return on Investment of the Recruiting Process
Return on Investment of the Recruiting Process
Aggregate Planning Chapter 13.
Difficulties in Expert System Development
Software testing strategies 2
Engineering Quality Software
Presentation transcript:

1/9/09 System Level Design Review January 16, 2009 Aaron Heyman – Lead Adam Cook Jose Rodriguez Abraham Taleb

Team Expectations for Design Review Learn if Costumer Needs are being met Catch any mistakes in design Receive input on user interface Confirm coherence between all involved parties to create the best end product 1/9/09

Agenda Review Goals of Project Project Status Customer Needs Assumptions, Constraints and Risk Assessment Discussion of User Interface

1/9/09 Goals of Project Be able to answer the following question: o How many labor hours does CooperVision need per pick area given demand in terms of lines for a particular time segment (daily, weekly, monthly, yearly)? Process Improvements will be identified and investigated beginning in March

1/9/09 Project Status Aaron's Screen Shot

Customer Need # ImportanceDescriptionComments/Status CN15The time required to train users is minimal.Not Met CN25The computer tool is user friendly.Not Met CN33 The computer tool is able to be upgraded and/or modified in the future. Not Met CN45The computer tool represents the real world.Not Met CN53The computer tool identifies invalid data inputs.Not Met CN61The computer tool executes commands quickly.Not Met CN73 The computer tool alerts the user when a given demand input is not realizable given actual capacity.Not Met CN83 The computer tool allows the user to visualize all the information on a single screen. Not Met CN93 The computer tool provides the option to print a report of the output. Not Met Customer Needs Importance Scale: 5= Must Have 3= Nice To Have 1= Preferential

Engineering SpecificationsMetrics 1The training time is less than 30 minutes.Training Time 2The computer tool is user friendly.Ease of use 3The computer tool is able to be upgraded and/or modified in the future.Flexibility 4The system represents the real world.Validity Test 5The system identifies invalid data inputs.Ease of use 6The system executes a command in no more than 0.25 minutes.Execution Time 7The system alerts the user when a given demand input is not realizable given actual capacity.Validity Test 8The computer tool allows the user to visualize all the information on a single screen.Validity Test 9The computer tool provides the option to print a report of the output.Validity Test Table 1.1 Relationship of customer needs to metrics Target Specifications Metrics and Specifications Metrics Need Nos.Importance Units Ideal ValueMarginal value 1Training Time15Minutes<30<60 2Ease of use2,55Subjective53 3Flexibility33BinaryYes 4Validity Test4,7,8,91BinaryPass 5Execution Time61Minutes Table 1.2 Target Specifications Importance Scale: 5= Must Have 3= Nice To Have 1= Preferential Binary: Pass or Fail.

1/9/09 Assumptions & Constraints Pick per area distribution is constant Capacity analysis only applies to pick areas not packing/shipping SKUs are always in stock Unable to pull data with out IT assistance No budget to make improvements unless approved Picking system and design constraints

1/9/09 Risk Assessment Risk ItemLevelOwnerStatus and/or Contingency Plans Optimizing part of the system and not the whole. MediumCooperVisionThe team will optimize the pick area to the best of their ability. The entire distribution process is beyond the project scope. Validating the computer tool. HighTeamThe team plans on using historical data to validate the model. Creating an easily modifiable computer tool. MediumTeamThe team will use excel for the computer tool due to its popularity with the customer. Missing data that is needed for calculations. LowTeamThe team has requested all data and has been receiving it in a timely manner from the customer.

1/9/09 User Interface Discussion

Demand Timeframe for which demand is evaluated. Inputs Outputs Output labor hours for each picking area. Output aggregated labor hours required to meet specified demand.

General Information Max. # of employees per area per shift ADM1 Pick to Voice30 Pick to Light24 Carousel4 Note: all data is accurate as of 1/1/09. SeptemberOctober November PickAreaLinesUnitsLinesUnitsLinesUnits ADMPCK12%8%12%7%13%9% CAGEPCK1% 2% 1% CARPCK7%4%7%4%7%5% LISTPCK12%43%12%48%7%39% MEZVRF8%5%8%4%10%5% PTLPCK52%34%51%30%52%34% VRFPCK8%5%9%5%10%6% Hits By Picking Method

1/9/09 Questions & Discussion ?

1/9/09 General Formulations