GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Training March 2005 Jana Thayer Stanford Linear Accelerator Center
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope ISOC Review 15 February 2006 FSW Activities, Organization, and Resource Needs Jana Thayer Stanford Linear Accelerator Center.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT ProjectCCB Review – April 1 st, 2005 GLAST LAT I&T Online A.T.Kavelaars 1 GLAST Large Area Telescope: I&T CCB Review April 1 st, 2005 E-Logbook.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Telecommand and Telemetry Data Dictionary Services Sergio.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 LAT Housekeeping Sergio Maldonado Stanford Linear Accelerator.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT Project Telemetry and Command Handbook Format 1 T&C Handbook Format  Spectrum T&C handbook is in the form of reports output from database contents.
LAT-MD August 2006 LAT Requirement Sell-off Package GLAST Large Area Telescope Gamma-ray Large Area Space Telescope GLAST Large Area Telescope.
LAT ISOCISOC Review, 15 February GLAST Large Area Telescope Instrument Science Operations Center Commanding, Health and Safety Rob Cameron Stanford.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Jeff Fisher, FSW Manager Flight Unit Peer Review Overview/Management/Schedule September 16, 2004.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope:
GLAST Large Area Telescope
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
EPU load – same as SIU load except…
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
GLAST Large Area Telescope Instrument Science Operations Center
Presentation transcript:

GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center (650) Gamma-ray Large Area Space Telescope

28 Jan 2005 Post Acceptance Test Review 2 ISIS Milestones The following items were successfully completed on the date given: Safe Connection Procedure - December 16, 2004 Test Report: LAT-MD Witnesses: Joe Cullinan (QA), Eric Hansen (TD), Jana Thayer (TC) Acceptance Test Procedure – January 21, 2005 Test Report: LAT-MD Witnesses: Kelly Burlingham (QA), Dave Harmon (GSFC), Eric Hansen (TD/TC), Jana Thayer (TD/TC), Tim Morse (Spectrum), and others Post Acceptance Test Review – January 28, 2005 Witnesses: Jeff Fisher, Mike Huffer, Dick Horn, Erik Andrews, Eric Hansen ISIS shipped – January 28, 2005

28 Jan 2005 Post Acceptance Test Review 3 Safe Connection Procedure Successfully completed on December 16, 2004 Report in LATDocs: LAT-MD Objective of test is to verify that –EGSE equipment can be safely mated to all ISIS connectors –All ISIS internal connections are good –Resistors/RTDs used to simulate or measure temperatures have the expected value at room temperature Tests run for each connector: –Electrical Continuity Check, Power and Power Return –Electrical Isolation Check, Power to Power Return –Electrical Isolation, Signal Isolation from Power and Power Return Connectors tested: –Main Power Feed (primary and redundant): JL-1, JL-2 –SIU Power Feed: JL-119 –SIU/Spacecraft Discretes: JL-121 –LGIO: JL-124, JL-125, JL-138, JL-145 –1553 interface: JL-232, JL-233 –Environmental Simulator: JL-123, JL-131, JL-144, JL-152, JL-238, JL-239 –Heater Control: JL-127, JL-129, JL-140, JL-142

28 Jan 2005 Post Acceptance Test Review 4 Safe Connection Procedure Test Personnel –Test Director: Eric Hansen –Test Conductor: Jana Thayer –Quality Assurance: Joe Cullinan ISIS Safe Connection Procedure (LAT-TD-03541) –Annotated and signed copy has been scanned into LATDocs as LAT-TD-03541, Revision 1 –A photocopy travels with the ISIS

28 Jan 2005 Post Acceptance Test Review 5 Acceptance Test Procedure - Objective Successfully completed on January 21, 2005 Report in LATDocs: LAT-MD Objective of test is to –Verify that ISIS is a high-fidelity LAT simulator Test ability of ISIS to manage power to TEMs, EPUs ISIS power demands replicate LAT power demands ISIS monitors internal voltages ISIS simulates temperature sensors using fixed resistors in the range of the device they are simulating (tested as part of Safe Connection Procedure) –Validate the ISIS/Spacecraft interface Reset and discretes LGIO/Science data interface –Verify ISIS/Spacecraft communication over 1553 Exchange of telecommands and telemetry

28 Jan 2005 Post Acceptance Test Review 6 Acceptance Test Procedure - Tests Requirements tested, verification matrix in LAT-TD Test scripts run: –CPU Boot Process and Reset Signal –Set and Read Discretes –Alert Telemetry –Routing of Commands –No-op Commands –Ancillary, Attitude, and Time Tone (Magic 7) Commands –GBM Signals –Automatic Repoint Requests –Power Management –Power Draw –LAT Voltage Monitoring Test Personnel: –Test Director/Conductor: Jana Thayer –Test Conductor/Director: Eric Hansen –Quality Assurance Engineer: Kelly Burlingham –Observers: David Harmon (GSFC), Tim Morse (Spectrum) Summary

28 Jan 2005 Post Acceptance Test Review 7 Acceptance Test Procedure – Supporting Data ISIS Acceptance Test Procedure (LAT-TD-05398) –Annotated and signed copy was scanned into LATDocs under LAT-TD-05398, Revision 1 –A photocopy travels with the ISIS ISIS_ATP CD –Copy of CD travels with ISIS –Contains the data listed: DBX files (ISIS ITOS database) Record of HW, FSW, and ISIS Test Script versions Test scripts (CVS tag ISIS_ATP_04) Test script results (html files) Science Data Archive files Miscellaneous include files (AstroRT specific)

28 Jan 2005 Post Acceptance Test Review 8 Acceptance Test Procedure - Summary Successfully completed on January 21, 2005 Report in LATDocs: LAT-MD Deviations from procedure –Error in output html file for ISIS_Power.pl Voltage of TEM reported instead of voltage of EPU Test was aborted and restarted, skipping hardware configuration Reported in JIRA (ISIS-2) –Minor procedural errors were redlined in document

28 Jan 2005 Post Acceptance Test Review 9 Finishing touches Follow ISIS to Spectrum Astro (tentative 2/21) –Run safe-to-mate and test scripts to validate –Training PowerPoint presentation User’s guide – short, sweet, to-the-point Follow up on –ITOS translation issues –SDIS issues