Status of ongoing studies for comparing 2-mrad and 20-mrad IRs T. Maruyama SLAC.

Slides:



Advertisements
Similar presentations
Background studies Takashi Maruyama SLAC GDE Baseline Assessment Workshop SLAC, January 18-21, 2011.
Advertisements

EXTRACTION BEAM LOSS AT 1 TEV CM WITH TDR PARAMETERS Y. Nosochkov, G. White August 25, 2014.
GUINEA-PIG: A tool for beam-beam effect study C. Rimbault, LAL Orsay Daresbury, April 2006.
1 Vacuum Requirements in the Detector Region from Beam Gas and other Considerations Takashi Maruyama (SLAC) LCWA 2009, Albuquerque October 2, 2009.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Tom Markiewicz/SLAC Snowmass July 2001.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Pair backgrounds for different crossing angles Machine-Detector Interface at the ILC SLAC 6th January 2005 Karsten Büßer.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
NLC - The Next Linear Collider Project Detector Design Issues:  Interaction Region David Asner/LLNL Linear Collider Retreat, Santa Cruz, June 27-29,
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
Background Studies Takashi Maruyama SLAC ALCPG 2004 Winter Workshop January 8, 2004.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Tom Markiewicz/SLAC Snowmass 2001, 05 July 2001 LCD Meeting, 25 September.
LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Background comparison between 20 mrad and 2 mr crossings Takashi Maruyama SLAC Machine-Detector Interface Workshop SLAC January 6-8, 2005.
1 27 Sep 05 Discussion of anti-DID ( “DIDNT” ? ) A.Seryi September 27, 2005.
IR Beamline and Sync Radiation Takashi Maruyama. Collimation No beam loss within 400 m of IP Muon background can be acceptable. No sync radiations directly.
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
August 2005Snowmass Workshop IP Instrumentation Wolfgang Lohmann, DESY Measurement of: Luminosity (precise and fast) Energy Polarisation.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle HH-Zeuthen-LC-Meeting Zeuthen September.
Jan MDI WS SLAC Electron Detection in the Very Forward Region V. Drugakov, W. Lohmann Motivation Talk given by Philip Detection of Electrons and.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle LCWS 2004 Paris April 19 th 2004.
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
Hongbo Zhu, Qinglei Xiu, Xinchou Lou (IHEP) On behalf of the CEPC study group ICFA Advanced Beam Dynamics Workshop: Higgs Factory (HF2014) 9-12 October.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Interaction Region Issues and Beam Delivery R&D Issues & IR Design Status R&D Plans T. Markiewicz Klaisner Review 4/15/1999.
NLC - The Next Linear Collider Project IR Geometries & Constraints on Forward Detectors Tom Markiewicz SLAC ALCPG SLAC 08 January 2004.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
NLC - The Next Linear Collider Project Machine-Detector Interface Tom Markiewicz LC R&D Opportunities, SLAC May 21, 2002.
Interaction Region Issues M. Sullivan for the EIC User Group Meeting Jan. 6-9, 2016.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Tom Markiewicz NLC - The Next Linear Collider Project.
16 February 2009CLIC Physics & Detectors Konrad Elsener 1... some issues regarding the forward region... (“picking up” from Lucie Linssen, 29 Sept 2008)
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
IR-Design 0.44 m Q5 D5 Q4 90 m 10 mrad m 3.67 mrad 60 m m 18.8 m 16.8 m 6.33 mrad 4 m Dipole © D.Trbojevic 30 GeV e GeV p.
1/24 SiD FCAL Takashi Maruyama Tom Markiewicz SLAC TILC’09, Tskuba, Japan, April 2009 Contributors: SLAC M. BreidenbachFNALW. Cooper G. Haller K.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
1 LoI FCAL Takashi Maruyama SLAC SiD Workshop, SLAC, March 2-4, 2009 Contributors: SLAC M. BreidenbachFNALW. Cooper G. Haller K. Krempetz T. MarkiewiczBNLW.
MDI Simulations at SLAC Takashi Maruyama, Lew Keller, Thomas Markiewicz, Uli Wienands, SLAC MAP Collaboration Meeting, FNAL June 21, 2013.
Photon & e+e- Hits in Muon Higgs Factory T. Markiewicz T. Maruyama SLAC MAP Collaboration Meeting. Fermilab 29 May 2014.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
Machine Detector Interface Design Updates
Layout of Detectors for CLIC
Beam Delivery update Andrei Seryi December 12, 2005
The MDI at CEPC Dou Wang, Hongbo Zhu, Huamin Qu, Jianli Wang, Manqi Ruan, Qinglei Xiu, Sha Bai, Shujin Li, Weichao Yao, Yanli Jin, Yin Xu, Yiwei Wang,
Overview of Polarimetry
Neutron and Photon Backscattering from the ILC Beam Dump
ILC Baseline BDS Collimation Depth Calculations
Updates on IR and FF for super-B factory
The 2mrad horizontal crossing angle IR layout for the ILC
Tony Hill Lawrence Livermore National Laboratory
LC Interaction Region Magnet Issues
Hongbo Zhu (IHEP, Beijing) On behalf of the CEPC Study Group
CEPC main ring magnets’ error effect on DA and MDI issues
Sha Bai CEPC AP meeting Local double ring MDI Sha Bai CEPC AP meeting
Hit Density Geant 3 scoring planes
Yasuhiro Sugimoto KEK Feb.4, 2008
Presentation transcript:

Status of ongoing studies for comparing 2-mrad and 20-mrad IRs T. Maruyama SLAC

Beam parameters 500 GeV TESLA TDR –3.4  cm -2 s -1 (6.8  pb -1 / train) –2  e- –2820 bunches per 5 Hz –337 ns bunch spacing Physics rates  (pb)events/train e+e-  qq e+e-  WW

IP Backgrounds:# particles/BX R max > 1 cm, |z|<200 cm e+/e- pairs120K270   hadrons0.8 events*   muons2.3 events* Radiative Bhabha466K 0 Disrupted primary beam Beamstrahlung photons Background Sources Machine Backgrounds: Synchrotron Radiation Muons Production at collimators Direct Beam Loss Beam-Gas Collimator edge scattering Neutron back-shine from Dump * Tim’s updates for COLD

Two Crossing Angle Schemes with SiD Detector 20 mrad2 mrad L* = 3.51 m L* = 4.05 m R =2.5 cm R = 1 cm

Two crossing angle schemes Beam steering Spin precession ~60 mrad ~0.2% depolarization Compensation: Detector integrated dipole (DID) Z-dependent Bx (~800 Gauss max.) Larger background Beam steering in the extraction line. 20 mrad crossing QD0 QF1 Beam extraction through QF1 coil pocket 2 mrad crossing Solenoid compensation is necessary. Extraction line beam diagnostics may not work.

Disrupted beam in 2 mrad crossing 2.1  10 7 Seryi QD0QF1 Particle loss in QF1 3.2% of E<0.65E0 400 Watts

Radiative Bhabhas in 2 mrad QD0QF1 Particle loss: E (GeV)Power (W) QD0 1.6  QF1 2.8 

Sync radiations in 2 mr Sync radiations hit the face of QF1 RED: halo, upstream quads GREEN: halo, QD0 BLUE: disrupted beam, QD0 Disrupted beam with sync photons Beam can be extracted through QF1 coil pocket. QF1 fringe field ~3 kGauss.

Pairs at Z = 315 cm r 2 cm X (cm) 20 mrad w/o compensation 20 mrad w compensation 2 mrad

Pairs 272 e+/e- / BX 1.2 e+/e- /BX VXD Forward tracker Barrel Tracker ECAL R max distribution VXD hits  hadrons 1 evt/BX ~2 VXD hits  muons 2 evt/BX ~2 VXD hits

Tracker Backgrounds Barrel Forward Background in Si Tracker is small: < 5 hits Forward Layer #1 has 21 hits.

To do 20 mrad –Solenoid compensation –Yuri’s new extraction line 2 mrad –Yuri’s new extraction line –Different QF1 design