Brazing Saddles ( Team 15) Client: Parker-Hannifin Faculty Mentor: Dr. Kevin Kochersberger Faculty Coordinator: Dr. Paul Stiebitz Preliminary Design Report.

Slides:



Advertisements
Similar presentations
Personal Mobility Lift Capstone Team Members: Jim Folgate Bill Beers Ryan Pelton David Zuercher.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Module 5 Milling Machines Dr. Salah Gasim Ahmed MET 103
HOB 2013 Body Mechanics The back you save can be your own.
Honda 450 Installation Manual.
Click on this image to open the full PDF document.
Presented by: Ginnette Clark Terri Hall Robert Ishmael Michael Petry.
Adjustable Bookshelf(ABS) 10/04/2012 Design Review.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Overview The top seal mechanism consists of a foil unwinding and feeding mechanism and a cutting and welding mechanism. It is designed to cut out and weld.
Ladders Skill Drills.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
MSD-I Project Review Modular Motion Tracking Sensors 1.
Process Improvement for Drill Bit Blanks For MN Twist Drill The Three Orienteers Scott Anderson – Project Leader Andy Johnson – Mechanical Engineer Tony.
“Brazing Saddles” ( Team 15) Client: Parker-Hannifin Faculty Mentor: Dr. Kevin Kochersberger Faculty Coordinator: Prof. Paul Stiebitz Critical Design Review.
Gearing Torque Force on pedal = 13 lbf (-13 lbf)(8”) – B(2.5”) =0 B = lbf (-41.6 lbf)(10.5”) + (F)(16.5”)= 0 F = lbf Force Required to Lift.
Mechanisms Paul Ventimiglia WPI Student, Team 190.
Senior Design: Validation of Design December 15, 2008.
Optical Stage Redesign Team 4025 Senior Design II – Spring
Michael Brantley 2, Ryan Ferm 2, Nadia Siddiqui 2, Jason Newton 1, Reginald Scott 1 1 Department of Mechanical Engineering, Florida State University, Tallahassee,
Adaptation of a Van with a Device to Lift a Non-foldable Wheelchair Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web.
Team Bob ME 4182 Capstone Design Michael Galvin Rick Rogers Jennifer Edwards Hayato Shimizu Louay Abdul-Hadi.
Health and Safety Training Standards in Design and Technology
Lifting Hazards and some ideas on how to reduce your risk of lifting injury.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Course of MT- 362 Material Handling Lecture # 8.
Temperature Controller for Infrared Paint Curing September 13, 2001 Dec01-11 Team Members Michael Burman, CprE Jonathan Johnson, EE Matthew McMullen, CprE.
Group #16 Equipment Design: Pultrusion Machine Team Members Benji Parks Brent Langille Kurtis Gillis Mark MacIsaac Matt Swinkels Supervisors Dr. A. Kalamkarov.
12 Ladders Skill Drills. 2 Objectives Perform one-, two-, three- and four-FF carries. Perform one-, two-, three- and four-FF raises. Tie the halyard.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
D-R Compressor Cell RIT Senior Design Team P13458 Systems Design Review.
P13458 RIT Senior Design Team March 22, AM-11AM Dresser- Rand, Painted Post Air Bearing System & Layout.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
ASV Senior Design Project Final Report Fall 2012 Team: Leader: Daniel Becker Treasurer: Andrew Hinojosa Manufacturing: Samantha Palmer Design/Assembly:
Automotive Brake Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
Individual Design Concepts Senior Design: Team Burja __________________________________________________________________________________________________________________________________________________________________________________________________________
P13458: Dresser-Rand Compressor Assembly Line Team Members: Lauren Kraft –Project Manager, Nick Feng – IE Cole Bowden – ME, Shawn Moseley – ME Jordon Boggs.
MSU ROV Team Final Presentation Senior Design 1 April 18, 2013.
Texonics Proposal for Production Line Redesign and Retrofit.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
A-Frame Operation The A-Frame will provide support for odd shaped loads, loads where you are unable to get directly below the load, and for stabilizing.
SHAPER, SLOTTER & PLANER SUBMITTED TO PROF. DEEPAK SHARMA SUBMITTED BY ANKIT SHARMA ME-I (III YEAR)
P13631: Gravity Fed Flow Process Control Teaching Aid An RIT education couples theory in lecture with practical application in lab. In the past, carts.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
Planer Machines. Introduction A planer is a type of metalworking machine tool that is some what similar to a shaper, but larger, and with the entire workpiece.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Types of material handling equipment
Turbo Installation Manipulator Final Design Review
Material Transfer Apparatus
Wegmans Swirl Cake Automation
SBN Far Detector Installation & Integration
Shaper Machine ROLL NO : D14ME09 D14ME12 D14ME30.
Kart² Progress Presentation
Valves.
Motion Stage for Optical Coherence Tomography
MOOG EMA Installation MSD1 - P12251
MSD P15280 RIT HOT WHEELZ TEST BENCH
P15661 Reciprocating Friction Tester Base Subsystem
Putting for Perfection
Static Equilibrium.
Warm-up Describe a situation that requires work..
Bunker Wall Design Wall ESS
Detailed Design Presentation
Automotive Technology Principles, Diagnosis, and Service
Beginner Stander Presentation
For more information contact: Mike Newsky,
Presentation transcript:

Brazing Saddles ( Team 15) Client: Parker-Hannifin Faculty Mentor: Dr. Kevin Kochersberger Faculty Coordinator: Dr. Paul Stiebitz Preliminary Design Report February 21 st, 2003 Brazing Saddles ( Team 15) Client: Parker-Hannifin Faculty Mentor: Dr. Kevin Kochersberger Faculty Coordinator: Dr. Paul Stiebitz Preliminary Design Report February 21 st, 2003 Ethan Bagley Melissa Curtin Paul Diedrich Charles Gullo Fulya Tezer Tom Wild

2 Agenda  Problem Statement  Design Phase 1  Design Phase 2  Plan of Action

3 Problem Statement Current braze furnace process:Current braze furnace process: –Operator loads one part every six minutes –Operator must walk 40 feet to opposite end of furnace to retrieve each part –Part removal system currently unreliable

4 Project Goals Design Phase 1: Part removal mechanismDesign Phase 1: Part removal mechanism –Key issues: Part stabilityPart stability System autonomySystem autonomy Design Phase 2: Part Handling SystemDesign Phase 2: Part Handling System –Analysis of Layout in Brazing Area FlexibilityFlexibility

5 Design Phase 1: Development of Mechanical System

6 Concept Development AugerAuger –Rotating coil translates parts from conveyor to staging area Swing ArmSwing Arm –Revolving member pushes parts from the conveyor to the staging area ForkliftForklift –A lifting device raises the parts off the conveyor and a horizontal thruster pushes them to staging area

7 Feasibility Assessment

8 Further Concept Development Original Fork Lift ConceptOriginal Fork Lift Concept –Interlocking perpendicular pairs of forks –First pair raises parts off belt vertically –Second pairs slides into first and reroutes parts towards staging area

9 Concept Development (cont.) Modified Fork Lift ConceptModified Fork Lift Concept –Rotating ramp attached to a small winch –Parts are pushed onto ramp by conveyor –Ramp rotates to stabilize parts

10 Concept Development (cont.) Final Fork Lift ConceptFinal Fork Lift Concept –Parts are pushed onto flat plate by conveyor –Vertical thruster raises part off conveyor –Horizontal thruster (ram) pushes part towards staging area Thrusters are pneumatic actuatorsThrusters are pneumatic actuators Design requires uniform part holdersDesign requires uniform part holders

11 Design Details - Boats New boat designed to carry the existing part holdersNew boat designed to carry the existing part holders -2 pegs in rear for stability -Chamfered front edge to ensure loading onto lift -Holes in base to allow circulation -Vertical pegs to retain parts and provide contact surface -Material is Cordierite -2 pegs in rear for stability -Chamfered front edge to ensure loading onto lift -Holes in base to allow circulation -Vertical pegs to retain parts and provide contact surface -Material is Cordierite

12 Design Details - Mounting The new system will be mounted using the existing bolt holes in the end of the furnace tableThe new system will be mounted using the existing bolt holes in the end of the furnace table

13 Design Details - Electrical Electrical Circuit DiagramElectrical Circuit Diagram –Design integrates sensor and activates the mechanism when parts are present

14 Design Details - Pneumatics Pneumatic circuit diagramPneumatic circuit diagram –Design reuses nearly all components of existing system

15 Design Phase 2: Development of Part Handling System

16 Process Flow

17 Concepts Considered Conveyor Concept Table Concept

18 Concept Chosen Cart Concept

19 Time Savings Assumptions:Assumptions: 100% Utilization100% Utilization Three shifts per dayThree shifts per day 250 working days per year250 working days per year Relative Time Savings:Relative Time Savings: –Conveyor system saves 500 hours per year –Cart system saves 450 hours per year –Table system saves 450 hours per year

20 Bill of Materials & Cost

21 Feasibility Questions T1- Enough area to implementT1- Enough area to implement T2- Material handlingT2- Material handling E1- What is the lifetime of this designE1- What is the lifetime of this design E2- Cost to implementE2- Cost to implement E3- Required maintenanceE3- Required maintenance S1- RIT - Time available to implementS1- RIT - Time available to implement S2- Parker -Time available to implementS2- Parker -Time available to implement P1- Time savingsP1- Time savings P2- Interact well with the surrounding operationsP2- Interact well with the surrounding operations P3- Positive effect on the operator's ability to do workP3- Positive effect on the operator's ability to do work

22 Feasibility Analysis

23 Cart Design Ramp will be installed on top shelf of cart to match ramp on tableRamp will be installed on top shelf of cart to match ramp on table Cart is sufficient length to hold 10 partsCart is sufficient length to hold 10 parts Cart will be held against table with a quick release clampCart will be held against table with a quick release clamp

24 Plan of Action Layout & Flow AnalysisLayout & Flow Analysis Ergonomic & Safety AnalysisErgonomic & Safety Analysis Programming of Basic Stamp systemProgramming of Basic Stamp system Fabrication and Installation of Part Removal MechanismFabrication and Installation of Part Removal Mechanism DOE & Statistical AnalysisDOE & Statistical Analysis

25 Questions?