MICE – the UK Perspective Rob Edgecock RAL/CERN-AB Introduction Introduction UK Contributions UK Contributions Location Location New beamline New beamline.

Slides:



Advertisements
Similar presentations
1 paul drumm; Jan’05; MICE RF Needs MICE RF Power Paul Drumm ISIS Facility Rutherford Appleton Laboratory & MICE.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
International Muon Ionization Cooling Experiment Edward McKigney Imperial College RAL March 25, 2002 Physics Motivation and Cooling Introduction.
09 th April 2003 SINGLE SPLIT DRIVE CHAIN TH116 TH116 or TH526 RS2058 ex SPS AMP 7651 ex RAL SOLID STATE DRIVER LEVEL CONTROL AND SOURCE R.F. LEVEL FEEDBACK.
Progress on the MICE Cooling Channel Solenoid Magnet System
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
TJR 10/30/031 MICE Beam rates Tom Roberts Illinois Institute of Technology 10/30/03.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
MICE AFCSWG Safety Review Summary Mary Anne Cummings Dec. 17, 2003 MICE Video Conference.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
UK Costs Beam & Infrastructure Coils Tracking Detector.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
CMPB Alain Blondel 14 April STATUS OF MICE.
MuCool RF Status MICE Collaboration Meeting June 7-10, 2006, Fermilab A. Moretti June 9, 2006.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
17 March 2005Edda Gschwendtner1 MICE Cooling Channel: Can we predict cooling to ? Edda Gschwendtner Challenge Systematics Cooling Channel Beam Line.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
MUON COLLIDER: R&D Status & Opportunities for Participation FNAL, February 24, 2011   1.Motivation & OverviewSteve Geer 2.Accelerator R&DVladimir.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.
1 pd, PAC 2005 MICE Muon Ionisation Cooling Experiment Paul Drumm Rutherford Appleton Laboratory 19 th May 2005.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Implementation of MICE at RAL Work done in Engineering and ISIS Departments Rutherford Appleton Laboratory Contributors.
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
RAL Muon Beam Line Properties. ISIS 70 MeV H- injection Ring accelerates up to 800 MeV in about 10 ms 50 Hz cycle - Dual Harmonic System ~ 2 x 1.5 MHz;
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
UK Neutrino Factory Conceptual Design
Accelerator R&D for Future Neutrino Projects
Hosting Orsay Walid KAABI
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
SLHC-PP kick-off meeting, CERN 9 April 2008
Presentation transcript:

MICE – the UK Perspective Rob Edgecock RAL/CERN-AB Introduction Introduction UK Contributions UK Contributions Location Location New beamline New beamline New infrastructure New infrastructure Safety and effect on ISIS Safety and effect on ISIS Cost to the UK Cost to the UK Conclusions Conclusions

Introduction MICE is very important for the UK and CCLRC: UK involvement in NF started in 1999 Aim: build a large component or host the machine A lot of progress made: - UK HoC Science and Technology committee “Hosting a global facility like the Neutrino Factory would bring substantial scientific and commercial benefits to the UK. While we acknowledge the uncertainty of international decisions many years ahead, we recommend that the Government or PPARC consider developing a long-term strategy for bringingthis facility to the UK”!- Study III possibly at RAL- NuFact’02 at IC- CCLRC biggest group in Europe

Introduction MICE is very important part of this! Crucial for the Neutrino Factory Increases UK (University) involvement in NF R&D Demonstrates UK capabilities Brings NF-interested physicists & engineers to the UK MICE is unique! Never before have 142 physicists/engineers come to the UK for particle physics MICE is a major opportunity for PP and accel R&D in UK

UK Contributions Beam Infrastructure Cryogenics RF power Focus coil unit Software Experiment contributions: discussed earlier Layout, services, controls Detectors

Location Harwell RAL HEP Test Beam HALL R5.2

Beam Line Created using ISIS: MeV proton RCS - Pulsed at 50Hz - 2 bunches, 100ns long separated by 230ns - 240kW Already produces beam Uses internal Ti target Feeds quad channel in R5.2 52m

Old Beam Line

Hall: L = 47 m W = 12 m H = 8 m S = 564 m 2 V = 4512 m 3 Two overhead cranes (8 tonnes each)

New Beam Line Modifications required to achieve this: Increased particle flux  smaller collection angle:40 o  25 o higher production energy:620MeV  800MeV Requirements: Requirements: P  < 450MeV/c backgrounds < 10% few muons per  s

New Beam Line Better signal/background  currently: >300MeV/c – all protons <300MeV/c – mainly pions (at 200 MeV/c: 75% , 19% , 6% e)  SC decay solenoid (from PSI)  or quadrupole decay channel

New Beam Line Improved reliability  new target mechanism new magnet power supplies new control system Better safety  more shielding real security fence real beam dump! Performance: Performance: Rate depends momentum at 200MeV/c  3000  /ms for solenoid 300  /ms for quads Background <10%

Layout

Infrastructure Cryogenics: Required for: - super-conducting magnets for MICE - decay solenoid - liquid hydrogen, etc - VLPCs Needs new building: - compressor - He and N store Also used for LH2 Transfer lines

Infrastructure RF power: RF power:- 1MW per cavity, 8MW total - 1-2ms at 1-10Hz - Average power ~1kW/Hz ~ TH116 TH781 RS2058 EX SPS 7651 EX RAL LEVEL CONTROL SOURCE OTHER DRIVE CHAIN 10mW4kW 40kW 400kW4MW DRIVE TO 4 CAVITIES VIA PHASE SHIFTERS AND 70db COUPLERS POWER SPLITTERS AND CIRCULATORS 40 kV20 kV 12kV 5kV R.A. Church RAL - a possible scheme

Infrastructure

Infrastructure Controls and control room: Layout and services: Layout and services: - water - power - lighting - detector layout - detector support - phased installation Hydrogen Hydrogen - safety - detection hardware - igloo - ventilation - interlocks - dump Additional civil engineering - design Additional civil engineering - design - hall preparation - hole through ISIS wall

Safety Main issues: Hydrogen! Magnets – fringe fields and quenches Radiation safety – ISIS beam loss RF – x-rays and dark current Cryogenics HV Vacuum etc

Hydrogen Critical safety issue! Cooling channel requires minimum window thickness Particularly true for cooling rings Most work done in the US so far Thin Al windows designed and tested against FNAL safety regulations in US

Hydrogen Liquid hydrogen used at RAL: moderator in ISIS target station (much smaller volume) Helium Vacuum Hydrogen Prevents oxygen condensation on cold surfaces after leak through vacuum window

Hydrogen Corresponding MICE layout: More windows, degraded performance Need a true test of a “real” cooling channel absorber Will need to pass CLRC safety review Argon jacket

Fringe Fields of Magnets Four potential hazards: Four potential hazards: - effect on ISIS control rooms - effect on ISIS linac and synchrotron - effect on pace-makers - effect on ferromagnetic objects 0.5mT10mT Baseline case

X-Rays X-rays and dark current are a strong function of RF voltage. Need to shield, particularly x-rays.

Effect on ISIS During construction: Much work in next long shutdown - competition for resources (staff) - bigger hole in ISIS wall Much work in preparation and after - competition for resources (2 nd target station) During data-taking: Fringe field on linac- negligible Decay solenoid field on synchrotron- no problem Target beam loss- no worse

Cost to the UK SectionItem Material/k€ Staff Years Total Cost/k€ CoolingMagnets RF Absorbers Diagnostics SpectrometerTracker AncillaryCryogenics Vacuum Other Beam, etc Management Civil Eng Old beam New target New beam Services OtherTravel Analysis Total

Cost to the UK Cost of new decay solenoid removed RF contribution re-defined: wave guides  power amps Changes with respect to proposal: Some totals £k: Materials= £ 7520k Staff for construction= £ 1970k Travel= £ 310k Support/analysis= £ 1100k TOTAL= £10900k

UK Management UK Collaboration formed (MICE UK): 8 labs, 44 people UK contact-person: Ken Long (IC) UK steering group: 1 person/lab, except CLRC At CLRC: MICE management following formal guidelines - Joint Project Board (Long, Peach, Taylor, Wade) - Interim Project Management Committee - Installation Technical Working Group - Safety Technical Working Group Project Sponsor- Ken Peach Project Leader- Rob Edgecock Project Scientist- Ken Long Project Manager- Paul Drumm

Conclusions The NF will address questions of fundamental importance to PP and cosmology The NF will address questions of fundamental importance to PP and cosmology MICE is crucial for demonstrating cooling for a NF MICE is crucial for demonstrating cooling for a NF Equivalent to Tesla/CLIC Test Facilities Equivalent to Tesla/CLIC Test Facilities A large and motivated collaboration has formed A large and motivated collaboration has formed This has shown MICE can be built and will work This has shown MICE can be built and will work Total cost ~1% of a Neutrino Factory Total cost ~1% of a Neutrino Factory MICE is a major opportunity for the UK - build on what’s been achieved - big step towards our aims - increase UK involvement in the NF - bring particle physicists to the UK MICE is a major opportunity for the UK - build on what’s been achieved - big step towards our aims - increase UK involvement in the NF - bring particle physicists to the UK The UK has the resources and expertise to provide beam and infrastructure and make big contributions to the experiment The UK has the resources and expertise to provide beam and infrastructure and make big contributions to the experiment