David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.

Slides:



Advertisements
Similar presentations
Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
P. Emma LCLS FAC 12 Oct Comments from LCLS FAC Meeting (April 2004): J. Roßbach:“How do you detect weak FEL power when the.
P. Emma FAC Meeting 7 Apr Low-Charge LCLS Operating Point Including FEL Simulations P. Emma 1, W. Fawley 2, Z. Huang 1, C.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Juhao Wu Feedback & Oct. 12 – 13, 2004 Juhao Wu Stanford Linear Accelerator Center LCLS Longitudinal Feedback with CSR as Diagnostic.
Injector RF Design Review November 3, 2004 John Schmerge, SLAC LCLS RF Gun Thermal Analysis John Schmerge, SLAC November 3,
Juhao Wu LCLS FAC 7 Apr Dark Current, Beam Loss, and Collimation in the LCLS J. Wu, D. Dowell, P. Emma, C. Limborg, J. Schmerge,
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
C.Limborg-Deprey Beam Dynamics Justifying L01 November 3 rd 2004 Beam Dynamics Justifications of modification of.
DUAL FEED RF GUN DESIGN FOR LCLS Liling XIAO, Zenghai LI Advanced Computations Department Stanford Linear Accelerator Center Nov , SLAC-LCLS Injector.
Feedback and CSR Miniworkshop on XFEL Short Bunch, SLAC, July 26 – 30, 2004 Juhao Wu, SLAC 1 Juhao Wu Stanford Linear Accelerator.
Comments from LCLS FAC Meeting (April 2004): J. Rößbach:“How do you detect weak FEL power when the gain is very low (few hundred)?” K. Robinson:“Can you.
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
David H. Dowell RF Gun Commissioning LCLS FAC April 16, RF Gun Commissioning Experience David H. Dowell for the LCLS Injector.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
August, 2003 W.S. Graves 1 Electron beam diagnostic methods William S. Graves MIT-Bates Laboratory Presented at 2003 ICFA S2E Workshop DESY-Zeuthen August,
Low Emittance RF Gun Developments for PAL-XFEL
I.V. Bazarov, ERL advisory mtg, Sept 2012 CLASSE Cornell University CHESS & ERL Cornell Laboratory for Accelerator-based ScienceS and Education (CLASSE)
High Current Electron Source for Cooling Jefferson Lab Internal MEIC Accelerator Design Review January 17, 2014 Riad Suleiman.
S2E in LCLS Linac M. Borland, Lyncean Technologies, P. Emma, C. Limborg, SLAC.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
David H. Dowell and Friends SLAC National Accelerator Laboratory David H. Dowell and Friends SLAC National Accelerator Laboratory The LCLS Gun ICFA Beam.
Simulation of Microbunching Instability in LCLS with Laser-Heater Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
LCLS-II Injector layout design and study Feng Zhou 8/19/2015.
X-band Based FEL proposal
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
LSC/CSR Instability Introduction (origin of the instability) CSR/LSC
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Have a chance to operate your own beam at CERN
Thermal emittance measurement Gun Spectrometer
Injector Performance Requirements Conventional Facilities Update
The Cornell High Brightness Injector
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Electron Source Configuration
Injector: What is needed to improve the beam quality?
Advanced Research Electron Accelerator Laboratory
Injector Commissioning C
Linac/BC1 Commissioning P
LCLS Commissioning P. Emma, et al
LCLS Tracking Studies CSR micro-bunching in compressors
High Level Physics Applications for LCLS Commissioning
Modified Beam Parameter Range
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
Simulations for the LCLS Photo-Injector C
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
LCLS Injector Commissioning P
LCLS Injector Configuration
LCLS Injector System Overview D. H
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Injector Physics C. Limborg-Deprey, D. Dowell ,Z. Li. ,H. Loos, J
Overview of RF Gun Specifications and Technical Issues
Injector Physics C.Limborg-Deprey Feb.8th 2006
Presentation transcript:

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac RF Design D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector Requirements Injector Configuration Nov 3, 2003 Injector Technical Review Comments and Response Pulsed Heating of 120 Hz Gun Long Pulse Option Laser Heater Gun Diagnostics and Commissioning Gun Solenoid Field Quality Dual RF Feed on L0-1 Accelerator Section Straight Ahead Diagnostics Cathode Damage

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 LCLS Injector Performance Requirements:

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Slice Emittance Requirements  projected < 1.2 mm.mrad  slice < 1.0 mm.mrad for 80 slices out of 100  slice (80%) projected emittance for the core 80 slices

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 LCLS Injector Configuration RF Gun Load Lock Transverse RF Cavity Laser Heater DL1 Bend Straight Ahead Spectrometer L0-1 & L0-2 3-m SLAC Sections Gun Diagnostics

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Nov 3, 2003 Injector Review Committee Recommendations and Concerns Pulsed Heating of Gun Coupling Irises (Study underway, completed L0-1 dual feed) Eliminate gun tuners (Under consideration, include with field symmetrization) Two stages of gun commissioning (Not possible given budget + schedule + space; Make extensive use of diagnostics in GTL) Gun optimization using diagnostics (19-parameter problem => needs detailed commissioning plan) Spontaneous radiation from laser-heater undulator for e-beam diagnostics Long bunch experiments at GTF, SDL, etc. (Planning expts. at BNL/DUVFEL) Prototyping of load lock porcupine concept (Performed during engineering) Need commissioning plan using diagnostics, need more diagnostics (diagnostics available, still need detailed commissioning plan) Include streak camera measurement at gun (EO maybe unreliable) (Streak Path to Laser Bay included in design) S2E using non-optimal injector performance (Not yet done) More operating time at GTF (GTF is now operating) Injector layout indicates vault is too small (Too expensive to enlarge vault) Use chicane to couple laser into laser-heater (Yes!)

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Pulsed Heating of Gun Coupling Irises The maximum steady-state stress of 14 ksi occurs around the RF aperture. Analysis in progress by Zenghai Li and Liling Xiao, SLAC/ACD. (see work on L0-1 Linac Dual Coupler) Gun body stress in Pa

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Increasing Bunch Length to 17.5 ps Reduces Emittance > Allows Smaller Laser on Cathode< Plots from C. Limborg, Injector Requirements, Nov 3, 2003 Injector Review More compression in Linac now possible with Laser Heater Experiments possible at BNL/DUVFEL during Dazzler tests

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 P 0 = 65 MW w 0  3 mm  x,y  0.1 mm  73.6 keV  73.6 keV Matlab laser-heater code (thanks to major help from Juhao Wu)

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Horizontal emittance growth is small:  /  x0  ½(    x /  x ) 2 < 0.1%    4  10  4,  x  20 mm,  x  200  m 2 cm 10 cm 50 cm ~120 cm   5.7º Place undulator inside a chicane to allow laser interaction (thanks to Todd Smith, November 3 Injector Review) Slide compliments of P. Emma

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 P 0 = 2 MW w 0 = 400  m  x  200  m  y  200  m R 52 (=  x ) of chicane smears time coordinates after chicane  x' 2  1/2  x >>  (20  rad)(20 mm) >> (800 nm)/2 

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Laser-Heater Parameters

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 WBS Laser Heater

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Gun to Linac Diagnostics Electron Measurements: Thermal Emittance Charge Energy Energy Spread Pulse Shape (streak camera & EO) Longitudinal Emittance by Streaking Spectrometer Screens Gun Spectrometer Resolution: 10 keV with Quads off 3 keV with Quads on

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 At Low Charge the Gun’s Compression Converts Temporal Modulation into Energy Modulation Plots from C. Limborg, Nov 3, 2003 Injector Review

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Gun Solenoid Multipole Fields

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 L0-1 Dual Feed Coupler Design by Z. Li, SLAC/ACD

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, b= w= dc= t= R= tf= rough dimensions: skin and fillet not corrected for operation temperature Racetrack Dual Feed Eliminates Dipole and Quadrupole Field Perturbations in Coupler Cell Design by Z. Li, SLAC/ACD

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Electron Diagnostics At 135 MeV

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 ~0.5 mm Beam Induced Damage to Cu Cathode Profilometer Measurements Using a 0.2 Micron Quartz Stylus

David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Summary and Conclusions Discussed Nov 3 Review Committee’s Concerns Gun Diagnostics for Commissioning 17 Parameter Problem Still Needs Work Laser Heater Now Part of Injector System Measured Field Multipoles of Gun Solenoid Dual RF Coupler Designed for L0-1 Similar Issues in Dual Feed RF gun Dual Coupler Design for Gun is Next (Including Pulsed Heating) Straight Ahead Diagnostics for Commissioning Cathode Damage Effects