Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, 20041 Timing Counter july 2004.

Slides:



Advertisements
Similar presentations
GEM Chambers at BNL The detector from CERN, can be configured with up to 4 GEMs The detector for pad readout and drift studies, 2 GEM maximum.
Advertisements

COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
INFN of Genova, Pavia and Roma Flavio Gatti, PSI, February 9 th, Timing Counter status Timing Counter status.
Scintillator based muon upgrade / BELLE Super B Factory Workshop In Hawaii Jan 2004, Honolulu, Hawaii 1.Scintillator strip option 2.Geiger photodiodes.
MB1 T.O.F. II Precise timing Electron ID Eliminate muons that decay Tracking devices T.O.F. 0 & I Pion /muon ID precise timing 201 MHz RF cavities Liquid.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
Measurement of the absolute efficiency,
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
Photon detection Visible or near-visible wavelengths
6 April 2006, LGStatus Report Beam Working Group1 Beam Working Group Status Report 6 April 2006 Presented by Lau Gatignon  Cedar status  MNP33-2  Outgassing.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
G.Bencivenni LNF/INFNMuon Meeting 21-October-2002 Status Report on triple-GEM detector M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano.
NINO RO chip qualification with the laser test system Sakari and Fadmar.
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
Timing Counter Report of Feb. 14 th, 2007 P.W. Cattaneo.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
THE FORWARD PROTON DETECTOR AT DZERO Gilvan Alves Lafex/CBPF 1) MOTIVATION 2) DETECTOR OPTIONS 3) FPD R&D 4) OUTLOOK Lishep 98 Lafex/CBPF Feb 17, 1998.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Montpellier, November 15, 2003 J. Cvach, TileHCAL and APD readout1 TileHCAL- fibre readout by APD APDs and preamplifiers Energy scan with DESY beam –Energy.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
Timing Counter Report of Feb 20th, 2008 F.Gatti. Final Construction Phase of TC TC with fibers exposed TC upside down for Fiber APD gluing High reflectance.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
1 MEG 陽電子タイミングカウンタの ビーム中での性能評価と 解析方法の研究 * 内山雄祐 東大素粒子セ, INFN-Genova A, INFN-Pavia B 森俊則 F. Gatti. A,S.Dussoni A,G.Boca B,P.W.Cattaneo B, 他 MEG Collaboration.
T0 status1W.H.Trzaska HIP Jyväskylä Status of T0 project ALICE Comprehensive Review IV March 23, 2004.
CMS ECAL Laser Monitoring System Christopher S. Rogan, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
MEG II 実験のための 陽電子タイミングカウンター実機建設 Construction of Positron Timing Counter for MEG II experiment 西村美紀(東大) 他 MEGIIコラボレーション 日本物理学会 2015年 秋季大会 大阪市立大学(杉本キャンパス)
V0L Hardware Status ALICE WEEK CERN, MARCH 2003 Ana Delia Becerril IFUNAM, México.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
Catania Study on large area photomultipliers with superbialkali photocathode E. Leonora 1, S. Aiello 1, D. Lo Presti 2, V. Giordano 1 1 INFN, section of.
Catania 11 ICATPP october, 2009 Como 1/12 Catania Comparative measurements of the performances of four super bialkali large.
28 June 2007G. Pauletta: ALCPG Tests of IRST SiPMs G. Pauletta Univ. & I.N.F.N. Udine Outline 1.IRST SiPMs : baseline characteristics 2.first application.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Multipixel Geiger mode photo-sensors (MRS APD’s) Yury Kudenko ISS meeting, KEK, 25 January 2006 INR, Moscow.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
TIMING COUNTER: status report Giorgio CECCHET, PSI July 11th, 2003.
PMT measurements in Antares Oleg Kalekin on behalf of Antares collaboration VLVnT 2011 Erlangen
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
Genova/Pavia/Roma Flavio Gatti, PSI, 11 February, Timing Counter: january 2004.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
Characterization of Hamamatsu R12199 PMTs Oleg Kalekin KM3NeT Meeting CPPM, Marseille
Eli Piasetzky Tel Aviv University Beam Scintillating Fibers PSI, Technical Review, July 2012 Guy Ron Hebrew University Israel.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
Activities at SMI/Vienna in testing the performance of SiPMs
An Active TARget for MEG-II, a status report
Timing Counter: progress report
Timing Counter G.Cecchet INFN Pavia Genoa & Pavia F.Gatti,S.Dussoni
K. Sedlak, A. Stoykov, R. Scheuermann
Chris Smith California Institute of Technology EPS Conference 2003
Upgrade of LXe gamma-ray detector in MEG experiment
Instrumentation for Colliding Beam Physics 2017
Timing Counter Sept CSN I, Assisi 2004 Giorgio Cecchet.
Directional Optical Module Integration
Upgrade of LXe gamma-ray detector in MEG experiment
Department of Physics and Astronomy,
MEG Summary T. Mori for MEG Collaboration February 9, 2005.
CLAS 12 Status of the test bench Calculation of the time resolution
New Results from the MEG Experiment
Presentation transcript:

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter july 2004

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter Activities Timing resolution: 100 ps FWHM have been achieved. PM’s characteristics in the COBRA magnet: gain and timing. Full charactherisation of single TC’s counter is started Final design and integration with DC is started Ф-detector : APD directly from Hamamatsu

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, TC key features Scintillator Cross Section 39x39 mm 70º PM section PM active diameter 30º 8.5º From COBRA center 105 cm 10º 25 cm B B 0.75 T 1.05 T Expected Reduction factor Ext. PMInt. PM 8.5º 20º 10º 20º 8.5º 20º 10º 20º ☺ Increase Positron Path-Length ~ 5 cm ☺ Improve Geom. Matching Scint.- PMT ☺ Tilt the ~ 30º respect Magn. Field → Rotated Scint. Slab improves response uniformity and timing performance due to coincidences. *Note: data not corrected for time-walk effect

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Gain and TTS in the COBRA Magnet (April 04) PM Drift Chamber assembly Scintillator slab COBRA Magnet Test of PM’s gain and timing resolution in the final operating conditions

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Gain vs Rate Zero field 1.05 T 27.5º The Gain vs Rate at 1500 V in zero field is fully recovered at 1.05 T and 27.5º at 2100 V. Unallowable increase of biasing voltage are needed at 0º.

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Gain Vs Bias at several angles Same gain Max gain curve in magn. field +10º

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, RMS timing resolution vs p.e. 60ps pulsed blue Laser attenuator 100um Fiber PM Laser beam illuminates the whole photocatode

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Conclusions: –2” PMs allow to obtain the target resolution –At first order, the resolution is limited by the number of photoelectrons (light output from scintillator, quantum efficiency of PM, coupling scintillator-PM[2”], which has 39 mm dia. active area) –At second order, the slew rate could be used to improve the resolution in small signal regime: we have demonstrated that amplification recovers the timing resolution. – 2” PMs can supply 100uA -maximum- current ( 10uA for 1.5” PMs) –2” PMs Lifetime=100uAx100h which correspond to 2.3 years at the event rate of gain of 6x10 5. An increase of a factor 2 can be easily obtained. To be done: -First systematic tests of single element of TC started in the run (May, 31 – June, 12) and will continue in the Frascati BTF –Finalize the design of TC and integration with DC 50x39 mm 39x39 mm

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Single Counter Response Study

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Single Counter Response Study 39x39 slab in rotated configuration simulating a positron 40.5° along z and 70°in radial plane Very Preliminary Position (mm) Time Resolution FWHM (ps) BC408 BC404

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, TC inside the COBRA

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, D view of TC

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Curved detector (triggering) The design of the curved detectors has been modified in order to match the budget limits for procurement of virgin APD form Hamamatsu (159 Euro/each). ~ 80 scintillating fibers and 160 APD per each TC. Procurement preliminary procedure started APD Scint. Fibers 5 x 10 mm

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Timing Counter Schedule Test Milestone AssemblyDesignManufactoring Full installation COBRA Test Beam Test Design Assembly PMT EvaluationPMT procur. Procur & Manuf. APD EvaluationAPD testAPD procur. Beam Test Design PMT EvaluationPMT procur. Procur & Manuf. APD EvaluationAPD testAPD procur. Mechanical matching BG test APD procur. New APDs

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st,  - detector (triggering) We found good APDs with high S/N ratio that we tested at PSI and LNF (Frascati) e-  beam Pure e-beam

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st,  - detector (triggering) But, only about 10% of the selected APDs are good enough Huge spread in dynamic parameters not predictable from static parameters [left figure] The CMS selection and conditioning of the first batch of APDs is not applicable to MEG (we are working at few Volts from Vbkd – high gain- and we are interested to high slew rate and high S/N for timing purpose) For comparison new APDs from Hamamatsu have similar response[right figure] More work is needed to better understand the correlation between static and dynamic parameters of CMS APDs. From Hamamatsu from CMS selection

Genova/Pavia/Roma Flavio Gatti, PSI, July 1st, Status of test and procurements of APD Pulsed Laser Integrating Calibrated Photometer Fast Photodiode Photomult iplier 1/1000 attenuator Splitters APD Copper block Peltier Cell About 10% can be accepted APD test bench in Genoa