The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.

Slides:



Advertisements
Similar presentations
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Advertisements

Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
MINERvA Overview MINERvA is studying neutrino interactions in unprecedented detail on a variety of different nuclei Low Energy (LE) Beam Goals: – Study.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
Mary Ann Woodson National Credit Union Administration Office of the Chief Financial Officer NCUSIF Quarterly Statistics March 31, 2008.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
1 Upper Basin Snowpack as of 3/26/2014
Four files erik_a2_stockholm_temp Erik simulation scenario A2 until 2100 erik_a2_stockholm_prec Erik simulation scenario A2 until.
All Exp Mtg May 5, 2008 NuMI-MINOS Status Report – Tingjun Yang FAR DETECTOR: 99.7% live time (wall clock) Everything was running pretty smooth NEAR DETECTOR:
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Gantt Chart of Progress FY
Jan 2016 Solar Lunar Data.
Monthly Report For January 2017
The 6 steps of data collection:
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Best viewed in slide show mode (F5)
Average Monthly Temperature and Rainfall
80-Hour SHARP Certification Course Schedule

Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Gantt Chart of Progress FY
Free PPT Diagrams : ALLPPT.com


Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
Jan Sun Mon Tue Wed Thu Fri Sat
©G Dear 2008 – Not to be sold/Free to use
T2K Run8 MUMON Summary.

Electricity Cost and Use – FY 2016 and FY 2017
ENTANGLEMENTS REPORTED

Unemployment in Today’s Economy
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Change Management E2E Roadmap
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011

2 Data ×10 13 POT/pulse for targetLimit 2.5×10 13 POT/pulse for target Started up in LE250 HE mode, ×10 19 POT as of Jun 19. –We have taken 0.72×10 19 POT as of Jun ×10 19 POT92.3% live from Apr 22 – Apr 28, 0.335×10 19 POT –However, the inefficiency Jun 16 – Processing problem which is recoverable. –MINOS live time is about 98% to Jun 19 Tomorrow, Jun 21, the plan is to move target to LE10 FHCTomorrow, Jun 21, the plan is to move target to LE10 FHC % live time Apr 22 – Apr 28

He Leak The He leak has increased to about 13 l/min. This leak does not appear to affect the cooling of the target as the He appears to be escaping into the chase rather than the water Target scan appears to be fine, so there is no indication of a water leak 3

MINER A POT/Day Nov Present 4 x

5 Accumulated POT to Jun 16 Anti- run, full scale corresponds to 1.76×10 20 POT –# POT for collected for anti- before Mar 23 10, official start of MINER A run Minerva run, full scale corresponds to 4.9×10 20 POT – # for which MINERvA project & experiment were reviewed & the detector built. Projected assumes 0.92×10 18 POT/day and adding the limit of 2.5×10 12 POT/pulse to Sep plus 2 week shutdown in Aug 2011 to change target –# POTs – average over the uptime during the past 1.5 years –Actual run plan not yet determined, this is one possible scenario

NuMI Beam Plots 6

Protons for the Week 7

FY2011 Protons 8

NuMI Protons over History 9