ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.

Slides:



Advertisements
Similar presentations
The Topics that will be addressed in this Module include:
Advertisements

Module 8: Government Required Reports
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
An Overview of Earned Value Management (EVM) Using EVM to Track Progress.
International Campus – Kish Sharif University of Technology Session#12.
Project Cost Management Estimation Budget Cost Control
Project Change Management
National Aeronautics and Space Administration ANSI/EIA-748-B Earned Value Management Systems (EVMS) 32 Guidelines ANSI/EIA-748-B Earned Value.
Monitoring and Control Earned Value Management (EVM)
Project Management Session 7
XII- COST CONTROL, MONITORING & ACCOUNTING
NF 533 Reporting NF 533 Reporting  March 6, 2014.
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Earned Value Management Guidelines Tony Finefield Finefield Consulting CPM Webinar 5 September
Project Management 6e..
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
Chapter 13: Progress and Performance Measurement and Evaluation
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Full Costs and Their Uses
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
1 Financial Management: A Course for School Nutrition Directors (4 Hour) National Food Service Management Institute.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Project Tracking. Questions... Why should we track a project that is underway? What aspects of a project need tracking?
Soft Tech Development Inc. 1 Software Project Tracking A CMM Level 2 Key Process Area Soft Tech Development Inc.
1 Cost Benefit EVM at DOT Presented to: Joint Industry – Government NDIA PMSC session Presented by: H. Giovanni Carnaroli Associate CIO, IT Policy Oversight.
1 Program Management Systems Committee Joint Industry/Government Meeting May 21, 2009 EVM for Service Contracts Working Group.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Earned Value Management Tutorial Module 5: EVMS Concepts and Methods Prepared by:
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
Chapter 15 Cost Control.
Management & Development of Complex Projects Course Code - 706
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Adult Education and Literacy Budget Development and Cost Allocation.
Project Life Cycle.
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
1 Administrative Office Management, 8/e by Zane Quible ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River, NJ Budgetary and Cost.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 5 – Project Planning.
Management & Development of Complex Projects Course Code - 706
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
The Project Plan Plan Your Work, then Work Your Plan
Felix Sanchez and Don Cole
Nadine Kurita LUSI DOE Review July 23, 2007 PMCS 1 Project Management Cost and Schedule Nadine Kurita ANSI/EIA-748-A Standard.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
1. 2 Managing Risk and Reward by Contract Type Breakout Session # 501 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Tuesday, July 31, :30-3:45.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
The Budgeting Process 7. OBJECTIVE 1: Define budgeting, and explain budget basics.
CHAPTER 14 COST ANALYSIS FOR PLANNING McGraw-Hill/Irwin©The McGraw-Hill Companies, Inc., 2002.
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
3. SYSTEMS DESIGN: JOB-ORDER COSTING
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
Earned Value Management
Earned Value - What is it
EVM 202—Lesson 3 EVMS Guidelines and Compliance
Project Management Process Groups
Managing Project Work, Scope, Schedules, and Cost
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration

2 ANSI EVMS Guidelines Organization (5 guidelines): Organization (5 guidelines):  Define contractual effort and assign responsibilities for the work Planning, Scheduling and Budgeting (10 guidelines): Planning, Scheduling and Budgeting (10 guidelines):  Plan, schedule, budget and authorize the work Accounting Considerations (6 guidelines): Accounting Considerations (6 guidelines):  Accumulate costs of work and material  Report on progress/accomplishments to date Analysis & Management Reports (6 guidelines): Analysis & Management Reports (6 guidelines):  Compare planned, earned and actual costs, analyze variances and develop estimates of final costs Revisions and Data Maintenance (5 guidelines): Revisions and Data Maintenance (5 guidelines):  Incorporate internal and external changes

National Aeronautics and Space Administration 3 Organization 1)Define the authorized work elements for the program. A work breakdown structure (WBS), tailored for effective internal management control, is commonly used in this process. 2)Identify the program organizational structure including the major subcontractors responsible for accomplishing the authorized work, and define the organizational elements in which work will be planned and controlled. 3)Provide for the integration of the company’s planning, scheduling, budgeting, work authorization and cost accumulation processes with each other, and as appropriate, the program work breakdown structure and the program organizational structure. 4)Identify the company organization or function responsible for controlling overhead (indirect costs). 5)Provide for integration of the program work breakdown structure and the program organizational structure in a manner that permits cost and schedule performance measurement by elements of either or both structures as needed. Source: ANSI/EIA-748-A, Earned Value Management Systems (2002)

National Aeronautics and Space Administration 4 Planning, Scheduling, and Budgeting 6)Schedule the authorized work in a manner which describes the sequence of work and identifies significant task interdependencies required to meet the requirements of the program. 7)Identify physical products, milestones, technical performance goals, or other indicators that will be used to measure progress. 8)Establish and maintain a time-phased budget baseline, at the control account level, against which program performance can be measured. Initial budgets established for performance measurement will be based on either internal management goals or the external customer negotiated target cost including estimates for authorized but undefinitized work. Budget for far-term efforts may be held in higher level accounts until an appropriate time for allocation at the control account level. On government contracts, if an over-target baseline is used for performance measurement reporting purposes, prior notification must be provided to the customer. 9)Establish budgets for authorized work with identification of significant cost elements (labor, material, etc.) as needed for internal management and for control of subcontractors. 10)To the extent it is practicable to identify the authorized work in discrete work packages, establish budgets for this work in terms of dollars, hours, or other measurable units. Where the entire control account is not subdivided into work packages, identify the far term effort in larger planning packages for budget and scheduling purposes. Source: ANSI/EIA-748-A, Earned Value Management Systems (2002)

National Aeronautics and Space Administration 5 Planning, Scheduling, and Budgeting (cont’d) 11)Provide that the sum of all work package budgets plus planning package budgets within a control account equals the control account budget. 12)Identify and control level of effort activity by time-phased budgets established for this purpose. Only that effort which is unmeasurable or for which measurement is impracticable may be classified as level of effort. 13)Establish overhead budgets for each significant organizational component of the company for expenses which will become indirect costs. Reflect in the program budgets, at the appropriate level, the amounts in overhead pools that are planned to be allocated to the program as indirect costs. 14)Identify management reserves and undistributed budget. 15)Provide that the program target cost goal is reconciled with the sum of all internal program budgets and management reserves. Source: ANSI/EIA-748-A, Earned Value Management Systems (2002)

National Aeronautics and Space Administration 6 Accounting Considerations 16)Record direct costs in a manner consistent with the budgets in a formal system controlled by the general books of account. 17)When a work breakdown structure is used, summarize direct costs from control accounts into the work breakdown structure without allocation of a single control account to two or more work breakdown structure elements. 18)Summarize direct costs from the control accounts into the contractor’s organizational elements without allocation of a single control account to two or more organizational elements. 19)Record all indirect costs which will be allocated to the contract. 20)Identify unit costs, equivalent unit costs, or lot costs when needed. 21)For EVMS, the material accounting system will provide for: Accurate cost accumulation and assignment of costs to control accounts in a manner consistent with the budgets using recognized, acceptable, costing techniques. Cost performance measurement at the point in time most suitable for the category of material involved, but no earlier than the time of progress payments or actual receipt of material. Full accountability of all material purchased for the program including the residual inventory. Source: ANSI/EIA-748-A, Earned Value Management Systems (2002)

National Aeronautics and Space Administration 7 Analysis and Management Reports 22)At least on a monthly basis, generate the following information at the control account and other levels as necessary for management control using actual cost data from, or reconcilable with, the accounting system: Comparison of the amount of planned budget and the amount of budget earned for work accomplished. This comparison provides the schedule variance. Comparison of the amount of the budget earned and the actual (applied where appropriate) direct costs for the same work. This comparison provides the cost variance. 23)Identify, at least monthly, the significant differences between both planned and actual schedule performance and planned and actual cost performance, and provide the reasons for the variances in the detail needed by program management. 24)Identify budgeted and applied (or actual) indirect costs at the level and frequency needed by management for effective control, along with the reasons for any significant variances. 25)Summarize the data elements and associated variances through the program organization and/or work breakdown structure to support management needs and any customer reporting specified in the contract. 26)Implement managerial actions taken as the result of earned value information. 27)Develop revised estimates of cost at completion based on performance to date, commitment values for material, and estimates of future conditions. Compare this information with the performance measurement baseline to identify variances at completion important to company management and any applicable customer reporting requirements including statements of funding requirements. Source: ANSI/EIA-748-A, Earned Value Management Systems (2002)

National Aeronautics and Space Administration 8 Revisions & Data Management 28)Incorporate authorized changes in a timely manner, recording the effects of such changes in budgets and schedules. In the directed effort prior to negotiation of a change, base such revisions on the amount estimated and budgeted to the program organizations. 29)Reconcile current budgets to prior budgets in terms of changes to the authorized work and internal replanning in the detail needed by management for effective control. 30)Control retroactive changes to records pertaining to work performed that would change previously reported amounts for actual costs, earned value, or budgets. Adjustments should be made only for correction of errors, routine accounting adjustments, effects of customer or management directed changes, or to improve the baseline integrity and accuracy of performance measurement data. 31)Prevent revisions to the program budget except for authorized changes. 32)Document changes to the performance measurement baseline. Source: ANSI/EIA-748-A, Earned Value Management Systems (2002)