DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Document No: JPRO01461 14 September 2001 Volume 1 – Executive Summary.

Slides:



Advertisements
Similar presentations
1 Resp Space Presentation LM Concept is Responsive & Affordable Approved for Public Release, Distribution Unlimited.
Advertisements

Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.

F-35 Lightning II: Connecting to the Global Supply Chain Tom Burbage
Payload - Radius Performance Comparison. Profiles:
The Affordable Solution - JSF ‘Joint Strike Fighter’,'JSF', and the JSF Logo are Trademarks of the United States Government. DISTRIBUTION STATEMENT A.
25mm Gun System for the F-35 Joint Strike Fighter (JSF) Presented by: Dave Maher Project Engineer – Joint Strike Fighter Gun System General Dynamics Armament.
Small Diameter Bomb (SDB) Program Public Overview Briefing Current As of: 24 August 2001 Air Armament Center Lethal Strike JPO Eglin Air Force Base,
Distribution Statement A. Approved for public release: distribution is unlimited F-35 JSF Global Sustainment Luke Gill, VP LM.
Birthplace, Home & Future of Aerospace 2014 SECDEF Subsystem PBL of the Year – Sniper Precision Attack Pod 1 DISTRIBUTION STATEMENT A. Approved for public.
CLR 252 Developing Requirements Greg Prothero. Lesson #3: How to Write a Good Requirement Components and Guidelines for writing.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Aeronautical Systems Center USAF Alternative Fuels Certification Program 1 AFPEO/Agile Combat Support.
Lockheed Martin Aeronautics Company DAU JSF Program and Interoperability DAU 8 June, 2004 JSF Program and Interoperability DAU 8 June,
John Gruetzmacher, Lockheed Martin
Jimmy Luo. HistoryHow It WorksCurrent Applications History.
Aero Engineering 315 Lesson 2 History of Aeronautical Design and Introduction to Aircraft Design.
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Joint Communications Release JSF Program Office & Lockheed Martin Subject:
Public Release Number: Distribution Statement A: Approved for public release; distribution unlimited. Program Brief to AUVSI Seafarer Chapter 23.
Technology Maturation for the Automated Aerial Refueling (AAR) Project Carol Ventresca SynGenics Corporation Case Number: 88ABW , Distribution:
Requirements and Operations Team Industry Day Briefing 17 January, 2002.
Ken Moritz and Bo Goode NAVAIR PMA January 2004 V-22 International NAVY-INDUSTRY INTERNATIONAL DIALOG.
PROFESSIONALISE | RE-PRIORITISE | STANDARDISE | BENCHMARK | IMPROVE INDUSTRY RELATIONSHIPS AND INDUSTRY PERFORMANCE | LEAD REFORM UNCLASSIFIEDNew Air Combat.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
7-1 Design of UAV Systems Sorties ratesc 2002 LM Corporation Lesson objective - to discuss Sortie rate analysis including … - Mission planning and preparation.
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of.
DISTRIBUTION STATEMENT A // APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITEDSLIDE #: 1 F-35 DOC #: JSF AS BRIEFED: July 2013 SBIR: The F-35.
FUTURE COMBAT SYSTEMS BG N. Lee S. Price Deputy Program Manager, Future Combat Systems (BCT) Networks and Complementary Systems.
May 11, Ordnance and Tactical Systems Advanced Crew Served Weapons (ACSW) 2004 Small Arms Symposium & Exhibition National Defense Industrial Association.
Performance Based Logistics 20 Nov Current Life Cycle Challenges High Weapon System Sustainment Cost Inefficient End-to-End Supply.
1 GAO’s Use of DAMIR October 31, 2007 David Best Assistant Director
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
2003 USSOCOM SOF CBRN CONFERENCE DECONTAMINATION UPDATE
1 Air Force Basic Research in Materials and Structures 22 October 2003 Air Force Office of Scientific Research The Basic Research Manager for the Air Force.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Control and Accountability of USAF Property on a Large and Busy Air.
Briefing Title_Date - 1 © 2014 Lockheed Martin Corporation DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Use or disclosure.
F – 35 Lightning II Cpl. Jakub Moštěk. F – 35 Lightning II Single-seat Single-engined (jet) Stealth 5 th generation multirole fighter Ground attack, reconnaissance,
UNITY IV Critical Design Review Hill Air Force Base 13 April 2000 Phase II First Launch.
JSF Modeling Information Management JSF Modeling Information Management NDIA Systems Engineering Conference San Diego, California October 2003 Ref: JSF
ASA(ALT)/AAE Perspective The Honorable Claude M. Bolton, Jr. Assistant Secretary of the Army (Acquisition, Logistics and Technology) and Army Acquisition.
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. © 2014 Lockheed Martin Corporation SFTE_SETP_25Oct - 1 Use or disclosure.
V-22 TRAINING SYSTEM.
F-35 Joint Strike Fighter America’s Next Generation Strike Aircraft.
Lockheed Martin Aeronautics Company DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited ABMA September 2007 Tom.
PRODUCTION/ DEPLOYMENT
Copyright 2004 by Lockheed Martin Corporation.
Contracting (Product) Considerations
October 31, 2007 David Best Assistant Director
Is HLA Meeting The Challenge in Enabling SBA?
System Engineering Considerations (See Chapters 3 and 9)
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
CH-53K Marine Heavy Lift Replacement
CLR 252 Developing Requirements
RQM 310 Developing Requirements KPPs and Performance Attributes
Production Considerations
Communications System (DTCS)
Milestone A to Milestone B Requirements Management Activities
Joint Strike Fighter (F-35) Program Update 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
RQM 310 Developing Requirements KPPs and Performance Attributes
Test and Evaluation Considerations
IBR Documentation Review
Product Support Considerations
O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS
Как да кандидатстваме по НИФ
VEHICLE TECHNOLOGY AIR CONDITIONING SYSTEMS.
The Department of Defense Acquisition Process
Integration & Test Instrument Operations Coordination
25mm Gun System for the F-35 Joint Strike Fighter (JSF)
Presentation transcript:

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Document No: JPRO September 2001 Volume 1 – Executive Summary FPR Appendix A - Templates JOINT STRIKE FIGHTER ENGINEERING AND MANUFACTURING DEVELOPMENT PROGRAM EXECUTIVE SUMMARY

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Air Vehicle Concept JVI-063

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. KEY PERFORMANCE PARAMETERS Projected to Meet or Exceed all Requirements DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Combat Radius 450 nm USMC Profile 590 nm USAF Profile 600 nm USN Profile 450 nm UK Profile Sortie Generation4 Surg / 3 Sust3 Surg / 2 Sust Logisitics Footprint < 8 C-17 equivalent loads (20 PAA) < 8 C-17 equivalent loads (24 PAA) < 46,000 cu ft 243 ST < 21,000 cu ft 102 ST Mission Reliability 95% 93% 95% Radio Frequency SignatureVery Low Observable InteroperabilitySecure Voice and Data Link Connectivity Vertical Lift Bring Back 2 x 1K JDAM, 2 x AIM-120 With Reserve Fuel N/A 2 x 1K JDAM, 2 x AIM-120 With Reserve Fuel Maximum Approach SpeedN/A 145 knotsN/A USAFUSNUSMC KPP UK USMC/UK USN Joint

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Air Vehicle Family Design Concept JVI-064

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. STOVL Propulsion System - Prototype Flight Tested In CDP - JVI-065

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Autonomic Logistics System Development JVI-066

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Lockheed Martin JSF World-Class Team - US Manufacturing Locations - JVI-067

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Lockheed Martin JSF World-Class Team - International Manufacturing Locations- JVI-068

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. EMD Master Schedule JVI-069

DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited CY SDD MASTER SCHEDULE Pre-SDD SDD PAC ASRR IBR PDR AS CDR 1 AS CDR 2 AS CDR 3 Blk 1 FTR Block 0 Block 2 Block 1 Block 3 0A 0B0C IBRISR CDR IFR FETT IFRISROCR Development and Qualification CTOL STOVLCVBlk 1 RFTBlk 2 RFTBlk 3 RFT Blk 2 Flt Test Blk 1 Flt Test Blk 3 Flt Test CTOL 1st Flt CV 1st Flt STOVL 1st Flt OA OT&E LRIP I (10) LRIP II (22) LRIP III (54) LRIP IV (91) LRIP V (120) Mission and Vehicle Systems Autonomic Logistics Development Low Rate Initial Production (LRIP) Air System Program Events Propulsion F135 F136 Test and Development LRIP VI (168) Multi Year Production 6 CTOL 4 STOVL 14 CTOL 8 STOVL 20 CTOL 20 STOVL 9 CV 5 UK 30 CTOL 32 STOVL 20 CV 9 UK 44 CTOL 32 STOVL 32 CV 12 UK 72 CTOL 36 STOVL 48 CV 12 UK OA DAE IPR 1 OA DAE IPR 2 OA DAE IPR 3 OA DAE IPR 4 DAE IPR 5 DAB Review ORD IOC USMC ORD IOC USN ORD IOC USAF LLFFLLFF LLFFLLFF LLFF LLFF (4 CTOL, 2 STOVL) (4 CTOL, 4 STOVL, 4 CV) PDR FETT IBR AS PDR CDR PDR CDR Blk 2 FTR Blk 3 FTR FY DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.