EDGE™ Project Overview Presentation P09711- Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME),

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Writing Task F – Implementation Evaluation. Evaluations Overview You have to write 3 evaluations for this unit each focusing on a different theme: Your.
DEVELOPING A TECHNOLOGY PROJECT IN STUDENT AFFAIRS A Guide to the Process Paul Schantz November, 2010.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Copyright 2006 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Third Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Artificial Limb Project By Casey Dill. Mission Statement This project will improve upon existing plans for an artificial arm with the same capabilities.
Copyright 2004 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Second Edition Joseph S. Valacich Joey F. George Jeffrey A. Hoffer Chapter.
Project Management.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
Eric Hettler - ME William Gallagher - ISE Christopher Mieney - ME Gregory Ryan - ME Joseph Cole - EE.
Automation/Improvement of Packaging on Cookie Line Project Manager: Stephanie Rager (IE) Chief Engineer: Bruno Coelho (ME), Members: Brian Duffy (EE),
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Meet the Team Aaron Heyman  5 th Year Industrial Engineer  Team Lead Adam Cook  5 th Year Industrial Engineer Jose Rodriguez  5 th Year Industrial.
What is a project? Project Management Institute definition
EDGE™ Project Status Update P09141 – Thermal Heater Control System Anthony Berwin (Mechanical Engineer)
Automation/Improvement of Packaging on Cookie Line Project Manager: Stephanie Rager (IE) Chief Engineer: Bruno Coelho (ME), Members: Brian Duffy (EE),
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Managing Projects. Contemplative Questions  What does project management entail?  Do I want to be a project manager? What is the nature of the work?
P09713 – FRESH BREAD AND ROLL SCALING ROOM Senior Design Winter
EDGE™ Systems Level Design Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME),
EDGE™ Project Overview P09503 – Electrophotographic Development and Transfer Station David Schwartz – ISE (Team Lead) Ruth Gay – ME Phillip Lopez – ME.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
Preliminary Project Outline P09231: Airframe A; Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Matt Greco (ME) B. Shawn.
Multidisciplinary Engineering Senior Design Project xxxxx Project Name Preliminary Design Review mm/dd/yy Project Sponsor: Team Members: Team Mentor: Acknowledgements:
Ground Scouts P09207 Team: Stewart Wadsworth (ME) Alex Sojda (EE) Josh Watts (CS) Matt DiMicco (EE) Tae Cooke (EE) Faculty Guide: Dr. Sahin (EE) Primary.
EDGE™ Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME),
Wegmans Batch Prep Project System Design Review January Steve Crane Emil Kostraba Adam Merah Josh Monsees Stephanie Walter.
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Project Status Update R09220 – Competitive FSAE Autosports Systems Aaron Heyman (IE) Shijo George (ME) Stephanie Malinowski (ME) Alex Sandy (ME) Greg Wall.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Computer System Analysis
Copyright © 2009 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Essentials of Systems Analysis and Design Fourth Edition Joseph S. Valacich Joey F.
S/W Project Management
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
May 12 th Monitoring and Project Control. Objectives Anticipated Outcomes Express why Monitoring and Controlling are Important. Differentiate between.
CIS 499 Senior Seminar IT project management. Exercise. Write a testable problem statement in subject verb format. Who? Are the people going to use this.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
Project Management April 28, 2008 Eric Verzuh Project Management April 28, 2008 Eric Verzuh.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Thoughts Before Requirements Gathering. Requirements Gathering Functional Requirements – Functional requirements explain what has to be done by identifying.
CSULB EE400D DOCUMENTATION INSTRUCTIONAL SERIES PRELIMINARY DESIGN REVIEW.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
16 Chapter Management Control McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
Introducing Project Management Update December 2011.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Project Review P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME), Chukwuma.
THROUGH NERANJAN DHARMADASA JAMES BROWN P09451: Thermo-Electric Module for Large Scale Systems.
Copyright 2001 Prentice-Hall, Inc. Essentials of Systems Analysis and Design Chapter 2 Managing the Information Systems Project 2.1.
Team-Based Development ISYS321 Managing the Information Systems Project.
Preliminary Business Plan. Challenge, needs What is the business challenge your product offers a solution to? Describe the pains/costs of not using your.
EDGE™ Final Project Plan Presentation P09001 – RFID Reader & Active Tag Philip Davenport (Industrial and Systems Engineering)
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Systems Analysis and Design in a Changing World, 4th Edition
Project Integration Management
Project Status Update R09220 – Competitive FSAE Autosports Systems
Team Introduction Project Team Members Faculty Guide Customers
P10457: D-R Process Improvement
Project Integration Management
Project Integration Management
Project Overview.
Presentation transcript:

EDGE™ Project Overview Presentation P Automation/Improvement of Wegmans Cookie Line Packaging Project Team: Stephanie Rager (IE), Bruno Coelho (ME), Mark Voss (ME), Chukwuma Morah (IE), Brian Duffy (EE), Benjamin Powell (EE)

EDGE™ Project Overview Mission Statement: The mission of this project is to create an automated prototype that will separate mini cookies by weight, while preventing cookies from moving on in the process until a specified weight is reached. It will create a clear separation between the sets of cookies that go into each package without substantially slowing down the packaging process. Project Description: Wegmans bakes and packages all of their mini cookies at their bakeshop located here in Rochester on Brookes Avenue. Currently the packaging is done by six or seven people who stand around a conveyor and pull the cookies into the clam-shell packages. This leads to the problem of packing more cookies than needed into a package. The mini-cookie package calls for 398 grams worth of cookies but employees sometimes package up to 450 grams. This is a loss for Wegmans because customers are receiving more cookies than they are paying for. This project will look into building an automated prototype that will separate the cookies into the correct amount by weight, which the employees can then package.

EDGE™ Key Challenges/Risks Description of RiskPossible Consequences Probability (H/M/L) Severity (H/M/L) Overall (H/M/L) Contingency Plan Insufficient Funds- Wegmans doesn't have the funds to support project Unable to proceed with implementation/creation of final prototype MHM/H Develop a cost-effective prototype, thoroughly discuss budget and project with Wegmans Substantially slows down process It would not make sense to implement final prototype LHM Perform proper analysis and adjustments of prototype to ensure this is not a problem Technology- needed technology to create prototype is not available Unable to create an effective final prototype that performs necessary goals MHM/H Perform proper research to ensure that the needed technology is available Reduces quality of cookies Design and prototype cannot be implemented LHM Ensure that design will not reduce cookie quality, build in a safe guard to keep cookies from being destroyed Insufficient skillsStudents are unable to perform necessary tasks to complete project LHMEnsure that team members are doing the proper research for their tasks, provide help to other team members, seek out the necessary help

EDGE™ Deliverable Status Needs Assessment – Preliminary Complete- Uploaded on EDGE One-Page Project Summary – Preliminary Complete – Uploaded on EDGE Work Breakdown Structure – Preliminary Complete – Uploaded on EDGE Two-Quarter Schedule – Preliminary Complete – Uploaded on EDGE Team Norms & Values – Complete – Uploaded on EDGE