GLAST LAT ProjectF-to-F, March, 2005 4.1.7 DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 Face-To-Face.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectOct DAQ & FSWV3 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Analysis of cPCI Backplane.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650)
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
EGSE CENTRIC PLAN FOR TWO TOWER TESTS IN ACCORDANCE WITH MEETING HELD 02 MAR 2005 REVISED 22 MAR 2005.
GLAST Large Area Telescope:
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectPDU TRR, July, DAQ & FSWV4 1 GLAST Large Area Telescope: Presented by P. Young SLAC (650)
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face March Meeting Gunther Haller (650) Gamma-ray Large Area Space Telescope

GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 2 TEM/TPS Status & Schedule Status –Two Flight Tower-Electronics Modules/Tower Power Supplies EDAP review last week Both modules delivered to I&T –Qual unit Vibration tested, passed EMI/EMC passed Thermal Vacuum in progress (last test) Issue: after qual unit came back from 2-week Emi testing, one of the current monitoring functions does not function correctly. Wait til end of TV and then find out what is wrong. Probably a contact but tbd. –Balance of 19 TEM/TPS in surface-mount assembly at vendor 4 TEM and TPS pre-coat received 3/14 After test at SLAC, coating at assembler and integration in enclosures Schedule –4/7/05 Third to sixth TEM/TPS deliver to SLAC? –4/17/05 Third/Fourth TEM/TPS deliver to I&T –4/27/05 Fifth/Sixth TEM/TPS deliver to I&T –7/26/05 Last TEM/TPS to I&T TV testing of 19 units –Ordered new vacuum feed-thru to be able to TV two TEM/TPS simultaneously Delivery 3/25/05 –Harness for test in assembly –Designed/Ordered thermal plate to hold 2 Tem/TPS’s Vibration –Designed/ordered fixture to hold 2 TEM/TPS for vibration

GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 3 PDU Status and Schedule Status –Received IR regulator (which has been recalled/replaced) –Assembly started Schedule for proto-flight –End March: unit assembled, pre-coat, ready for test –Mid April: unit fully assembled, ready for environmental test Schedule for Flight Unit –5/15/05 Precoat PDU assembly ready for electrical test –5/30/05 Complete assembly ready for environmental test –7/1/05 Flight PDU to I&T Tester –Designed analog mux card for TV test, fabricated, is in assembly Vacuum feed-thru plate on order, due 3/25 Vibration fixture –Designed, in fabrication

GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 4 GASU Status and Schedule Status –Testing of GEM (Trigger) part to be completed. Documents to be released Drives programming of flight FPGAs FPGA’s not needed until GASU DAQ boards have been reflow assembled –Parts kitting Delay due to man-power shortage in kitting –Flight assembly was to start 3/20/05, delay due to part kitting (1-2 weeks) Schedule for proto-flight –Mid April + 2 weeks: unit assembled, pre-coat, ready for test –End April + 2 weeks: unit fully assembled, ready for environmental test Schedule for Flight Unit –5/20/05 Precoat GASU assembly ready for electrical test –6/10/05 Complete assembly ready for environmental test –7/13/05 Flight GASU to I&T Tester –Tester in design/debug –Designed analog mux card for TV test Lots of harness assembly to be done for these cards –Ordered 450-pin feed-thru for chamber

GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 5 SIU/EPU Status and Schedule Status –All components/parts received except BAE RAD750 CPU Uses recalled International Rectifier regulator Boards to be sent back to BAE Reworked boards expected 3 weeks after they receive components; June 05 –Test assembly of PCI connectors on plug-in board and back-plane at Aeroflex finished, board being sent to GSFC for analysis Schedule –Waiting for solder sample analysis Might have to do iteration –6/1/05 Precoat cCPI boards ready for electrical test –7/28/05 Complete assembly ready for environmental test –8/19/05 First Flight SIU/EPU to I&T –8/24/05 Second flight SIU/EPU to I&T –8/27/05 Third flight SIU/EPU to I&T –8/30/05 Fourth flight SIU/EPU to I&T –9/2/05 Last flight SIU/EPU to I&T Tester –In design

GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 6 Harness Harness on order, priority list with dates on web-page below Hardware/LAT-Harness/lat-harness.htmhttp://www-glast.slac.stanford.edu/Elec_DAQ/DAQ- Hardware/LAT-Harness/lat-harness.htm

GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 7 VSC (Virtual Spacecraft Simulator) System Design for VSC complete All non-custom hardware to be for 4 systems on order –Received two sets of GPS and MIL1553 Need to install antenna on roof, make it work, etc –Balance of two sets first week of April SSR hardware interface module‘s complete/tested SSR software for SSR is working (M. McDougald) TCP/IP connection is working (A. Perazzo) SW for MIL1553 had been done already Scheduling/Qeueing started (M. Huffer) VSC FSW Interface started (S. Maldenado) Debugging of whole system to be done once all pieces are available Schedule is end of March for prototype, driven by FSW interface 2 VSC‘s for FSW in data-flow lab first week of April 2 VSC‘s for I&T to follow

GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 8 Issues Details of TV testing of GASU & PDU AUSTIN EEPROM DPA problems Delivery of Omnirel linear regulator for RAD750 Qualification of cCPI press-fit connector assembly using solder process Delivery issue with GASU PS Zener protection diode for ACD voltage (April delivery, might eliminate the part) Need to work on closing open FPGA review items