Chapter 6 Homework Problems 6, 8, 10, 21. Problem 6.

Slides:



Advertisements
Similar presentations
Control Charts for Variables
Advertisements

Chapter 9A. Process Capability & Statistical Quality Control
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition.
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
ENGM 620: Quality Management Session 8 – 23 October 2012 Control Charts, Part I –Variables.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Statistical Quality Control
Chapter 6 - Part 1 Introduction to SPC.
Agenda Review homework Lecture/discussion Week 10 assignment
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
J0444 OPERATION MANAGEMENT SPC Pert 11 Universitas Bina Nusantara.
1 © The McGraw-Hill Companies, Inc., 2004 Technical Note 7 Process Capability and Statistical Quality Control.
The Quality Improvement Model
Statistical Process Control (SPC)
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Statistical Quality Control
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
Control Charts for Attributes
QUALITY CONTROL AND SPC
INT 506/706: Total Quality Management Lec #6, Process Capability.
SPC – Attribute Control Charts
8/4/2015IENG 486: Statistical Quality & Process Control 1 IENG Lecture 16 P, NP, C, & U Control Charts (Attributes Charts)
X-bar and R Control Charts
Chapter 6 – Part 4 Process Capability.
Statistical Process Control
Statistical Process Control (SPC)
Quality Control.
Operations Management
9/3/2015 IENG 486 Statistical Quality & Process Control 1 IENG Lecture 11 Hypothesis Tests to Control Charts.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Welcome to MM305 Unit 8 Seminar Prof Greg Statistical Quality Control.
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Process Capability and SPC
Statistical Process Control (SPC) Chapter 6. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Capacity, Facilities, & Work Design.
Variables Control Chart Chapter 10. Variables Control Chart Dr. Walter Shewhart ( ) –Father of Statistical Process Control –Inventor of Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
 Review homework Problems: Chapter 5 - 2, 8, 18, 19 and control chart handout  Process capability  Other variable control charts  Week 11 Assignment.
Statistical Process Control Chapter 6, Part 2 Specification Limits The target for a process is the ideal value –Example: if the amount of beverage in a.
Operations Management
T T20-04 C Chart Control Limit Calculations Purpose Allows the analyst to calculate the defectives per unit "C-Chart" 3-sigma control limits.
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Statistical Quality Control
Statistical Process Control Chapter 4. Chapter Outline Foundations of quality control Product launch and quality control activities Quality measures and.
MGS8020 Measure.ppt/Mar 26, 2015/Page 1 Georgia State University - Confidential MGS 8020 Business Intelligence Measure Mar 26, 2015.
Chapter 8. Process and Measurement System Capability Analysis
Lesson 3 Stabilize the Process. Lesson 3 Stabilize the Process.
In the name of Allah,the Most Beneficient, Presented by Nudrat Rehman Roll#
Problem 21 Since the capability index is greater than 1, the process is capable.
Quality Control Chapter 6. Transformation Process Inputs Facilities Equipment Materials Energy Outputs Goods & Services Variation in inputs create variation.
Welcome to MM305 Unit 8 Seminar Prof. Dan Statistical Quality Control.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Technical Note 8 Process Capability and Statistical Quality Control.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Copyright © Cengage Learning. All rights reserved. 16 Quality Control Methods.
OPSM301 Operations Management Spring 2012
Statistics for Managers Using Microsoft Excel 3rd Edition
Agenda Review homework Lecture/discussion Week 10 assignment
What is the point of these sports?
DSQR Training Process Capability & Performance
Chapter 6 Revised Homework Problems 6, 8, 10, 21.
Process Capability.
Presentation transcript:

Chapter 6 Homework Problems 6, 8, 10, 21

Problem 6

X-bar Chart

A special cause occurred on the 3 rd and 4 th samples. Therefore, the X-bar chart is not in control. The process mean is unstable and, consequently, not predictable. Consequently, it is impossible to get a valid estimate of the mean. The operators are responsible for finding and correcting or institutionalizing special causes.

R Chart

The R chart is in control The process variance is therefore stable and predictable. The variance can be estimated as

Fraction Defective Assume that USL = 12.5 ounces and LSL = 11.5 ounces. If the mean was in control and centered on the target of 12 ounces, the fraction defective would be

Fraction Defective

Problem 8 (a)

All the sample fraction defectives fall within the control limits and form a random pattern. The process appears in control. We can therefore estimate the process fraction defective. Our best estimate is the p-bar of.09.

Problem 8 (a) Thus, 9% of the tires produced are defective. Since the process is stable, management action is required to improve the process by reducing the fraction defective. On Day 8, no defective tires were found. Since this point is on the LCL, it should be investigate for a special cause, which may have a favorable impact on the fraction defective.

Problem 8 (b) The sample fraction defective on Day 11 falls above the UCL. The process fraction defective is Therefore out of control. The underlying special cause has an unfavorable affect on the process because it shifted the process fraction defective upward.

Problem 10

c-Chart – Control Limits

Interpretation of Chart The process is in control. Each billing statement contains on average 4.4 errors, which is unacceptably high. Since the process is in control, management action is required to improve the process by reducing the average number of errors.

Problem 21 Since the capability index is greater than 1, the process is capable.

Problem 21 Process fraction defective =.00003, or 3 out of every 100,000 bottles will be out of spec.

Problem 21 The index assumes that the process is on target. However, the process is not on target. Therefore, we should compute C T. z was computed using the NORMSDIST in Excel.. =2*NORMSDIST(G26) 26 G

z NORMSDIST(G26) = Area under curve to left of z Problem 21 USLLSL

Problem 21 Since the capability index is less than 1, the process is not capable. If process is center on target, the capability index would increase to 1.39, and the process would be capable.