10/21/2005 Inst Ana Meeting TKR Noise Flares1 TKR Noise Flares observed in TKR #11 and #8 Mutsumi Sugizaki, Hiro Tajima, and TKR team.

Slides:



Advertisements
Similar presentations
Stats for Engineers Lecture 5
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
1 Background: Use of TKR Trigger One-Shots individual TKR strip channels “true” when analog shaped pulse is above threshold. strips in a plane are OR’d.
Tony Smith LHCb Velo Hybrid Meeting CERN 29/07/04 1 VELO HYBRID STATUS CONSTRUCTION of composite SUBSTRATE – best flatness obtained with TPG central core.
Far Detector Data Quality Andy Blake Cambridge University.
GLAST LAT Project Instrument Analysis Meeting– May 27, 2005 Hiro Tajima, TKR Bad Strips 1 GLAST Large Area Telescope: TKR Bad strips analysis update Hiro.
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
Comparing ZS to VR David Stuart, UC Santa Barbara June 19, 2007.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectI&T Meeting – Feb 12, 2003 W. Focke 1 EM timing analysis Warren Focke February 12, 2004.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
IA meeting, Feb. 3, 2006 Mutsumi Sugizaki TKR Noise Stdudy 1 LAT TKR Noise Study Current Status Mutusmi Sugizaki (and short comment about TOT=255 event)
9/23/2005 Inst. Ana. MeetingTKR trigger efficiency with ACD&CAL 1 Study of TKR trigger efficiency with ACD and CAL Mutsumi Sugizaki, Hiro Tajima SLAC.
SVACInstrument Analysis Meeting, September 23, 2005 Anders W. Borgland 1 GEM Discarded Events Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project Instrument Analysis Meeting– Dec 9, 2005 Takuya Kawamoto, TKR Noisy Strip determination 1 Noisy Strip determination Takuya Kawamoto (Hiroshima.
Identifying anomalous strips David Stuart, Noah Rubinstein University of California, Santa Barbara June 18,
An offline look at TIF data David Stuart UC Santa Barbara May 2, 2007.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
Section 9.3 Sample Means.
1 Reading Report 9 Yin Chen 29 Mar 2004 Reference: Multivariate Resource Performance Forecasting in the Network Weather Service, Martin Swany and Rich.
MTCC –II & HCAL noise chasing Mandakini Patil India-CMS meeting Jan07 Shantiniketan.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Chapter 7 Hypothesis testing. §7.1 The basic concepts of hypothesis testing  1 An example Example 7.1 We selected 20 newborns randomly from a region.
Sampling distributions BPS chapter 11 © 2006 W. H. Freeman and Company.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: On-Orbit Calibration and.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
1 BFEM Trigger Diagnostics Mar 12, 2002 Tsunefumi Mizuno Note: For reference, this document includes some works already reported (pages 2-5 and 7). The.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
April 29th, Chapter 6 Decision Making 6.1 The Nature of Management decisions 6.1 The Nature of Management decisions 6.2The decision making process.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
Anatoli Romaniouk TRT Test manual Some important information p. 2-3Some important information p. 2-3 Noise studies p.4-7Noise studies p.4-7 Operation with.
GLAST LAT Project LAT Instrument Analysis Meeting – June 30, 2006 Hiro Tajima, TKR Efficiency Trending, NRL 1 GLAST Large Area Telescope: TKR.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
Update on the CNI polarimeter results for Run02 1.Bunch-by-bunch polarization study 2.Profiles of 0-pol bunches Osamu Jinnouchi.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
Noise results from SR1 combined SCT barrel tests Summary of some initial results Alan Barr, UCL Pepe Bernabeu, Valencia.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
Silvia Costantini RPC General Meeting CMS week 15 June 2010.
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Mini-Tower test results
GLAST LAT tracker signal simulation and trigger timing study
Noise analysis of the 1m3 DHCal test beam
Downlink rates The next slide was presented to Jonathans’ flux review
GLAST Large Area Telescope:
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Overview Goal Study GEM variables in SVAC ntuple
Mini Tower Preliminary Results
GLAST Large Area Telescope:
Studies of the Time over Threshold
Presentation transcript:

10/21/2005 Inst Ana Meeting TKR Noise Flares1 TKR Noise Flares observed in TKR #11 and #8 Mutsumi Sugizaki, Hiro Tajima, and TKR team

10/21/2005 Inst Ana Meeting TKR Noise Flares2 Noise flares observed in TKR #11 Test of noise occupancy monitor for TKR #11 in the acceptance test at SLAC X11X16 Y10 ~ 2 hours  The strip occupancy occasionally exceeds10 -4 in the layer average during some short terms (~10 min).  These noise flares do not always appear. It is rather rare.  The noise flares appeared only in these three layers on TKR #11.  The flares were not synchronized layer- to-layer.

10/21/2005 Inst Ana Meeting TKR Noise Flares3 Strip profile of noise flares in TKR#11 X16X11 Y10 Single strip flare. It can be disabled by data and trigger masks. >> Solved. Multi-strip noise flare? It looks very strange. Noisy strips are gathering on the layer edge.

10/21/2005 Inst Ana Meeting TKR Noise Flares4 Noise flares observed in TKR #8 The next noise flare was found during noise occupancy monitor for TKR #8 in the TKR acceptance test at SLAC Time profile Strip profile Ladder edge Questions  How can these multi-strip noise flare occur?  Does it have a serious impact on the LAT performance?  Flare strips seem to be confined by ladder boundary. Is it true?  Are they also bunched by front-end chip (64 channels)?  Why did it appear only in TKR #11 and #8? TKR #8 Y0

10/21/2005 Inst Ana Meeting TKR Noise Flares5 Strip multiplicity of noise flare TKR#11 X11 TKR#11 Y10 TKR #8 Y0 Reference: normal layer GTRC event buffer overflow  In the layers with noise flares, large-multiplicity events are increased.  The gathering of the noisy strips on the layer edge can be explained by the GTRC event-buffer overflow.

10/21/2005 Inst Ana Meeting TKR Noise Flares6 Event selection with multiplicity TKR #8 Y0 Ladder edge Time profileStrip profile TOT distribution  Selection condition: (20<=Multiplicity<64)  The noise flare can be mostly explained by these large-multiplicity events.  TOTs of the noise flare events are longer than a few  s us

10/21/2005 Inst Ana Meeting TKR Noise Flares7 Layer (trigger) occupancy of noise flares TKR#11 X11TKR#11 Y0 TKR #8 Y0  Layer Occupancy is < 0.1, which corresponds to the single-layer trigger rate < 50 kHz. (0.1/2  s=50 kHz in the worst case). This still meets trigger specification at GTRC OR_STRECH=31.  The relation between strip and layer occupancies in noise flare can be explained by the large hit-strip multiplicity.

10/21/2005 Inst Ana Meeting TKR Noise Flares8 Other info. we have known about the noise flare According to the TKR group in Italy, similar noise flares were observed in Towers A, #1, #4, #7, #8, #11, too, during the TVAC test (L. Latronico NCR/FM/INFN/PI-592). They were considered to be due to pickup of external noise because it seemed to be synchronized with the time of the temperature change. The bias-voltage dependence of the noise flares is not clear, so far. If it is caused by discharge on the detector, it should have some bias-voltage dependence. I personally think that we cannot abandon the scenario of pickup of external noise because we could not find any noise flare from the data taken on last Sunday.

10/21/2005 Inst Ana Meeting TKR Noise Flares9 Summary Current understanding about the noise flare –Impact on the LAT performance is small. Frequency is very low. Single layer trigger rate still meets the requirement even during the intense noise flare. The effect on the TKR 6-in-a-row trigger is negligible. –We did not know the root cause. Analysis tools to monitor flare activities during normal data taking are under development. We plan to involve them in the regular data processing. TKR #8 is supposed to go to a beam-test tower. We are thinking more tests using TKR #8 to reveal the root cause.