SPEEDNET OPERATIONS. Speednet Application Login Supervisor’s Role at the beginning Supervisor to login in Speed Net software – Perform the Day begin.

Slides:



Advertisements
Similar presentations
System Developed By Srijan Software Services, Dehradun Are you associated with Multiple Companies ? Are you facing problems ? Service industry is the largest.
Advertisements

UIDAI article processing
Sales Tracker Strong Pos system with Electronic Device Develop By :
Remotely managed Franking System
Despatch of Accountable Articles – letter mail
PROCESS FLOW IN REGISTRATION DEPARTMENT Presentation
Easy to use Ability to attach policies/procedures to call types Ability to schedule calls in advance Officer safety alerts Robust search capabilities.
 Mail offices are of two kinds.  They are  -Sorting Mail offices  -Transit Mail offices  A sorting mail office situated in a railway station is called.
Setting up an E-XL A Step by Step Tutorial Engineering Consultants Group, Inc.
 Change report date  Change sort  change selection……….  Modify, modify, modify.
PROCESS FRAMEWORK Lecture - 3. Topics covered PROCESS FRAMEWORK PROCESS MODELS DIFFERENCE.
MAIL NETWORK OPTIMISATION PROJECT
MAIL NETWORK OPTIMISATION PROJECT
Module 2 Routine operations in Speednet Module objective At the end of the module, you will be able to – Manage routine operations in Speednet.
PROCESS FLOW IN NATIONAL SORTING HUB & INTRA CIRCLE HUB
ADDING AND MANAGING USERS. Addresses Every user account must have an address The address is used by NHS Jobs to communicate with the user.
Guidelines for Inspection of Computerized Offices.
Investigation in Computerised Environment. Causes for fraud in computerised environment Lack of technical knowledge at supervisory level Improper exercise.
Despatch of Speed Post articles.
Steps for Registration of an Existing SEZ Unit 1.For Submission of Unit Registration request 1.Creation of a User IDCreation of a User ID 2.Filling up.
PROCESS FLOW IN PARCEL HUB or PARCEL DEPARTMENT
Module 3 Troubleshooting and Security in Speednet
SPEED POST Salient Features Time bound & guaranteed delivery Documents can be sent Started in August 1986 POD Facility Types – Domestic – International.
Types of Mail Offices.
Priority Mobile Solutions – Stepping away from the keyboard... eMerge offers a range of mobile solutions to meet the different connectivity requirements.
WHAT IF THINGS GO WRONG IN PARCEL DEPARTMENT?. Missent Parcel mail articles Enter “Article received missent” against the entry in the Parcel List Stamp.
Role of manager SPC. Role of manager Understand the demography – Study the profile of walk in customers and their share of turnover over a few months.
HORIZONT 1 ProcMan ® The Handover Process Manager Product Presentation HORIZONT Software for Datacenters Garmischer Str. 8 D München Tel ++49(0)89.
Monitoring of Mails through Performance Tool (Speed Post, Regd
Mail Network Optimization Project
Supporting Customized Archival Practices Using the Producer-Archive Workflow Network (PAWN) Mike Smorul, Mike McGann, Joseph JaJa.
Presentation on Review of the MIS for various Services and effective use of the Tools 14/02/2014.
Qwik Start Tutorial MEDT_7478_Automation of the Media Center (Section 4 : Reports and Utilities) For Dr. Snipes By Has Slone.
| India Post0 Improving operational efficiency for Speed Post SOURCE: Mail Network Optimisation Project Processes at Booking POs/ MBCs/BNPL Centers Network.
ManageEngine ADAudit Plus A detailed walkthrough.
Module 16: Software Maintenance Using Windows Server Update Services.
EPayment ePayment Introduction It is the process of electronic transfer of bill data between booking and payment office Department of Post collects.
Mail Monitoring. Essentials – Availability of plan of actions or a norm – Comparing actual performance with planned course of action / norm – Identification.
1 SOFTWARE TROUBLESHOOTING. 2 SOFTWARE TROUBLE SHOOTING. POINT OF SALE S. no. PROBLEMSREMEDY 1When the Point of sale is started, it shows error “ERROR.
Guidelines for Investigation. 2 Investigation of computer related frauds - Outline Reasons Ways of committing frauds Prevention Aids for investigation.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
1 CMNO Feb Change …Make it right … Make it easy … Make it stick Scan to Vehicle Operations Engagement Insert Site Name CMNO Feb Not for Distribution.
AQS Web Quick Reference Guide Changing Raw Data Values Using Maintenance 1. From Main Menu, click Maintenance, Sample Values, Raw Data 2. Enter monitor.
Inspection of Computerized Offices. Objectives Correctness of implementation Effectiveness of computerized operations Preventive vigilance.
 Speed bags should be sent to NSH.  89 National Sorting hubs are functioning.  Intra circle hubs are formed to cater the needs.  Sorting Hubs.
India Post India Post's products and services will be the customer's first choice.
Installation and configuration of Speednet in SPC
Orchard, Let’s Get Started Teachers! Reading Language Arts Math In 5 Easy Steps!
Comprehensive Training for Distributor on DCMS Windows Application
Task Management: Is it for ME? How some people manage to be so organized!!! Fed up managing stuffs with repetitive work schedules??? Your team lost tracks.
Quick Start Guide: Administrator Basics Learn about: 1.Adding users to the LOAMS system 2.How to modify or delete existing users 3.How to reset passwords.
Manufacturing Solutions- Yarn Dyeing TexManage. Yarn Dyeing Solutions Solution Arrangement Data Collection Production Planning Barcode Application Despatch.
Workshop on Speed Post – Cash on Delivery Scheme 29/08/20121CEPT Mysore.
Planning an Installation and d Upgrade. Learning Objectives  To learn how to plan an upgrade and installation.
ECDL. Word processing Work with documents and save them in different file formats Choose built-in options such as the Help function to enhance productivity.
Welcome to State of Michigan Time & Expense Processing Employee Expense Modification (No Advance) Tutorial Brought to you by the Office of Financial Management.
Administrator Data Entry Training for Maintenance (Mx) LOSA and Ramp LOSA Database Software 11/26/2016.
Developed by 360 Technologies Pvt Ltd. To develop a clear understanding of proposed system and to achieve a coherent and common consent on application.
Developed by 360 Technologies Pvt Ltd. EMTTS(Express Mail Track and Trace System) is an application of Pakistan Post aimed to -Assist bookings. -Delivery.
Purpose of the Project Maintains the flow of the money released by the state government of a particular financial year Because of this, a common citizen.
Welcome to Proposed PAN Online Process by UTIITSL
USING ELECTRONIC MEDICAL RECORDS UNDERSTANDING ELECTRONIC PRACTICE WORKFLOW.
MRTDA Address Overview The Master Reference Table (MRT) Data Administration (DA) is an Farm Service Agency (FSA) application that provides a means for.
Welcome to Proposed PAN Online Process by UTIITSL
MIS of Haryana Power Utilities
Web Plus Version 2: Secure Web-based Functions For Death Certificate and Pathology Lab Follow-back Efforts Kathleen Thoburn, Sanjeev Baral (CDC/NPCR.
BiMS (Bill Information And Management System)
User Manual Financial Accounting
Genesys Pre-counting and Counting Applications For elections
A Presentation on Operation of Software for Rationalization of Parts Chief Electoral Officer, Rajasthan 1.
Presentation transcript:

SPEEDNET OPERATIONS

Speednet Application Login

Supervisor’s Role at the beginning Supervisor to login in Speed Net software – Perform the Day begin – Allocate the job among SAs / MTS. He would assign the work – Among SAs for mail agency / bag receipt desk, bag opening desk, sorting, bag closing desk and bag despatch desk. – among MTS officials also.

Role of Supervisor

Creation of User

Creation of Designation

Duty Allocation Duties can be allotted by the Supervisor to each designation – For example, if a Sorting Asst. is allotted with the work of only bag receipt and bag opening work, it can be done so that he can not other operations like bag closing, bag despatching etc.

Role of Supervisor See the picture Receipt of bags, Opening of Bags & TBs are hidden This Operator (SPEEDSA) can not do these activities

Allocation of Duties

Speed Post Processing Layout Prescribed

Adapted Process Lay out in NSH / ICH

Login & Receive the bags in the software Receipt of Speed TBs & Bags Scan the bag barcode here

Configuration of Receipt Schedules

Configuration of Despatch Schedules

Opening of SP Transit Bags Scan the bag barcode (TB Contents) here Scan the bag barcode (TB ) here

Opening of Speed Bags Scan the bag barcode here Scan the article barcode here

Modification of Bag Details After opening of SPTB / Bag, −If any bags’ source office and destination office require to be changed, it can be done. −But bag number can not be changed.

Modification of Bag Details

Modification of Speed Articles After opening of Speed Bag, −If any article type is required to be modified or it any article is to be added or deleted, it can be done.

Deletion of Speed Article

After sorting is completed at Sorting desk, work at bag closing desk start Close the bags by scanning each and every article Process at Bag Closing Desk

Closing of Speed Post bags Scan the articles barcode here Scan the bag barcode here

Circle wise allocation of Barcode SLName of the CircleBar code allotted 1 A.P.EBN 2 AssamEBS 3 APSEBE BiharEBF 5 ChhattisgarhEBC 6 DelhiEBD 7 GujaratEBG 8 HaryanaEBH 9 Himachal PradeshEBE Jammu & KashmirEBE JharkhandEBJ For Speed Bags

Circle wise allocation of Barcode SLName of the CircleBar code allotted 12 KarnatakaEBK 13 KeralaEBL 14 MaharashtraEBM 15 Madhya PradeshEBI 16 North EastEBE OrissaEBO 18 PunjabEBP 19 RajasthanEBR 20 Tamil NaduEBT 21 UttarakhandEBV 22 Uttar PradeshEBU 23 West BengalEBW For Speed Bags

Modification of Articles sent Before despatching of a speed bag, −If any article needs to be added or deleted, it can be done, but not after despatch of bag is done.

Modification of Articles sent

Deletion of Articles sent

Cancellation of Bags Closed Before despatching of a speed bag, −If the speed bag is closed to a wrong office, it needs to be cancelled. This can be done.

Cancellation of Bags Closed

Bag Despatch Desk – Closing SP TB Scan the bag barcode here

Bag Despatch Desk – Despatch of SP Bags & SP TBs Scan the bag barcode here if not feteched

Modification of Bags sent After despatching of speed bag, −If any bag needs to be added or deleted, it can be done, but w.r.t. SPTB, it can not be done −Revised Mail List is generated.

Addition of Bags sent

Finally Shift End by all the operators Printing of Various Reports Speed Abstract Article & Bag Abstract User wise / Set wise/ Office as a whole Bag Abstract Discrepancy Report if any

Reports

Speed Post Manifest

SP TB List

Speed Post Mail List

Speed Abstract – User wise

Speed Bag Abstract Click Here to view the Speed Bag Abstract

Speed Post Discrepancy Report

Speed Net – Log Entries Click Here to view the Log Entries

Shift / Daily Report of Supervisor – Manual Preparation

Responsibilities Entire set / shift (SAs & MTS Officials) would be collectively responsible for any unexplained variation in the abstract It would be collective responsibility of the entire set / shift for the safety of speed post articles Each official is responsible for safety, security and cleanliness of the hardware & equipments used by them. In case of any technical issues, seek the help of System Administrator Run the Speednet communication at regular intervals

Exercise 4.1 Exercise 4.1 Exercise