Submission doc.: IEEE 802.11-14/0623r1 May 2015 Guido R. Hiertz, Ericsson et al.Slide 1 TGax simulation scenario “Box 5” – calibration results Date: 2015-05-11.

Slides:



Advertisements
Similar presentations
Submission doc.: IEEE /1214r1 September 2014 Leif Wilhelmsson, Ericsson ABSlide 1 Impact of correlated shadowing in ax system evaluations.
Advertisements

Submission doc.: IEEE 11-14/1426r1 November 2014 Gustav Wikström et al., EricssonSlide 1 DSC and legacy coexistence Date: Authors:
Doc.: IEEE /0116r1 SubmissionYakun Sun, et. al. (Marvell)Slide 1 Long-Term SINR Calibration for System Simulation Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE /1225r1 Considerations on CCA for OBSS Opearation in ax Date: Slide 1Huawei Authors:
Doc.: IEEE /0543r0 Submission May 2015 TG ax Scenarios Proposed additions for frequency re-use Date: Authors: Graham Smith, SR TechnologiesSlide.
Submission doc.: IEEE 11-15/613r0 May 2015 Chinghwa Yu et al, MediaTek Inc.Slide 1 Box 5 Calibration Result Date: Authors:
Doc.: IEEE /568r0 Submission Frequency Selective Scheduling (FSS) for TGax OFDMA May 2015 Slide 1 Date: Authors: Kome Oteri (InterDigital)
Submission doc.: IEEE 11-14/1162r1 September 2014 Eric Wong et al (Apple)Slide 1 Energy Efficiency Evaluation Methodology Follow Up Date: Authors:
Doc.: IEEE /0861r0 SubmissionSayantan Choudhury Impact of CCA adaptation on spatial reuse in dense residential scenario Date: Authors:
Doc.: IEEE /854r0 Submission July 2014 W.Carney, Y.Morioka, M.Mori, et.al. (SONY)Slide 1 DSC and Legacy Coexistence Date: 14/07/2014 Authors:
Doc.: IEEE /1207r1 Submission Imad Jamil (Orange)Slide 1 OBSS reuse mechanism which preserves fairness Date: Authors: September 2014.
Submission doc.: IEEE /0085r1 Jan 2015 John Son, WILUS InstituteSlide 1 Legacy Fairness Issues of Enhanced CCA Date: Authors:
Doc.: IEEE /1420r1Nov 2014 Submission Po-Kai Huang (Intel) Slide 1 The Impact of Preamble Error on MAC System Performance Date: NameAffiliationsAddressPhone .
Doc.: IEEE /1227r3 SubmissionSlide 1 OFDMA Performance Analysis Date: Authors: Tianyu Wu etc. MediaTek Sept 2014 NameAffiliationsAddressPhone .
Submission doc.: IEEE /1452r0 November 2014 Leif Wilhelmsson, EricssonSlide 1 Frequency selective scheduling in OFDMA Date: Authors:
Doc.: IEEE /0046r0 Submission January 2015 Eisuke Sakai, Sony CorporationSlide 1 11aa GCR-BA Performance in OBSS Date: 2015/01/12 Authors:
Submission doc.: IEEE /870r2 July 2015 Guido R. Hiertz et al., EricssonSlide ax in 2.4 GHz Date: Authors:
Doc.: IEEE /0116r0 SubmissionYakun Sun, et. Al.Slide 1 Long-Term SINR Calibration for System Simulation Date: Authors: NameAffiliationsAddressPhone .
Submission doc.: IEEE /0789r0 July 2015 Allan Jones, ActivisionSlide 1 Proposed changes to Evaluation Methodologies Date: ?? Authors:
Submission doc.: IEEE /0612r0 May 2014 Jiyong Pang, et. al. HuaweiSlide 1 Calibration Procedures towards Integrated System Level Simulation Date:
Submission doc.: IEEE /1013r0 September 2015 Guido R. Hiertz et al., EricssonSlide ae & ax Date: Authors:
Submission doc.: IEEE /0868r0 July 2015 Hakan Persson, Ericsson ABSlide 1 Impact of Frequency Selective Scheduling Feedback for OFDMA Date:
Doc.: IEEE /1081r0 SubmissionSayantan Choudhury HEW Simulation Methodology Date: Sep 16, 2013 Authors: Slide 1.
Doc.: ax Submission Sept 2014 Slide 1 Effect of CCA in residential scenario part 2 Date: Authors:
Doc.: IEEE /342r0 Submission March 2014 Naveen Kakani, CSRSlide 1 Short Packet Optimizations Date: Authors:
Doc.:IEEE /0536r0 Submission May 11th, 2009 Slide 1 OBSS issue in ac Authors: Date:
Doc.: IEEE /0804r0 Submission July 2015 TG ax Outdoor Enterprise Scenario and DSC Date: Authors: Graham Smith, SR TechnologiesSlide 1.
Doc.: ax Submission July 2014 Slide 1 Proposed Calibration For MAC simulator Date: Authors:
Doc.: IEEE /1207r0 Submission Imad Jamil (Orange)Slide 1 OBSS reuse mechanism which preserves fairness Date: Authors: September 2014.
Doc.: IEEE /0523r0 Submission April 2014 Imad Jamil (Orange)Slide 1 MAC simulation results for Dynamic sensitivity control (DSC - CCA adaptation)
Doc.: IEEE /610r1 Submission Vida Ferdowsi, Newracom May 2015 Slide 1 NameAffiliationsAddressPhone Vida Ferdowsi Daewon Lee Reza Hedayat.
Submission doc.: IEEE /0372r2 Slide 1 System Level Simulations on Increased Spatial Reuse Date: Authors: Jinjing Jiang(Marvell) March.
Submission doc.: IEEE /1081r3 September, 2015 Jing Ma, NICTSlide 1 Further consideration on receive behavior based on the cascading structure.
Doc.: IEEE /0680r1 SubmissionJiyong Pang, Huawei TechnologiesSlide 1 Reference Box5 Calibration Assumptions and Parameters Date: Authors:
Doc.: IEEE /0814r0 Submission July 2015 Simulation Results for Box5 Calibration Ke Yao, et, al. (ZTE) Slide 1 Date: Authors: NameAffiliationAddress .
Doc.: IEEE /0307r0 Submission January 2014 Nihar Jindal, Broadcom PHY Calibration Results Date: Authors: Slide 1.
Discussion on ax functional requirements
Doc.: IEEE / ax Submission M. Shahwaiz Afaqui DSC calibration results with NS-3 Authors: Nov
Doc.: IEEE /1122r0 Submission Identifiers in HE PPDUs for power saving Slide 1 Date: Authors: Alfred Asterjadhi, et. al. September.
Submission doc.: IEEE 11-15/0592r0 May 2015 Eric Wong (Apple)Slide 1 More Power Save Calibration Results Date: Authors:
Submission doc.: IEEE /1214r0 September 2014 Leif Wilhelmsson, Ericsson ABSlide 1 Impact of correlated shadowing in ax system evaluations.
Submission doc.: IEEE /1314r2 November 2015 Interdigital CommunicationsSlide 1 I/Q Imbalance Impact to TGax OFDMA Uplink Reception Date:
Submission doc.: IEEE /1373r1 November 2015 Narendar Madhavan, ToshibaSlide 1 Updated Box 5 Calibration Results Date: Authors:
Doc.: IEEE / Submission March 2013 Juho Pirskanen, Renesas Mobile CorporationSlide 1 Discussion On Basic Technical Aspects for HEW Date:
Doc.: IEEE /0212r3 Submission Feb 2016 TG ax Enterprise Scenario, Color and DSC Date: Authors: Graham Smith, SR TechnologiesSlide 1.
Doc.: IEEE /1392r5 SubmissionSuhwook Kim, LG ElectronicsSlide 1 Simulation results for Box 5 calibration Date: Authors: NameAffiliationsAddressPhone .
Doc.: IEEE /1226r0 Submission Sep 2014 Slide 1 SLS Box 1&2 Calibration Results Date: Authors: Russell Huang (MediaTek)
Doc.: IEEE /0161r1 Submission doc.: IEEE /1032r0 Slide 1 Simulation Scenario for OBSS in Home Network Date: Authors: September.
Submission doc.: IEEE /1359r0 November 2015 Yu Wang, Ericsson et al.Slide 1 System Performance Evaluation of ae Date: Authors:
Submission doc.: IEEE /0871r1 Jul Jiyong Pang, et. al. Huawei Further Calibration Results towards Integrated System Level Simulation Date:
Submission doc.: IEEE /0331r1 March 2016 Kome Oteri (InterDigital)Slide 1 Power Control for Multi-User Transmission in ax Date:
Submission doc.: IEEE 11-14/1161r0 September 2014 Eric Wong et al (Apple)Slide 1 Parameters for Power Save Mechanisms Date: Authors:
Simulation results for spatial reuse in 11ax
PHY Abstraction for MU-MIMO in TGac
TGax SLS MAC Calibration Test 4 Results
Summary of Power Save Calibration Results
Simulation Results for Box5
Simulation Results of Box5
Updated Simulation Results for Box5
Simulation Results for Box5
Simulation Results for Box5
Box5 Calibration Results
Box5 Results of 11ac SS6 Date: Authors: Jan 2015 Sept 2014
Box 5 Calibration Result
OFDMA Performance Analysis
Results for SS6 calibration case for single BSS and OBSS
Box 5 results for Single BSS Calibration Case
DSC Calibration Result
Consideration on System Level Simulation
Measurements for Distributed-MU-MIMO
Presentation transcript:

Submission doc.: IEEE /0623r1 May 2015 Guido R. Hiertz, Ericsson et al.Slide 1 TGax simulation scenario “Box 5” – calibration results Date: Authors:

Submission doc.: IEEE /0623r1 May 2015 Guido R. Hiertz, Ericsson et al.Slide 2 Abstract This submission presents our results of the TGax “Box 5” [1] simulation tool calibration test. We follow [2] and simulate scenario 6 (“Enterprise Network with OBSS”) of [3]. As with previous studies [4] the results reveal that our simulation tool behaves equal to other tools.

Submission doc.: IEEE /0623r1 Standalone operation of BSS B – Downlink traffic per STA in Mb/s Slide 3Guido R. Hiertz, Ericsson et al. May 2015

Submission doc.: IEEE /0623r1 Standalone operation of BSS B – Uplink traffic per STA in Mb/s Slide 4Guido R. Hiertz, Ericsson et al. May 2015

Submission doc.: IEEE /0623r1 Simultaneous operation of all three BSSs – Downlink only traffic results Throughput (Mb/s): BSS A: 84.3 BSS B: BSS C: Total: BSS A (STAs 1, 2, 4, 5, 7, 8, 10, 11, 13, 14, 16, 17, 19, 20, 25, 26, 28, 29) BSS B (STAs 3, 9,15, 27) BSS C (STAs 6, 12,18, 30) May 2015 Guido R. Hiertz, Ericsson et al.Slide 5

Submission doc.: IEEE /0623r1 Throughput (Mb/s) EricssonZTEHUAWEILGEMARVELL BSS A BSS B BSS C Total Simultaneous operation of all three BSSs – Downlink only traffic results comparison Slide 6Guido R. Hiertz, Ericsson et al. May 2015

Submission doc.: IEEE /0623r1 Simultaneous operation of all three BSSs – Uplink only traffic results Throughput (Mb/s): BSS A: 80.9 BSS B: BSS C: Total: May 2015 Guido R. Hiertz, Ericsson et al.Slide 7 BSS A (STAs 1, 2, 4, 5, 7, 8, 10, 11, 13, 14, 16, 17, 19, 20, 25, 26, 28, 29) BSS B (STAs 3, 9,15, 27) BSS C (STAs 6, 12,18, 30)

Submission doc.: IEEE /0623r1 Throughput (Mb/s) EricssonZTEHUAWEILGEMARVELL BSS A BSS B BSS C Total Simultaneous operation of all three BSSs – Uplink only traffic results comparison Slide 8Guido R. Hiertz, Ericsson et al. May 2015

Submission doc.: IEEE /0623r1 Simultaneous up- & downlink operation of all three BSSs – Throughput in Mb/s BSS A: 51.9 DL: 2.0, UL: 49.9 BSS C: DL: 28.3, UL: Total: DL: 70.7, UL: BSS B: DL: 40.4, UL: May 2015 Guido R. Hiertz, Ericsson et al.Slide 9

Submission doc.: IEEE /0623r1 Throughput (Mb/s) EricssonZTEHUAWEILGE BSS A BSS B BSS C Total Simultaneous up- & downlink operation of all three BSSs – Comparison Slide 10Guido R. Hiertz, Ericsson et al. May 2015

Submission doc.: IEEE /0623r1 Observations Simulation results similar to other submissions Little distance variation leads to limited pathloss variation in BSS B Right table shows SNR in UL direction per STA 5 dB higher SNR in DL because of higher output power of AP Fixed Modulation and Coding Scheme selection as required by “Box 5” test results in equal throughput distribution in BSS A BSSSTA index SNR, UL (dB) A 142,88 232,21 440,22 537,28 732,76 842, , , , , , , , , , , , , , ,35 B 330,02 932, , , ,47 C 631, , , , ,24 May 2015 Guido R. Hiertz, Ericsson et al.Slide 11

Submission doc.: IEEE /0623r1May 2015 Guido R. Hiertz, Ericsson et al.Slide 12 References 1.R. Porat et al., “11ax Evaluation Methodology,” /0571r8 2.J. Pang et al., “Discussion about Box5 Calibration,” 11-14/1177r2 3.P. Loc et al., “TGac Functional Requirements and Evaluation Methodology,” 11-09/00451r16 4.Y. Li, “MAC calibration results comparison,” /1192r6 5.S. Merlin et al., “TGax Simulation Scenarios,” /0980r10