Utility Metering – Saving Energy Dollars and Meeting the Requirements for LEED v4 William Broome – CFM, SFP, LEED GA Brandi Williams – LEED BD+C, FMP,

Slides:



Advertisements
Similar presentations
Facilities Management Utilities & Engineering Services Duke CHWP-2 RECLAIM WATER DU-107-PP.
Advertisements

Preparing for a Water Audit Thomas Pape Technical Advisor, AWE Principal, BMP
Energy Savings Opportunities in Controls, Lighting, Air Conditioning, Water Heating and Refrigeration Chuck Thomas, P.E. CEM Lead Engineer.
LEED Gold Woodward Academy Math-Science Building Leadership in Energy and Environmental Design.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Reclaimed Water and Non-Potable Water at UNC-CH
LEED CERTIFICATION IN THE RETAIL ENVIRONMENT Maggie Benson and Isabelle Bouthillier Project By:
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
SUSTAINABILITY ANALYSIS OF RESIDENTIAL BUILDINGS Ashok Kumar Abhilash Vijayan Department of Civil Engineering.
Water Conservation at UCSF 20% by % BY 2020 UCOP Mandate Baseline Consumption Data and Goals Where We’re At Where Does the Water Go? What We’re.
Whatever the nature of your business, often simple changes in behaviour or processes can save water and reduce your water bill. These water savings can.
Performance Contracting The Honeywell One Source Solution.
WELCOME LEEDv4 Lunch & Learn IN THE DEEP END A Detailed Look at Water Efficiency in LEED v4 Approved for 1.5 LEED Specific CE Hours.
SAINT PAUL SUSTAINABLE BUILDING POLICY Saint Paul Sustainable Building Policy Training Module Four Indoor and Outdoor Water Use.
2 Approved by the Board of Regents in 2006 to support rising energy prices due to double digit increases in utility rates and in lieu of an increase in.
Chancellor’s Office Update CCC Chancellor’s Office July 2015 Susan Yeager.
CATEE PRESENTATION– DECEMBER 18, 2013 DIANA D. GLAWE, PHD, PE, LEED AP ENGINEERING SCIENCE DEPARTMENT COLLECTING & USING CONDENSATE ON SITE.
Prepared for Enterprise Community Partners. Enterprise Community Partners | 2GREEN & HEALTHY LIVING: Water Conservation What Uses The Most Water? Faucets,
Kendal at Longwood Cottages Expansion Project Sustainable Development & LEED Certification.
Energy Management 101 Lance Stewart Facilities Maintenance Manager/Energy Manager City of Charlottesville, Virginia.
CSU Channel Islands Reclaimed Water use in Central Plant Jose Chanes Associate Director of Infrastructure and Energy Facilities Services.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
INCREASING WATER EFFICIENCY 4. In This Chapter > The real estate manager’s role > Setting a baseline > Identifying issues > Bathrooms and kitchens > HVAC.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
ENERGY AND CARBON REDUCTION PLAN May 21, Initial Site Evaluation Initial site energy benchmark was performed in 2006 using the US Department of.
41 th Annual Conference and Technology Exhibition July 25-29, 2004.
Leveraging an Energy Plan Managing Energy to Reduce Operating Cost and Improve Building Valuation.
The Monsanto Center LEED EB: Operations & Maintenance Silver Certification.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
California Urban Water Conservation Council March 1,
Phoenix Convention Center Phoenix, Arizona Getting Results From Your Energy Projects Session 3Greening the Federal Government Jim Bochat Commissioning.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
Green Plumbing Codes and Standards Panel ASHRAE Standard for the Design of High Performance Buildings Except Low Rise Residential Buildings ASHRAE.
*Green City “Briefing” presentation to the City Council Summer 2008 GCGC GCGC * Project Location is confidential.
SUSTAINABLE FLORIDA TECH Presented by the Green Campus Group.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Steve Horseman – Grainger Industrial Supply, District Sales Manager for the State of Kansas The Four Corners of Sustainability.
Water Efficiency. 1.Sustainable Sites 2.Water Efficiency Goals / Overview LEED NC Prerequisites & Credits Intent & Strategies LEED EB O&M Credits Intent.
Phoenix Convention Center Phoenix, Arizona Federal Water Efficiency Sustainability TrackWater Efficient Operations Kate McMordie Stoughton Pacific Northwest.
Monterey Model: Strategies for an Efficient Public-Public Partnership Case Studies toward Success George Helms General Services Superintendent.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
LADWP WATER CONSERVATION IEPR Workshop August
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Cal Poly San Luis Obispo Water Conservation Best Practices UC/CSU/CCC Sustainability Conference UCSB June 24-27, 2007 Presented by Dennis K. Elliot, PE.
Fundamentals of LEED v4 for
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Week 9 Common Commercial Building energy efficiency measures (Energy Management Opportunities)
Chapter : 4 Water Efficiency 1 © 2015 Green Building Academy. All rights reserved.
Chapter 8 - Integrative Process
Dan Burgoyne Department of General Services August 28, 2015.
Integrative Process Lori A. Brown, LEED AP BD+C – Power Jam Study!Lorisweb.com1.
ENERGY EFFICIENCY & SUSTAINABILITY IN NEW SCHOOL CONSTRUCTION August 10, 2006 SFB STUDY SESSION.
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
Palo Alto Utilities Key Account Rebate Programs Facilities Managers Meeting January 17, 2013 SAP.
HOUSEHOLD WATER CONSERVATION. Low-Yielding Wells Well yield Maximum rate (GPM) that a well can be pumped without lowering the water level in the borehole.
Water Audits and Best Management Practice Life Cycle Cost Analyses for Army Medical and Health Care Facilities Presented By: Lisa Raysby Hardcastle, P.E.
Fighting Fire with Fire: Fort Bragg Goes Platinum with a new LEED Fire Station Kim M. Fowler Senior Research Engineer Sustainable Design and Development.
Lori A. Brown, LEED AP BD+C – Power Jam Study!Lorisweb.com1.
Water Saving Technologies for Buildings August 10, 2015.
Lori A. Brown, LEED AP BD+C – Power Jam Study! Lorisweb.com
Fort Stanwix National Monument Energy Audit Contract
Objectives of a Green Building
Proposed Water Neutrality Ordinance
LEED NC Water Efficiency 5 points Slide Editor: James A
WATER USE MANAGEMENT TOOLS
Worst drought on record so far this year!
Lori A. Brown, LEED AP BD+C, LEED AP ND, LEED AP O+M -- LEED Green Associate Exam -- Power Jam Study! -- lorisweb.com 1.
LEED BD+C – Integrative Process
Town Facilities Benchmarking and GHG Emissions Update
Presentation transcript:

Utility Metering – Saving Energy Dollars and Meeting the Requirements for LEED v4 William Broome – CFM, SFP, LEED GA Brandi Williams – LEED BD+C, FMP, SFP

Introduction In management classes the saying goes, “What gets measured, gets done” In Facility Management, “What gets measured, gets managed, gets analyzed, gets funded, gets built or renovated, gets done…and saves money” Metering is an effective means to measure energy and resources

The Westminster Schools The Westminster Schools is a private K-12 school located in Atlanta. It consists of 26 buildings and structures totaling more than 700,000 square feet and 188 acres of land. In the Summer of 2008 the Facilities Department at The Westminster Schools became very concerned about the rising cost of water and other utilities and began to look at options of what we could do to reduce those costs.

The Original Idea Find an alternate solution to the using potable City of Atlanta water for irrigation of athletic fields A retention pond on campus was already capturing 80% of the campus rainwater runoff and could allow us to come off of city irrigation

The Energy Audit In the Fall of 2009 we contracted with an independent energy auditor to look for areas of savings and sustainability The energy audit reveled $174,819 in energy and water savings through a number projects including lighting retrofits, HVAC upgrades, low flow fixture installations, condensate recover, and metering water to the cooling towers

The Retention Pond The retention pond was not part of the energy audit The project took five years to fully complete, and required us to line the pond, install a pumping system, install three wells and a removable air gap that would allow us to come off of city water The entire project cost $322,846. The average annual savings from the project has been approximately $20,000 annually. Since August of 2013, we have cut our cost for City irrigation water by 100%.

Water Metering Cooling tower – sub-meters were placed on the make-up water lines Project cost - $16,992 Annual cost savings - $50,000 Payback Period - $16,992/$50,000 = (4 months)

Non-potable Water Source Turner Gym Dessert Aire Units remove humidity from the indoor pool area Condensate water is collected and used for the cooling tower in summer months Project cost - $8,651 Annual Savings - $3,412 Payback Period – 2.4 years

Water Metering Westminster Campus Water Metering Sub-meter 10 Buildings Sub-meter 9 Cooling Towers Weekly reports are generated by the Building Automation Systems Unusual increases are noted and problems are more easily identified Utility data is analyzed each month to check for issues with the infrastructure

Water Usage FY08 26,522 CCF FY14 13,984 CCF Overall Reduction (47%)

Water Cost FY08 $319,098 FY14 $255,729 Overall Reduction (20%)

Financial Strategy For the Pond Project: demonstrated the annual cost savings and project payback Initial Payback Period was 15 years Based on Atlanta Water Rates in 2008 For the Energy Audit: projects with the shortest paybacks and biggest savings were implemented first

Lessons Learned Metering has provided a tool for usage analysis Metering has provided a tool for cost analysis Demonstrating savings and paybacks has been made easier with data

LEED 2009

LEED v4 BD+C

LEED v4 O+M Existing Buildings

LEED v4 Prerequisites Outdoor Water Use Reduction Outdoor water use reduction – Required Intent – To reduce outdoor water consumption. Option 1. No irrigation required Option 2. Reduced irrigation – 30% from the calculated baseline Changes from LEED 2009 This was formerly a credit and is now a prerequisite The WaterSense Water Budget Tool is now listed as the referenced calculation tool

LEED v4 Prerequisites Outdoor Water Use Reduction Projects with no landscape area are exempt from this prerequisite Nonvegetated surfaces, such as permeable or impermeable pavement, should be excluded from landscape area calculations Athletic fields and playgrounds (if vegetated) and food gardens may be included or excluded at the project team’s discretion Reductions must be achieved through plant species selection and irrigation system efficiency

LEED v4 Prerequisites Indoor Water Use Reduction Indoor water use reduction – Required Intent – To reduce indoor water consumption Compliance Path 1 Prescriptive Achievement is for projects whose installed fixtures do not exceed WaterSense maximum levels Compliance Path 2 Usage-Based Calculation is for projects that cannot demonstrate the 20% reduction for each fixture Projects pursuing points under WE Credit Indoor Water Use Reduction must use this compliance path

LEED v4 Prerequisites Indoor Water Use Reduction Building Water Use Reduce aggregate water consumption by 20% from the baseline, Table 1. Baseline water consumption of fixtures and fittings is given All newly installed toilets, urinals, private lavatory faucets, and showerheads that are eligible for labeling must be WaterSense labeled Appliance and process water use Install appliances, equipment, and processes within the project scope that meet the requirements listed in Table 2. Standards for Appliances

LEED v4 Prerequisites Indoor Water Use Reduction Table 3. Standards for processes ProcessRequirement Heat rejection and cooling No once-through cooling with potable water for any equipment or appliances that reject heat Cooling towers and evaporative condensers Equip with: makeup water meters conductivity controllers and overflow alarms efficient drift eliminators that reduce drift to maximum of 0.002% of recirculated water volume for counterflow towers and 0.005% of recirculated water flow for cross-flow towers

LEED v4 Prerequisites Indoor Water Use Reduction Changes from LEED 2009 now includes requirements for water-using appliances and processes WaterSense label requirements are now mandatory in the U.S. The prescriptive compliance path, based on demonstrating that all fixtures are 20% below baseline, is new autocontrol faucets with automatic fixture sensors or metering controls are no longer allowed in the design case nonpotable water is no longer allowed as an alternative compliance path

LEED v4 Prerequisites Building Level Water Metering Building-level water metering – Required Intent – To support water management and identify opportunities for additional water savings by tracking water consumption This is a new requirement for a LEED certified project

LEED v4 Prerequisites Building Level Water Metering Step 1. Identify all potable water end uses Step 2. Determine scope of public water supply metering, if applicable Step 3. Determine number, location, and type of all meters Step 4. Track water consumption Step 5. Share water consumption data with USGBC

LEED v4 Prerequisites Building Level Water Metering Install permanent water meters that measure the total potable water use for the building and associated grounds Meter data must be compiled into monthly and annual summaries; meter readings can be manual or automated Commit to sharing with USGBC the resulting whole-project water usage data for a five-year period beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first

LEED v4 Credits Outdoor Water Use Reduction Intent – To reduce outdoor water consumption Reduce outdoor water use through one of the following options. Nonvegetated surfaces, such as permeable or impermeable pavement, should be excluded from landscape area calculations. Athletic fields and playgrounds (if vegetated) and food gardens may be included or excluded at the project team’s discretion

LEED v4 Credits Outdoor Water Use Reduction Option 1. No irrigation required (2 points except Healthcare, 1 point Healthcare) Option 2. Reduced irrigation (1-2 points except Healthcare, 1 point Healthcare) 50% Reduction from baseline 100% Reduction from baseline

LEED v4 Credits Outdoor Water Use Reduction LEED O+M Existing Buildings (30% and 40% reductions from baseline) Option 1. No irrigation required (2 points except Healthcare, 1 point Healthcare) Option 2. No irrigation meter installed: calculated water budget (1–2 points) Use the existing landscape to calculate the landscape water requirement using the EPA WaterSense Water Budget Tool Install an irrigation meter Option 3. Irrigation meter installed (1–2 points) The baseline is established using the annual average of at least 3 years of consecutive data out of the last 5 years

LEED v4 Credits Indoor Water Use Reduction Intent – To reduce indoor water consumption Percentage reduction Points (BD&C) Points (Schools, Retail, Hospitality, Healthcare) Points (ID&C) Points (CI Retail) Points (CI Hospitality) 25% % % % % % Table 1. Points for reducing water use

LEED v4 Credits Cooling Tower Water Use Intent – To conserve water used for cooling tower makeup while controlling microbes, corrosion, and scale in the condenser water system For cooling towers and evaporative condensers, conduct a one-time potable water analysis, in order to optimize cooling tower cycles Measure at least the five control parameters – Ca, Total alkalinity, SiO 2, Cl and Conductivity This is a new Credit

LEED v4 Credits Cooling Tower Water Use As the water on a cooling tower evaporates, dissolved solids become more concentrated in the remaining water and eventually begin to deposit scale on cooling tower or evaporative condenser elements, making such systems less efficient Cooling tower or evaporative condenser water efficiency is measured in the number of recirculation cycles before water must be removed by blowdown Chemically analyzing makeup water allows for calculation of optimal cycles Supplement potable water with a nonpotable source

LEED v4 Credits Water Metering Intent – To support water management and identify opportunities for additional water savings by tracking water consumption Install permanent water meters for two or more of the following water subsystems: Irrigation, Indoor plumbing fixtures and fittings, Domestic hot water, Boiler with aggregate annual water use of 100,000 gallons, Reclaimed water, Other process water This is a new Credit

LEED v4 Credits Water Metering BD+C is 1 point O+M for Existing Buildings 1 point for two water subsystems 2 points for four or more water subsystems All meters, including whole-building meter, must be recorded at least weekly and used in a regular analysis of time trends

LEED v4 Credits Water Efficiency U.S. buildings account for 13.6% of potable water use Metering is a viable strategy for reducing potable water use “What gets measured, gets managed, gets analyzed, gets funded, gets built or renovated, gets done…and saves money”

Thank you for your attention Questions?

Course Review Questions 1. The Water Efficiency section of LEED v4 BD+C has how many prerequisites? a) 1 b) 2 c) 3 d) 4

Course Review Questions 2. In the U.S., All newly installed toilets, urinals, private lavatory faucets, and showerheads that are eligible for labeling must be: a) EPA approved b) WaterSense labeled c) Energy Star labeled d) Water Efficiency labeled

Course Review Questions 3. Building level water metering is: a) Optional for LEED v4 b) Situational in LEED v4 c) Required for LEED v4 d) Not required in LEED v4

Course Review Questions 4. Whole-project water usage data must be shared with the USGBC for a period of: a) 2 Years b) 3 Years c) 4 Years d) 5 Years

Course Review Questions 5. The initial cost of a project to install water submeters was $25,000. If the metering will provide an annual savings in water costs of $5,000, what is the expected simple Payback Period? a) 6 Months b) 2 Years c) 5 Years d) 6 Years

References William Broome, 2013, Westminster Schools FMXcellence Energy Audit Presentation