Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
Status of the MuCool Cavity Prototype Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 21, 2005.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
Cryomodule Concept for the ODU RF Dipole Crab Cavity Tom Nicol* - Fermilab December 10, 2013 * With lots of help from HyeKyoung, Tom J, Shrikant, Ofelia,
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
ESS cavities interfaces
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
IMP Visit July 10, 2013 Matt Hoff LBNL July 18, 2013.
Refurbished Booster RF John Reid October 24, 2012.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
SPS D OUBLE -Q UARTER W AVE C RAB C AVITIES D ISCUSSION ON CAVITY PREPARATION PROCEDURES CERN, 28 October 2015 Silvia Verdú-Andrés, Toohig fellow at BNL.
RHIC 56 MHz HOM Damper Fundamental Damper Fundamental Power Coupler Pick-ups S. Bellavia January 19 th, 2010.
STATUS REPORT ON DIPOLE MAGNETS FOR TRANSFER LINE-2 FOR CTF3 22 Jan 2008 S.S. PRABHU, A. K. JAIN & V. C. SAHNI RRCAT, INDORE (INDIA)
High pure Niobium Industrialisation, Alternative Production Ways, and Strategic Cooperation.
HL-LHC Crab Cavity Review Debriefing Comments from LARP June 30, 2014.
Cold Magnetic Shield Assembly Nik Templeton 25/08/2015.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
HiLumi-LHC/LARP Crab Cavity System External Review – May Work partly supported by the EU FP7 HiLumi LHC grant agreement No and by the.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
ICFA Workshop on High Order Modes in Superconducting Cavities July First Experience with an HOM Coupler for the 56 MHz Quarter Wave SRF Cavity Qiong.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
RFD Cavity Frequency Fix Plan HyeKyoung Park SRF Engineering, Jefferson Lab 06/23/2016.
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
RISP SSR1 Design - `Balloon’ TRIUMF/PAVAC
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN – Zanon discussions
Frequency Sensitivity to Dimensions
Crab Cavities Contribution from the U.S.
Crab – RFD prototype: Production Status Update
Crab Cavities: In-house Production Extremities
Crab Cavity HOM Coupler Specification Drawings & Tolerances
ELLIPTICAL SCRF CAVITIES
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
SPS – RFD Experience and Evolution to LHC
Niklas Templeton – STFC – UK Collaboration
Crab Cavity Manufacturing Readiness Meeting
Cavity + He Vessel interface
RF-Dipole Cavity Update
RF-Dipole Cavity Update
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
DQW HOM Update and Recent Developments
NC Accelerator Structures
Crab – RFD prototype: Fabrication Status Update
JLEIC SRF update SRF team
SNS PPU Cryomodule Design Overview
Presentation transcript:

Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015

Outer conductor halves –4 halves etched, fixtured, and ready for weld 2 Double Quarter-Wave

3 “Top cake pans” –2 etched, and ready for weld Double Quarter-Wave

4 “Bottom cake pans” –2 etched, and ready for weld

Double Quarter-Wave 5 Cake pan assemblies: Ready for weld

6 “Bowls” –Complete –NbTi tuner attachment welds completed Double Quarter-Wave

7 Outer conductor halves –Gages being fabricated for profile measurements RF Dipole

8 Bowls: 4 stamped, final machining today RF Dipole

9 Stiffener: Niobium Stamped (machining in progress) RF Dipole

10 End cap: Niobium stamping in progress RF Dipole

11 RF Dipole Small HOM Box Side Port –2 in QA (4 halves)

12 FPC & HOM Box Port Halves All niobium parts stamped, trimmed, and QA’d. RF Dipole

13 RFD Beamtube with pickup port tube DQW Beamtube with pickup port tube Tubes have been welded Trim to length still need to be completed. RFD & DQW Tubes

14 RFD & DQW Tubes 16 flange assemblies preparing for braze 12 tube assemblies being welded