Delayed Transfers of Care Nursing Home Beds Review Claire Walker Divisional Manager – Integrated Clinical Services.

Slides:



Advertisements
Similar presentations
Hull Intermediate Care Service Service Development Carol Crone / Jim Deacon May 2003.
Advertisements

Seaton Hospital Pursuing Perfection Discharge Project Pursuing Perfection means raising standards to ensure patients have the right care at the right time.
The Journey for Amputee Rehabilitation Josephine Wong Day Rehabilitation Centre Ambulatory & Primary Health Care Directorate Central Northern Adelaide.
SAFER Patient Flow Bundle The patient flow bundle is similar to a clinical care bundle. It is a combined set of simple rules for adult inpatient wards.
To eliminate unnecessary delays in the safe transfer of care of patients from acute therapy teams to community services by improving the quality of information.
Community Hospital Review – The Clinical Model What did we recommend? Dr. David Carson, Director, The Primary Care Foundation.
Stroke Services at HWPH NHS Foundation Trust
7-Day Pledge. What is the pledge? An acknowledgement that access to primary care is critical to managing and improving patient care, especially following.
Peter Ward Senior Physiotherapist Acute Medicine Driving Healthcare Change Through HSCP Research February 28 th, 2014 Carole Murphy Senior Occupational.
Right First Time – Redesigning how we discharge patients 7 days a week D R A NDREW G IBSON, S HEFFIELD T EACHING H OSPITALS AND S TEVEN H AIGH, R IGHT.
Ideas from UK modernisation: The Improvement Partnership for Hospitals Penny Pereira Ideas from UK modernisation.
A whole system challenge -in a challenged system ! South East Essex Health and Social Care.
Integrated Nurse Led Respiratory Service Sandy Walmsley RGN, MSc Lead Respiratory Nurse Specialist –Solihull Care Trust Co Respiratory Clinical Lead –
Integration – empowering people to stay at home NHS Great Yarmouth and Waveney Integrated Care System “Nothing between us that we cannot resolve.”
The Virtual Ward (grasping opportunity!)
The Care Debate: an NHS provider perspective Dr Ros Tolcher Chief Executive, Harrogate and District NHS Foundation Trust National Care Association Symposium.
Developing the AHP Neuro Navigator in NWL – Lessons from Barnet
Stroke Reference Group Recommendations for Stroke Rehabilitation Presentation to the Rehab/CCC Expert Panel March 24,2011.
‘Navigating the System’ Finding early opportunities to access Community Services- ‘Discharge to assess’ work stream Bie Grobet South Warwickshire Foundation.
Healthcare for London is part of Commissioning Support for London – an organisation providing clinical and business support to London’s NHS. Healthcare.
Improved partnership working in winter Acute and Community Hospitals, Community Health Partnerships and Local Management Units Alasdair Macleod.
SIPS Project Strategy for an Integrated Preventative pathway for Swallowing difficulties in Care Homes Eleanor Stout Mary Heritage Derbyshire Community.
Service 19 TH JUNE 2014 /// SEPTEMBER 4, 2015 ALISON CLEMENTS.
Healthy Lives, Healthy Futures Programme Update NLAG Trust Board 28 th July 2015.
Yvonne McWean Lambeth Primary Care Trust 24th February 2009.
Challenges in dementia provision – a service that can support you Sandra Bailey RMN, BSc, Ma, Independent Non-Medical Prescriber Team Leader DIST.
South Tees Hospitals Hospital Discharge Bev Walker Assistant Director of Nursing and Patient Safety Patients are central to everything we do.
Excellent Transitions: Reducing Readmissions Lana McKinney RN, Continuity of Care Service Director Mark Taylor MD, Hospital-Based Services Kaiser Permanente.
Implementing Collins at Frimley Mrs. Geeta Menon Director of Medical Education Frimley Park Hospital NHS Foundation Trust.
Implement new Emergency Pathways that ensure patients are cared by the right person, at the right time. …………………………………………………………… Establish a daily dashboard.
Integration – empowering people to stay at home NHS Great Yarmouth and Waveney Integrated Care System “Nothing between us that we cannot resolve.”
Stroke services Early supported hospital discharge Six month reviews.
The Role of The Specialist Nurse In Respiratory Care Barbara Hanna Respiratory Specialist Nurse South Eastern Trust.
Care in Crisis - the challenge Carol Herity – Head of Partnerships.
Hospital Operational Standards Jennie Hall, Chief Nurse Dr Ros Given-Wilson, Medical Director Martin Wilson, Director of Delivery and Improvement.
Frail Elderly Pathway Walsall Healthcare NHS Trust.
1 Presentation on Reconfiguration of Hospital Services from Dr Dominic O’Brannagain & Dr Colm Quigley to Regional Health Forum – Dublin North East 25 th.
Stirling Management Centre 11 th September 2014 Unscheduled Care National Event Learning Workshop.
West Lothian Community Health and Care Partnership Frail Elderly Programme Introduction – Marion Christie, Head of Health Data Label : Internal.
CLINICAL SERVICES PLANNING GROUP REHABILITATION AND INTERMEDIATE CARE SUB- GROUP THE FUTURE OF IN-PATIENT REHABILITATION SERVICES.
Community Intervention Team – the role it plays in integrated patient centred care Noreen Curtin 6th October 2015.
Jason Holland 10/06/2013 Changing face of Unscheduled Care The Implementation of new roles within the Emergency Care Directorate across Pennine Acute Hospitals.
Meeting the standards Marisa Rose Acute Stroke Lead NEL Cardiac and stroke network Sue Winnall Head Occupational therapist – Rehabilitation.
ED Capacity Management Admissions Flow through ED Tim Parke ED Consultant through ED.
Integrated Care Management. Population Management Model Supported Self Care Care Management Health Promotion Population wide prevention Care coordination.
Community Rehab Team Kate Bradfield (Physiotherapist) Sarah McFarlane (Occupational therapist)
Older People’s Services The Single Assessment Process.
Frail and Elderly Complex Care Case Management Locally Commissioned Service (LCS) D r Lance Saker CCG Governing Body member and Clinical Lead.
Level 6 Discharges from Bradford Teaching Hospitals: Destination and Survival Dr Kath Lambert SpR in Palliative Medicine BRI.
Andrew Copley Director Of Finance & IM&T ~ Airedale NHS FT Care Anywhere the story so far…..
ONE HACKNEY THE CCG’S £1.8M CHALLENGE FUND 2014/15.
The Health Roundtable MELBOURNE HEALTH | Community Pathways Model of Care Presenter: Sandra Savy Hospital Code Name: Innovation Poster Session HRT1215.
Community Reablement Winter Beds 2015/16 GP Education and Training Event 17 September 2015 Dr Ben Solway / Shivaun Aveston For any queries regarding the.
THE INTEGRATED DISCHARGE TEAM. Where we came from In August 2004 five different teams were amalgamated into one. The five teams were: Social Worker and.
Discharge planning Discharge Liaison Nurse’s Patient Flow Team Janet Davies Christine Jones-Williams.
West Gables Rehabilitation Hospital 2015 Stakeholder Report: Brain Injury Program For more than 25 years, West Gables Rehabilitation Hospital has made.
Development of a Community Stroke Rehabilitation Team “meeting the need” NHS Blackburn with Darwen Tracy Walker Team Leader.
We’re counting the benefits of EPR Find out at: epr.this.nhs.uk We’re counting the benefits of EPR Find out at: epr.this.nhs.uk The introduction of EPR.
Housing, Health & Social Care: Partnership Working In Action Agenda Overview: Adur & Worthing Older People’s Housing & Support Strategy Role of Housing,
Older People’s Services South Tyneside Annual Update
What your data tells us Frits Kadijk Continuing Care.
MULTI DISPLINARY CARE.. . PATIENT PHYSICIANNURSESOTHERSDIETITIANPHYSIOTHERAPIST.
Health and Social Care in Partnership
Older peoples services
Supported Care Service
St Peters Hospice Services
Impartial Assessor.
IMPs – Intermediate Mental & Physical Health Care Team
Delayed transfers of care | Overview
Patient Specific Functional Scale
Presentation transcript:

Delayed Transfers of Care Nursing Home Beds Review Claire Walker Divisional Manager – Integrated Clinical Services

Background High DTOCs summer to 37 individuals to 208 bed days PW UCB agreed additional community bed capacity needed in Brent and Harrow NH beds to relieve Acute pressures Target of max 10 DTOCs across 2 sites. Beds available from August 2013 to 31st March 2014.

Project Details Band 7 Acute Nurse/discharge coordinator Managing a team of three occupational therapists. Agreeing costs securing beds - 11 care homes and 1 B&B. Assessment of patients suitability for transfer inc. medically stable Matching patients’ individual needs with the skills and expertise of specific care homes. Visiting and Liaising with care home staff Daily MDT at the Trust and discharge planning Managing issues from patients, families and care homes Record keeping, managing invoicing and payments.

Team Role Discharge planning Comprehensive patient assessments Daily maintenance rehabilitation Referrals to social services and rehabilitation units. Assessment of inpatients for DTOC beds. Management of patient caseload. Daily MDT meeting to discuss patient care and further planning. Managing minor issues/complaints from patients.

Whole System Efficiencies 106 admissions 90 discharges by 31 March Bed days used in NH: ResponsibleAugSepOctNovDecJanFebMarTotal CCG NWLH Total Average daily patient occupancy in care homes

Cost Benefit Estimated cost efficiencies: NH project costs vs average acute bed day cost. This is a very crude measure. Acute hospital bed cost Team Costs Nursing Home bed cost (Average) Cost efficiency gained £1,261,800.00£80,742.00£378,540.00£802,518

Length of Stay LOS for 90 discharged patients was days LOS if we discount the patients with complex pressure ulcers, housing issues and NWB patients was 29.9 days. NWB patients: 27 with LOS days.

Discharge Destination and Readmissions Discharge Destinations: Readmissions to hospital HomeHospitalHousingPlacementRehabRIPTotal %13.3%7.7%28.8%7.7%1.1% Bowel Obstruction Fractured NOF Haematuria Infection – UTI/Chest High Blood sugars Total

Quality No major quality issues raised Patients discharged once stable for agreed destination Complex rehab was not provided or intended NWB post plaster removal received OPD or community rehab once home No comparison done between NH beds Visiting staff progressed discharge issues