Reno, NV June 26, 2015 1.  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update ◦ SB 123- NVision 3. Generator Interconnection Updates.

Slides:



Advertisements
Similar presentations
FPLs Request for Recovery of the Costs Associated with the Seabrook Transmission Substations Pool Transmission Facilities NEPOOL Participants Committee.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Federal Energy Regulatory Commission Large Generator Interconnection Order on Rehearing (Order No A) RM March 3, 2004.
Public Service Company of New Mexico
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Queue Reform at the Midwest ISO NARUC February, 2008.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
Reno, NV December 18,  Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update 3. SB 123- NVision 4. Stakeholder Input 2.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
What’s New in Southern Companies’ OATT Southern Company Transmission 2008 Customer Forum.
Presentation to WECC Market Interface Committee March 24, 2015
NV Energy Energy Imbalance Market (EIM) Presentation to ISAS
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
Sue Sheridan President and Chief Counsel Coalition for Fair Transmission Policy EEI Transmission and Distribution Conference April 2012 TRANSMISSION PLANNING.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
The Value of Electric Transmission NASUCA Mid-Year Meeting June 25, 2012.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Colorado Renewable Requirements, Policies, and Projects James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver,
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Joint Outreach Team Implementation Plan July 12, :30-11:30 a.m.
OSC Meeting April 27, Transmission Cost Allocation Overview.
Transmission Planning at the California ISO September 10, 2015.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Transmission Planning Informational Workshop Montpelier, VT September 19, 2005 Allocating the Cost of New Transmission in New England Stephen J. Rourke.
Energy Imbalance Market Presented at: The Governor’s Utah Energy Development Summit 2015 Caitlin Liotiris Energy Strategies Power Through Ideas.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
Updated 1/28/2011.
Midwest ISO Discussion February 5, 2009 Greg Levesque Manager – Regional Relations & Policy.
G&T Update – Western Farmers Electric Cooperative OAEC MR/PR Fall Meeting (2015)
Update on Energy Imbalance Market Presentation to WECC Market Interface Committee October 15, 2015 Jim Price, Senior Advisor, Market Development & Analysis,
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
1.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
LS Power LS Power is a power generation and transmission group
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
2016 Projected Attachment O-PPI Open Stakeholder Meeting
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Asia-Pacific Energy Regulatory Forum
Rates & Regulatory Updates
New England Resource Adequacy
Update on Energy Imbalance Market
Presentation transcript:

Reno, NV June 26,

 Agenda 1. Regulatory Filings Update 2. Integrated Resource Plan Update ◦ SB 123- NVision 3. Generator Interconnection Updates 4. Stakeholder Input 2

3 Regulatory Filings Update  One Company Rate Case  FERC Order 1000  Energy Imbalance Market

 NVE filed a combined rate case May 31,  Docket ER  Uncontested Settlement Agreement was filed with FERC September 19,  The Chief Judge certified the settlement on September 24, 2014 and ordered that the settlement rates be implemented for billing as of September 1,  The Commission has approved the Settlement and refunds have been issued. 4

 On July 21, 2011, the Federal Energy Regulatory Commission (“FERC”) issued Order No. 1000, Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities (“Order 1000”), which became effective on October 11, 2011  Four areas of reform: ◦ Regional transmission planning ◦ Interregional transmission planning coordination ◦ Right of First Refusal (ROFR) – N/A to Nevada ◦ Cost Allocation 5

 Public Utility Transmission Providers (“TPs”) required to participate in a regional planning process that satisfies Order 890 principles (coordination, openness, transparency, information exchange, comparability, dispute resolution and economic planning) and produces a regional transmission plan ◦ Each region to produce a regional plan reflecting solutions that meet the region’s needs more efficiently or cost effectively  Local and Regional transmission planning processes must consider transmission needs driven by “Public Policy Requirements” established by state or federal laws or regulations  TPs in each pair of neighboring planning regions must coordinate to determine if more efficient or cost-effective solutions are available 6

 Fourth Compliance Filing made on June 15,  Planning Participation Agreement Completed and executed by all FERC jurisdictional members and others.  New Planning Management Committee formed 12/16/14  Study Plan prepared for one year abbreviated 2015 study plan.  Planning process commenced January 1,

 In Docket PUCN approved NV Energy participation in CAISO EIM.  EIM is a voluntary five-minute balancing market currently includes CAISO & PacifiCorp.  NV Energy will join EIM October 1,  Puget Sound Energy and Arizona Public Service have announced that they intend to join the EIM.  Other companies are investigating joining the EIM. 8

 Economic: the EIM reduces costs for imbalance energy through the ISO’s automated system and market operations that match demand with least-cost available resources within transmission constraints in real-time.  Reliability: operating within the ISO’s larger network mode increased visibility, situational awareness, coordination, and automated outage response across larger portions of the western U.S. energy network.  Integration of renewable energy sources: load and resource diversity across the large EIM geographic footprint allow for more opportunities for and more effective use of intermittent resources. 9

 On March 6, 2015 Nevada Power filed with the FERC the proposed amendments to its OATT to provide for voluntary participation in the EIM with the CAISO.  On May 14, 2015, the FERC issued an order that accepted all of NV Energy’s proposed amendments to its OATT, with a few subject to future information or compliance filings.  FERC accepted several OATT provisions with embedded key operational and policy decisions, including: ◦ NV Energy adequately proved the benefits to customers of joining EIM; ◦ NV Energy’s use of ATC for EIM transfers is appropriate; ◦ Use of free transmission for EIM transfers is acceptable; ◦ The change in scheduling deadlines to be consistent with the CAISO’s. 10

11 Integrated Resource Plan (IRP) Status

12 HOT WEATHER ENERGYPCTPEAKPCTPEAKPCT Year(GWH)GROWTH(MW)GROWTH(MW)GROWTH ,8565, ,9170.3%5,6301.1% ,0980.8%5, % , %5,5990.1%5, ,8790.1%5,6480.9%5,8870.9% ,0390.7%5,6920.8%5,9330.8% ,1980.7%5,7300.7%5,9730.7% ,3220.6%5,7460.3%5,9890.3% ,3930.3%5,7770.5%6,0220.6% ,5320.6%5,8150.7%6,0610.6% ,7551.0%5,8781.1%6,1271.1% ,9530.9%5,9300.9%6,1810.9% ,1600.9%5,9850.9%6,2380.9% ,3300.7%6,0340.8%6,2900.8% Note: All historical numbers are weather normalized. Forecast Source: 2015 Integrates Resource Plan Forecast to be filed with the PUCN on July 1, 2015.

13 HOT WEATHER ENERGYPCTPEAKPCTPEAKPCT Year(GWH)GROWTH(MW)GROWTH(MW)GROWTH 20128,9491, ,2022.8%1,7176.0% 20149,2800.8%1, % 20159, %1, %1, ,3782.3%1,7351.8%1,8021.8% 20179,5902.3%1,7581.3%1,8261.3% ,0014.3%1,8002.4%1,8692.4% 20199, %1, %1, % 20209, %1,7560.7%1,8240.7% 20219,7730.9%1,7741.0%1,8421.0% 20229,8590.9%1,7911.0%1,8601.0% 20239, %1, %1, % 20248, %1,6791.0%1,7441.0% 20258,9210.8%1,6961.0%1,7611.0% Note: All historical numbers are weather normalized. WN peaks subject to change. Forecast Source: 2013 IRP 1st Amendment Forecast to be filed with the PUCN on August 15, 2015.

PEAKS AS OF 6/21/2015 RECORDEDFORECAST Daily Temperatures 20-yr Average Temps (MW)DateHourMaximumMinimum(MW)MaximumMinimum South5,4166/20/20156:00 PM , North1,4987/17/20155:00 PM9556 1,

IRP filed June 2012 (Docket ) 2. Planning period: 2013 – PUCN Final Order December 24, PUCN approval was not requested for any new transmission projects IRP will be filed July 1,

 “ Emission Reduction and Capacity Replacement Plan”  Requires NVE-South to retire or eliminate 800 MW of coal by 2019 (Reid Gardner 1,2&3 2014, Reid Gardner and Navajo 2019)  Requires NVE to replace coal with company owned 550 MW of generation either constructed or acquired ◦ Generation type not specified ◦ Receive cost recovery for decommissioning costs  Consumer protection, cap on rates at 5% 16

 Requires annual RFPs for 100 MW of new renewables in 2014, 15, 16 ◦ NVE can participate and compete in RFPs  Requires 50 MW of company-owned renewables to start construction by 2017  Filed a Resource Plan Amendment with the PUCN on May 1, 2014 with plan to comply with SB123 and required resource additions. 1. PUCN approval was requested for two new transmission projects: 1.Harry Allen 500/230 kV Transformer 2.Harry Allen 230 kV Network Upgrades for 200 MW Moapa PV PUCN issued order on October 31, Harry Allen Transformer was approved with June 1, 2016 In-service date. Moapa PV project was denied. 17

1. NPC 2015 IRP will be filed July 1, Planning period: 2016 – PUCN approval will be requested for two new 100 MW PV contracts and required transmission network upgrades. 18

IRP filed July 1, 2013 (Docket ) 2. Planning period: 2014 – Requested approval for new transmission projects 19

Bordertown to Cal Sub 120 kV Line 1.The project was approved by the PUCN in 2007 and includes the construction of a 345/120 kV transformer at Bordertown Substation and a new 120 kV line from Bordertown substation to California Substation. 2.Project would provide additional transmission support to the West Reno transmission system for outages of a North Valley Road transformer and N-1-1 outages of the 120 kV transmission system. 3.To date Sierra has not obtained the required permits for this line and permitting work is continuing. The in-service date for this project has been moved from 2012 to

345 KV Voltage Support Project  Add 75 MVA 345 kV capacitor bank at North Valley Road substation and Mira Loma substation  Mira Loma in service date is December 2013  Valley Road in service date is April

Hycroft Mine Load Addition / Oreana Substation  Project scope has been revised to including a new 345 kV switching station at Oreana and a 345 kV transmission line to Hycroft. 22

Carlin Trend Master Plan  Carlin Trend Under Voltage Load Shedding Scheme  Second Falcon 345/120 kV Transformer  Coyote Creek 120 kV Breaker Addition  Carlin Trend Transmission Additions 23

 New Generators Connected-Last 5 Years  Generators Under Contact (not Suspended)  Generators in Study 24

25

26

 NVE has two cluster windows annually ◦ Closing dates: March 31 st and September 30 th  Fall 2014 Cluster #3—Generation Projects connecting into Harry Allen ◦ In the middle of the Facilities Study ◦ Due by July 16 th  Spring 2015 Cluster #4 ◦ 5 separate clusters—2 South, 3 North ◦ In the middle of the System Impact Study ◦ Due by July 30 th 27

28