LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.

Slides:



Advertisements
Similar presentations
Background Presenters Work done in preparation for WHS changes
Advertisements

Cisco 6500 E-Series Chassis Up-grade
Study report on the TDC2/TCC2 Cabling and Low Voltage activities Ivan Moya Martinez– EN/EL/CF – WP 31st Meeting
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
EN-EL Organisation and Needs for LIU project Mar 4, 2015 Daniel RICCI, Jerome PIERLOT Section Leaders Cabling and Low Voltage, on behalf of the EN-EL group.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
EN-EL and LS2 Gerard CUMER, EN-EL february Presentation outline 2 Part 1 : Overview of CERN’s electrical network Part 2 : Power Quality _ Statistics.
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Organization of cabling information Creating a Medaustron Cable Database 1 That’s what we don’t want!! MACS 28/06/2011 Sebastien Pelletier Cabling Database.
Injector De-cabling Project Project Team Meeting #
Injector De-cabling Project Enlarged meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
TS, Length of YETS EYETS LIU & CONS Project
Contract Training Class I
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
BOOSTER ORPHAN CABLES Georgi Minchev Georgiev EN-EL-CF 08/10/2015 General De-cabling Project Meeting #4.
YETS COMPLEX PS 2015/2016 Travaux EN/EL/CF P. LELONG, J-M. LASSAUCE & G. GEORGIEV 12 Novembre 2015.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
AB/CO - TC – Cl.Deh. HT section 1 Lessons from Point 8 HW installation Better idea of Where, When and … What ! Periodic meeting (every 2 weeks)
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
NEW EN-EL SPECIFIC DATA IN PLAN 08/02/2017
Linac4-PSB 160 MeV connection readiness review
Cabling for LHCb Upgrade
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
YETS & LS2 Reminder P. Lelong / G. Georgiev / JM Lassausse
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
PS-CT: ERD-2 switch tank harmonization
ITER-CERN Workshop CERN approach to the large-scale installation of Fibre Optics & Cabling 17 Jan 2017 Daniel RICCI On behalf of the Electrical Engineering.
Injector De-cabling Project
YETS & LS2 Reminder G. Girardot 20 juin 2017.
De-cabling strategy during YETS
prepared by R.A.Barlow 30/056/2016
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
East Hall under construction
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF

Summary 2. Strategy 5.FAQ 4. LIU de-cabling/cabling roadmap 3. Price optimization 1. LIU cabling works 03/04/2015 Georgi Minchev Georgiev EN-EL-CF LIU-PLI - GENERAL Information meeting

1. According to EDMS % of LIU activities require cabling!!! 03/04/2015Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting

2.2. Is the machine full of unused cables? Cables removing procedure No Yes New cables installation in an existing machine Cables Replacement 03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting New cables installation procedure

What do we have to do first? PSB PS SPS CLEANING UP THE INJECTORS! 03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting

EL-EL-CF LIU Project & Machine Technical Coordination Different contributors User -Demande d'Enlevement des Câbles (DEC) -Disconnection of the obsolete cables -Identification with purple tape Responsible for the cable modifications Only they can identify the systems (hence the cables) as obsolete. Procedure for identification of unused cables EDMS: /04/2015Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting How to proceed with de-cabling?

Hierarchical levels of the elements in order of importance  Identify obsolete systems/sub-systems + associated cables  Identify obsolete racks + associated cables  Identify obsolete equipment and chassis + associated cables  Identify obsolete isolated disconnected cables 03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting Optimization of existing systems  There are a lot of huge systems which can potentially be simplified  With the installation of a few new cables, tens or hundreds old ones could be removed Example BE-CO: the installation of 25 new cables in PSB will enable the removal of 327 old cables!!! What is important for de-cabling? Cables Replacement  Send “Demande d'Enlevement des Câbles (DEC)” with possible execution date For systems requiring existing cables to be removed and new ones to be installed  Send “Demande d'Installation de Câbles (DIC)” Demande d'Enlevement des Câbles (DEC) have to be submitted to EN/EL/CF at least 12 months before works start!

03/04/2015Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting Naming of FP (Boxes) Naming of FP (Boxes) Final Functional Position layout Final Functional Position layout Calculation of quantities Cabling procedure: Supply of material Layout InfrastructureCabling Cable requests (DIC/DIF) Civil engineering Passages Civil engineering Passages Size of the cable ladders Size of the cable ladders 3D intégration of new cable ladders 3D intégration of new cable ladders Final cable requests (DIC/DIF) Installation of the cable ladders Installation of the cable ladders Order materials Price estimation New racks installation. Modifications List of new racks per system List of new racks per system Layout modification Start of the first campaign months cabling compaign definition cabling compaign definition Priorities definition Priorities definition Cable database preparation 1 What to do next? NEW CABLES INSTALLATION! M I N 11 M O N T H S

EN/EL new installation contract incudes important discounts for large-work quantities. ALL REQUESTS TO BE SENT AT LEAST 12 MONTHS BEFORE WORKS START! To use this advantage we need users and coordination contribution:  enable the organisation of large de- cabling/cabling campaigns 03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting 3.

4. ANTICIPATION 03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting

Today we are here DICs + DECs replacement Cabling Obsolete Systems ID DECs De-cabling preparation Onsite marking De-cabling PS-Booster 03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting Disconn. & Onsite Marking replacement De-cabling replacement Cabling preparation Under the hypothesis of PSB-Linac4 connection end of 2016 Beginning of the work Linac 4 connection Is that possible?

Today we are here Cabling Obsolete Systems ID DECs De-cabling preparation Onsite marking De-cabling PS & SPS 03/04/2015Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting DICs + DECs replacement Disconn. & Onsite Marking replacement De-cabling replacement Cabling prep. EL

03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting THE PROPOSED PLANNING IS BASED ON HYPOTHESIS AND UNKNOWN QUANTITIES!  FOR MORE PRECISE PLANNING WE NEED THIS INFORMATION TO BE MORE ACCURATE!

03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting BACKUP SLIDES

EN-EL-CF documents DEC – Demande d’Enlevement de Câbles - EDMS: DIF - Demande d’Installation Fibre Optique - EDMS: DFP - Demande de Fourniture de Patchcords - EDMS: Procedure for identification of unused cables on the CERN site - EDMS: DIR - Demande d'Installation de Racks - EDMS: /04/2015Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting DIC - Demande d'Installation de Câbles - EDMS:

Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting JCG/HIE ISOLDE - cabling meeting OriginDestination Building Functional Position Element Building: Civil Engineering code. Functional Position: Rack, cabinets, machine equipment Element: Frames, boxes, etc… Connections: Horiz. and Vert. Positions Position inside the rack, extra length to let in the machine area, etc.. Câble number, network code, length: Defined by EN-EL Connectors, Wiring Conventions Connector code: See standard connector lists Wiring conventions: See lists. Cable code: See standard cable lists Cable function: free 45 character max. Technical part Comments: Examples: Max cable lengths, Sensible câbles to EMC, etc… How to fill in a cables request (DIC)? - EDMS: Demande d'Installation de Câbles (DIC) - EDMS: /04/2015

Schedule proposal Ressources definition Identification of the starting points Identification of the cable ladders or passages concerned Estimation of the total length Estimation of the waste of irradiated cables. Accessibilities to the cable ladders - schaffoldings, lifting equipment, etc… t 0 WDP ALARA committee Work Supervisor, transport, RP, safety process, etc…Process definition to reduce the dose taken by the workers. Technical and adm. preparation Price estimation Storage of the irradiated cable waste: containers and storage area. 12 months Upon the receipt of the list of the unused cables established by the users – Demande d'Enlevement des Câbles Volume estimation Cables removing procedure EN/EL 03/04/2015 Georgi Minchev Georgiev LIU-PLI - GENERAL Information meeting