KCM & Proterra WSTA Vehicle Maintenance Meeting October 7, 2014.

Slides:



Advertisements
Similar presentations
SAE J1772™ Gery J. Kissel Engineering Specialist General Motors
Advertisements

The Hybrid Car: A look at the future of cars
Electric Drive Vehicles Overview Ann Arbor Clean Cities.
WP3. SMART TECHNOLOGIES AND ALTERNATIVE FUELS BATTERIE Better Accessible Transport to Encourage Robust Intermodal Enterprise Shetland, September,
Status of Hydrogen Station and Fleet Demonstration at Penn State Joel R. Anstrom, Ph.D. February 2007 Director of Hybrid and Hydrogen Vehicle Research.
2011 International Wind Diesel Conference Electric Vehicles in SmartGrids Jito Coleman TDX Power.
Alternative Fuels for Transit Buses Institute of Transportation Studies University of California, Davis Marshall Miller UC Davis June 3, 2008.
All Electric, All the Time With Wireless Charging WAVE McAllen Electric Bus Project.
NYSERDA Alternative Fuel Vehicle Programs Patrick Bolton NYSERDA October 5, 2012.
Vehicle Routing & Scheduling
Beyond Gasoline: Concept Cars. Plug-In Hybrid (PHEV)
CITY FURNITURE - CNG CONVERSION May 13, BACKGROUND INFORMATION.
Transport And Water management EWB Project : Team Grey Adnan Hassan, Adam Bartrop, Graham Thiel, Adam Bailey and Ibrahim Baqer.
Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 18, 2013.
3/31/111 All-Electric Commercial Fleet Vehicles – Vans, Trucks, and Buses.
1 Greening London’s Bus Fleet EMTA General Meeting Copenhagen Steve Newsome Head of International & European Affairs Transport for London.
IEEE JOINT TASK FORCE ON QUADRENNIAL ENERGY REVIEW Technical Implications of Electric Vehicle (EV) Integration for the Grid, Bulk and Local Distribution.
Clean Cities / 1 EAST BAY CLEAN CITIES COALITION Electric Drive Vehicles Overview Richard Battersby Director, East Bay Clean Cities Coalition Date.
Clean Cities / 1 COALITION NAME Electric Drive Vehicles Overview Presenter Title Date.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
UTA Paratransit Bus Electrification Project June 2015.
Report Samples. 2 Stop Report Shows where, when and for how long a vehicle has stopped.
Alternative Fuels Electricity Electric Car Early History Invented between 1832 and 1839 by Robert Anderson storage batteries were improved in 1865 and.
FCC Broadband Workshop: Energy, Environment, and Transportation August 25, 2009 Sheryl J. Wilkerson, President WILLOW, LLC.
Project Proposal Hybrid’s Angels. Proposal Outline Problem Description Proposed Solution Project Deliverables Available Technologies Engineering Content.
1 UTA & Alternative Fuel Vehicles GOVERNOR’S ENERGY DEVELOPMENT SUMMIT JUNE 2014.
The Fully Networked Car Geneva, 3-4 March 2010 Electrical mobility and Climate Change Ziva Patir VP Standards,Regulations and Compliance Better Place Mass.
What’s your number? By Don Ross, Manatee District School February 8 th 2013.
HEAVY DUTY ELECTRICAL CBC. SIZE IS IMPORTANT! THE LARGER THE ENGINE, THE LARGER THE BATTERY NEEDED. ELECTRICAL SYSTEMS VITAL TO EQUIPMENT OPERATION.
Annoyed by high gas prices? Open your eyes to options available. Cheaper Transportation for Jefferson County Commuters.
Bus Acquisition and Facility Expansion Plan for Lamar Consolidated ISD (LCISD) Prepared by Texas Transportation Institute April 2006.
Investigating Performance Improvements and True Costs of Alternative Fuel Buses in Florida Alexander Kolpakov Research Associate Center for Urban Transportation.
Zero Emission Bus Achievements in the USA Andrew Papson CALSTART Project Manager May 6, 2015.
There are a lot of cars to choose from, which one fits your needs and wants?
Our Company can have either one of these vehicles ready for you Mr. Z, the question is, is which one do you want sir? Before You choose, here are some.
Status of Hydrogen Station and Fleet Demonstration at Penn State Joel R. Anstrom, Ph.D. Director of Hybrid and Hydrogen Vehicle Research Center at the.
1CONFIDENTIAL | Measure of SuccessStatusNotes / Comments Fuel Economy (MPGe)Average MPGe = >16 Cost per MileAs mileage has increased in 2014, the cost.
1 ASU Satellite Laboratory Fuselage Design Presenter: Eric Chen.
1 Battery Comparison NanoSafe™ Possesses Disruptive Combination of Features No Other Battery Type Comes Close.
Advancing and expanding trolleybus public transport in Gdynia by the usage of batteries as additional power supply Marta Woronowicz, PKT Gdynia.
Global Electric Bus Market WEBSITE Single User License: US$ 2500 No of Pages: 62 Corporate User License: US$ 4000.
Staff Presentation to Transit Advisory Committee May 1, 2014 Alternative Fuel Choices All-Electric Buses.
Introduction to Transportation Systems. PART I: CONTEXT, CONCEPTS AND CHARACTER IZATION.
Planning for Electric Vehicles Puget Sound New Energy Solutions Regional Workshop September 20, 2010 Ron Posthuma, Assistant Director King County Department.
Feedback Controlled Brushless DC Motor: Personal Electric Vehicle Application Summary Lecture.
Worcester Regional Transit Authority Key Performance Indicators Electric Bus Deployment Project December 17, 2015.
Charles W. Botsford, P.E. and Andrea L. Edwards AeroVironment, Inc. 800 Royal Oaks Drive, Suite 210 Monrovia, CA An Integrated Global Philosophy.
IMPACT OF ELECTRIC BUSES ON THE DAILY OPERATIONS IN BARCELONA Josep M. Armengol, Fernando Gómez and Mario Canet Transports Metropolitans of Barcelona;
Transportation.
Mechanical Energy Storage
Level Two Supply Chain Management
Your Customers Name. EV Charging Proposal.
CCSD Transportation Department
Idling M.P.G. Mid Year Directors meeting
Martha’s Vineyard Transit Authority
VOLTIA Switching Conventionally Fueled LCV Fleets to Electric - NOW
Autonomous Vehicle Pilot Project
Fresno County Rural Transit Agency Moses Stites General Manager
EVs in Orkney What now? Where next? © 2018 OREF.
Fresno County Rural Transit Agency Moses Stites General Manager
Electrification of the 16th St. Mall Shuttles
16 October 2006.
ODOT purchased five Nissan Leaf Sedans in 2011
THE POWER OF DATA & VALUE OF SMART CHARGING
Fresno County Rural Transit Agency Moses Stites General Manager
EV Bus Technologies Update
4.4 Sustainable Development
How to tackle air pollution
Innovative mobility solutions shaping Europe’s Energy Future
solano county Transit our experience with battery electric buses
Presentation transcript:

KCM & Proterra WSTA Vehicle Maintenance Meeting October 7, 2014

BBS, FE & HR Electric Bus Project  Project Goals  Could a battery bus replace the 40’ diesel  Little or no impact on current service  R & D project

BBS, FE & HR Electric Bus Project  Design Expectations  Heavy-duty transit bus  Not connected to an external power supply  Minimal or no interruption to regular 40’ service  Minimal or no interruption to regular base maintenance operation

BBS, FE & HR Criteria  Operations  Typical layover time: 10 – 15 min  Distance per trip: 25 – 30 miles  Charging can not interrupt service  Minimal driver interaction to recharge

BBS, FE & HR

Routes 226 & 241  These two routes are interlined and operate in a circular pattern between Eastgate P&R and the Bellevue Transit Center.  mile loop  Layover at Eastgate P&R

BBS, FE & HR Route 221 & 248  Route 221 operates between Eastgate P&R and Redmond Transit Center.  18.9 miles one way  Layover at Eastgate P&R  Layover at Redmond Transit Center  Route 248 could operate out of Redmond Transit Center  Layover timing with other routes

BBS, FE & HR Criteria  Vehicle Maintenance  Twelve year bus  No fossil fuels: APU, auxiliary heater etc.  Operate all hotel loads  Little impact to vehicle servicing  Base infrastructure requirements

BBS, FE & HR Two Battery Philosophies  Long Range Slow Charge  Pros & Cons  Operation  Maintenance  Short Range Fast Charge  Pros & Cons  Operation  Maintenance

BBS, FE & HR Other Section Impacts  Design & Construction  On street charging  Base charging  Scheduling  Change layover locations  Service Development/Planning  Other groups?

BBS, FE & HR Proposers  BYD – Long range, slow charge  New Flyer – Long range, slow charge  Proterra – Short range, fast charge  All others dropped out  Design Line, E-Bus, Nova, Skoda

BBS, FE & HR Selection  Experience operating battery buses  Base infrastructure  Impact operating 25 to 100 buses/base/Rts  Impact operating 100 to 250 buses/base/Rts

BBS, FE & HR Base Charging  Long Range Slow Charge  Pro – Mileage  Con – Slow charge, 50 KW to 300 KW  Bus fleet of 100 would need 5 MW to 30 MW  Impact to service development  Short Range Fast Charge  Pros – Fast charging, minor base impact  Cons – Limited range, charge station no.  Impact to service development

BBS, FE & HR

TPI Builds the Body  Providence, Road Island  Start with a plug (mold)  Kits are laid out  Different sheets of fiberglass, carbon fiber, Kevlar & balsa wood  Vacuum sealed and resin is drawn into the fiberglass structure.

BBS, FE & HR Body Structure

BBS, FE & HR Composite Body Strength

BBS, FE & HR Axle Mounts

BBS, FE & HR Axle Mounts

BBS, FE & HR ProDrive/Air System

BBS, FE & HR Pro-drive

BBS, FE & HR ProDrive/Air System

BBS, FE & HR

KCM Battery Bus