Construction material – All the material has been ordered with some spare (10%) Material Procurement Faraday cage – Final FEE board dimensions available.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
Walls crates cables gas chambers electronics CERN adb.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
Ferrara 8 june 2004M.Savrié1 Production Readiness Review Ferrara MWPC Production Site.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
T.Schneider/LHCb Muon EDR
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
Shandong University TGC Site Review Review team General impression Material presented Possible improvements Action items Conclusions.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of MWPC production and quality control The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference.
Status of NA62 straw electronics Webs Covers Services Readout.
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
Panel production status Panels needed according to official plan Oct-05 A rate of 250/month is mandatory to match the chamber production schedule.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Material procurement Panels 1300 produced (over 5700 planned) – Stop of the production in August (still at 50% of FR4 sheets delivered by ELTOS) – Restarted.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
G. Carboni - Muon Meeting – Draft Agenda Muon Meeting 6 April 2004 Introduction (15 min) Total 15 min MWPC prodution Material supplies,
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
G. PassalevaFirenze - September 8, 2004 Production Readiness Review Firenze MWPC Production Site G. Passaleva.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Production and installation plan Construction sharing Production plan Installation sequence Material procurement P. Campana LNF – LHCb Muon EDR Cern April.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
Planning for Proto-DUNE PD Installation and Cabling at CERN
University of Wisconsin
T1 status (a selection from EDR presentations)
G. Carboni for the Muon Group
To do list production organization and commitments
Status of MWPC production and quality control
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Presentation transcript:

Construction material – All the material has been ordered with some spare (10%) Material Procurement Faraday cage – Final FEE board dimensions available  M3R3 FC is ready – All the others need the preparation of drawings (M3R4-M2R3-M5R4+....) Honeycomb - We got samples for M1R3/R4 regions, cut at the right dimension and a quotation. Early 2005 we should go for the purchase and the production. Delivered material PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100% PNPI – M2R4 – Panels 20% - HV bars 100% - FR4 frames 100% PNPI – M4R4 – Panels 0% - HV bars 90% - FR4 frames 0% CERN – Panels 60% INFN – M3R3 completed – M2R3 ~ completed – M5R4 Panels 20% HV bars ~ 40% FR4 frames 100% Other elements 100% M1 panels 0% Wire – in last months it occured several times (in LNF and at CERN) that the wire broke during the winding. The problem is being investigated by the Luma company. Probably it is related to a bad spooling.

Panel production rate A rate of 250/month is mandatory to match the chamber production schedule. To monitor the production yield a data base on each INFN site is operational. ~2600 panels have been produced  on average a very good rate The yield appears quite good: approximately 90%. We are here Panels needed according to official plan

1. Preparation in labs: FEE electronics, LV and Faraday Cage must be assembled on chamber (and tested). Part of this work will be done at the production sites: at Roma-2 and LNF for whole INFN production, at PNPI and at CERN. The first chambers will be equipped as soon as the CARDIAC boards will be available. 2. Shipping of MWPCs: INFN chambers to CERN: in special trolleys with shock absorbers stocked in a container (see photo). Shipping of PNPI chambers: in wooden boxes (CSC-CMS like) 3. Tests at CERN: Storage at CERN : about 200 m 2 available. Stored under gas flux. Tests: check no-damage in transportation: test on FEE and last test with HV\ We have yet to deploy a detailed plan for these tests: check the time and the personnel needed; logistics at CERN and the infrastructure needed (gas, HV, etc...) Chamber preparation prior to installation

Trolleys and container for chamber storage and transportation Container with 6 trolleys of 18 chambers each = 108 chambers.

Glue expiration date La presente per inviare in allegato il certificato attestante il prolungamento data scadenza del ns.prodotto Adekit A145/50 da Voi acquistato. Colgo l'occasione per informarVi che i ns. Prodotti Adekit A140 ed A145, a seguito di test effettuati presso la ns. Casa madre, hanno subito modifica di durata di vita che ora corrisponde a mesi 24 dalla data di fabbricazione. Distinti saluti Raffaella Roncoroni AXSON Italia s.r.l. Axson France certifies that the glue can be used up to 24 months after fabrication

Conclusions