R. Aleksan Saclay Avril 14, 2015 Informations générales CECP Prochain RV.

Slides:



Advertisements
Similar presentations
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
Advertisements

Memorandum of Understanding & Common Fund Status Report AMS Technical Interchange Meeting CERN, 27 July 2006 Manuel Aguilar-Benítez, CIEMAT, Madrid - Spain.
1 Future Circular Collider Study Michael Benedikt CERN, 26 th May 2014 Future Circular Collider (FCC) Study - Status Michael Benedikt.
Design Considerations LHC hadron beams: E p =7 TeV E A =E e  Z/A Luminosity O (10 33 ) cm -2 s -1 with Beam Power 100 MW (wall plug) Integrated e ± p.
Roundtable Discussion on Future Machines – Quy Nhon, Participants: Roy Aleksan, CEA, Chair of ESGARD Alain Blondel, Professor of particle physics.
FCC Horizon 2020 Design Study Proposal Daniel Schulte for the FCC team Preparatory Collaboration Board Meeting, September 2014.
Study Overview & Status
Future Circular Collider Frank Zimmermann for the FCC collaboration Future Research Infrastructures – Challenges and Opportunities Varenna, 9 July 2015.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
Future Circular Collider
Future Accelerators at the High Energy Frontier
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Objectives,
CERN and the High Energy Frontier Emmanuel Tsesmelis CERN Directorate-General Unit & JAI University of Oxford JAI Octoberfest 2014 Royal Holloway, University.
FCC Study Status & Summary of FCC Week 2015
Patrick Janot News and Organization  Major events since last coordination meeting (30 April 2014) u 7 th FCC-ee (TLEP) Physics Workshop (19-21 June 2014)
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Work.
3rd Libera Users Meeting
J.P.Delahaye Introduction to the X Band Workshop X Band Accelerating Structure Design and Test Program Workshop WELCOME CIEMAT/Spain, CEA SACLAY/France,
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
WelcomeWelcome CSEM – CERN Day 23 rd May 2013 CSEM – CERN Day 23 rd May 2013 to Accelerating Science and Innovation to Accelerating Science and Innovation.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
Future Circular Collider
CERN : a gateway to fundamental research Research & Discovery Training Technology Collaborating.
CERN openlab Overview CERN openlab Introduction Alberto Di Meglio.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
FCC-FHI 28/1/14 Requirements from Collider Draft parameters just available in EDMS:
CERN openlab Overview CERN openlab Summer Students 2015 Fons Rademakers.
The Mission of CERN  Push back  Push back the frontiers of knowledge E.g. the secrets of the Big Bang …what was the matter like within the first moments.
EDMS # ALICE Resources Review Board 21 th April 2010 Updates to Financial Report CERN-RRB
1 FCC News Frank Zimmermann LHeC-CG, 2 October 2015 FCC status F. Zimmermann on behalf of the FCC Collaboration LHeC Coordination Group 2 October 2015.
CERN Report R-D Heuer ECFA, November Scientific Strategy Implementation of all four European Strategy high priority items Implementation of a diverse.
CERN-RBB EDMS 1 CMS Resources Review Board 19 April 2010 Updates to Financial Report CERN-RRB
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
1 Future Circular Collider Study Frank Zimmermann FCC-ee Physics Meeting 3 February 2015 Future Circular Collider (FCC) Study Scope & Collaboration M.
1 Future Circular Colliders Michael Benedikt 2015 Higgs Hunting, Orsay Future Circular Colliders M. Benedikt gratefully acknowledging input from FCC global.
1 Francis Perez WP4 Cryogenic Beam Vacuum System Conception EuroCirCol WP4 – Cryogenic Beam Vacuum Concept Cryo Beam Vacuum Summary.
Salam, NTU Singapore, Peter Jenni (Freiburg and CERN) LHC, Higgs and Beyond (part II - ATLAS) 1 Dijet mass of 8.8 TeV The future of particle.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
1 Future Circular Collider Study Frank Zimmermann FCC-ee Physics Meeting 3 February 2015 status of FCC-hh/FCC-ee machine studies M. Benedikt, D. Schulte,
1 FCC-ee as Higgs Factory Jörg Wenninger CERN Beams Department Operation group - LHC 23/07/2014 Future Circular Collider Study Acknowledgments to my FCC-ee.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
CERN-RRB ALICE Resources Review Board 30 April 2014 Updates to Financial Report CERN Finance, Procurement and Knowledge Transfer Department.
1 Future Circular Collider Study Michael Benedikt Wigner Institute Budapest, 7 June 2016 Future Circular Collider Study FCC PS SPS LHC.
R. Aleksan Saclay May 11, Réunion Générale FCC 2016 à Rome  avril  > 450 personnes (des demandes d’inscription ont dû être refusées)  Collaboration.
FCC-ee injector complex including Booster Yannis Papaphilippou, CERN Thanks to: M.Aiba (PSI), Ö.Etisken (Ankara Un.), K.Oide (KEK), L.Rinolfi (ESI-JUAS),
The FCC Magnet Program seen from CERN Meeting at ASC-2014, Charlotte, August 13t, 2014.
1 Future Circular Collider Study Michael Benedikt 2 nd FCC Week, Rome, April 2016 Future Circular Collider Study Status and Parameter Update
Future Circular Collider Study
FCC-ee Interaction Region design
CLIC work program and milestones
The 5 minutes tour of CERN The 5 minutes race of CERN
CDR The CLIC CDR is now completed. The three volumes can be found as follows:      Volume 1:       Volume 2: 
FCC summary report March 2015 Washington.
Future Circular Collider
Welcome to CERN Volker Mertens CERN Technology Department.
ALICE Resources Review Board 25 April 2012
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
ARIES WP2 Task 2.3 Coordination, support and enhancement of training activities for accelerators in Europe Meeting:2 Rutambhara Yogi (ESS)
Forming a Gender Equality Group
ARIES A new Integrating Activity for Particle Accelerators
Future Collider Projects at CERN
HEHIHB - WP1 Accelerator Magnet Technology
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
Some CEPC SRF considerations
LHC (SSC) Byung Yunn CASA.
Presentation transcript:

R. Aleksan Saclay Avril 14, 2015 Informations générales CECP Prochain RV

Key Parameters FCC-hh ParameterFCC-hhLHC Energy [TeV]100 c.m.14 c.m. Dipole field [T] # IP2 main, +24 Luminosity/IP main [cm -2 s -1 ] x x Stored energy/beam [GJ] Synchrotron rad. [W/m/aperture] Bunch spacing [ns]25 (5)25 meeting

Two parameter sets for two operation phases: Phase 1 (baseline): 5 x cm -2 s -1 (peak), 250 fb -1 /year (averaged) 2500 fb -1 within 10 years (~HL LHC total luminosity) Phase 2 (ultimate): ~2.5 x cm -2 s -1 (peak), 1000 fb -1 /year (averaged)  15,000 fb -1 within 15 years FCC-hh Luminosity Goals Yielding total luminosity O(20,000) fb -1 over ~25 years of operation

for both phases: beam current 0.5 A unchanged! total synchrotron radiation power ~5 MW. radiation damping:  ~1 h FCC-hh luminosity evolution 24 h phase 2:  *=0.3 m,  Q tot , t ta =4 h phase 1:  *=1.1 m,  Q tot , t ta =5 h

Key Parameters FCC-ee ParameterFCC-eeLEP2 Energy/beam [GeV] Bunches/beam Beam current [mA] Luminosity/IP x cm -2 s Energy loss/turn [GeV] Synchrotron Power [MW] RF Voltage [GV] Dependency: crab-waist vs. baseline optics and 2 vs. 4 IPs

FCC-ee: Luminosity vs. Energy Baseline 2 IP Baseline 4 IP Crab waist 2 IP Crab waist 4 IP

Geology Studies – Example 93 km 90 – 100 km fits geological situation well, better than a smaller ring size LHC suitable as potential injector 90 – 100 km fits geological situation well, better than a smaller ring size LHC suitable as potential injector

Collaboration Status 51 institutes 19 countries EC participation 8 Next general meeting in Rome : April

ALBA/CELLS, Spain Ankara U., Turkey U Bern, Switzerland BINP, Russia CASE (SUNY/BNL), USA CBPF, Brazil CEA Grenoble, France CEA Saclay, France CIEMAT, Spain CNRS, France Cockcroft Institute, UK U Colima, Mexico CSIC/IFIC, Spain TU Darmstadt, Germany DESY, Germany TU Dresden, Germany Duke U, USA EPFL, Switzerland GWNU, Korea U Geneva, Switzerland Goethe U Frankfurt, Germany GSI, Germany Hellenic Open U, Greece HEPHY, Austria IFJ PAN Krakow, Poland INFN, Italy INP Minsk, Belarus U Iowa, USA IPM, Iran UC Irvine, USA Istanbul Aydin U., Turkey JAI/Oxford, UK JINR Dubna, Russia FZ Jülich, Germany KAIST, Korea KEK, Japan KIAS, Korea King’s College London, UK KIT Karlsruhe, Germany Korea U Sejong, Korea MEPhI, Russia MIT, USA NBI, Denmark Northern Illinois U., USA NC PHEP Minsk, Belarus U. Liverpool, UK PSI, Switzerland Sapienza/Roma, Italy UC Santa Barbara, USA U Silesia, Poland TU Tampere, Finland 51 FCC collaboration members & CERN as host institute, 22 March 2015 Next general meeting in Rome : April

Documents and Publications Study internal CERN EDMS Notes, drawings, slides, minutes Source files of scientific papers Public documents CERN CDS PDF of scientific papers, public slides, official reports, videos > R&D and Studies > Future Circular Collider Documents 10

Collaborative Work Platform Meetings Structure in CERN Indico Collaboration Tools Institutes and work breakdown overview Growing platform for information exchange 11

EuroCirCol Consortium + Associates Japan KEK Finland TUT France CEA, CNRS Italy INFN Germany KIT, TUD Switzerland EPFL, UNIGE Netherlands UT Spain ALBA, CIEMAT CERN United Kingdom STFC, UNILIV, UOXF CERNIEIO TUTFinland CEAFrance CNRSFrance KITGermany TUDGermany INFNItaly UTNetherlands ALBASpain CIEMATSpain STFCUnited Kingdom UNILIVUnited Kingdom UOXFUnited Kingdom KEKJapan EPFLSwitzerland UNIGESwitzerland NHFML-FSUUSA BNLUSA FNALUSA LBNLUSA Consortium Beneficiaries, signing the Grant Agreement 16 partners and 4 associates

Contract and MoU Contract with the EC for EuroCIRCOL being finalized (official start in June 2015) Contract with the EC for EuroCIRCOL being finalized (official start in June 2015) Kickoff meeting 2-3 June 2015 Kickoff meeting 2-3 June 2015 MoU with CERN for FCC 2 parts: General framework General framework Addendum with specific activities Addendum with specific activities Study of TPC for FCC-ee Study of TPC for FCC-ee Study of magnetic configuration for FCC-hh detectors Study of magnetic configuration for FCC-hh detectors Design and arcs layouts for FCC-hh Design and arcs layouts for FCC-hh Study and design of dipole magnets fon FCC-hh Study and design of dipole magnets fon FCC-hh MoU is waiting to be signed by G. Fioni Addendum can be modified if we want to add topics, e.g. RF systems RF systems WIFI and/or Calorimetry WIFI and/or Calorimetry

CEPC Timeline FCPPL meeting in HEFEI

L = cm -2 s GeV L = cm -2 s TeV Option with 54 km circumference with 20T magnets

Objective CepC:  End 2014: First Draft pre-CDR collection of existing information  from ILC, FCC on physics and accelerator  for detector (ILD)  On-going internal review of the document with external reviewer also  Accelerator part done  Physics part done  Detector (?)  Spring 2015: Submission for funding CDR during next 5 years  Request in the range 1-1.5BYuan ( M€)  Summer/fall 2015: Decision from Government for R&D support

Financements pour R&D détecteur à Saclay H2020

Appel "Projets Emblématiques« du LabEx P2IO Ces projets devront apporter une forte visibilité au LabEx et avoir un effet très structurant pour les laboratoires de P2IO. Ils bénéficieront d’un financement pluri- annuel qui s’étendra de 2016 à 2019 (fin du LabEx) ; le financement total demandé pour un projet pourra aller jusqu’à un maximum de 900 k€[1]. Une fraction significative du budget du LabEx sera consacrée à ces projets ; il est envisagé de financer 3-4 projets.[1] Suggestion : faire un projet sur « détecteurs pour futurs accélérateurs » Fiche à soumettre au format.pdf par voie électronique au coordinateur de P2IO ( ) au plus tard le 4 septembre 2015 à 17h La taille maximale ne doit pas dépasser 4 pages. Selection en 2 étapes : pre-selection courant Septembre 2015