4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb 2008 1 Gas Gain Monitoring e attivita’ all’ISR Status, problemi, organizzazione Stefano Bianco.

Slides:



Advertisements
Similar presentations
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Advertisements

COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
RPC Purifiers’ studies /status/ IR, RG
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
C.Gustavino, XPC and VETO, LNGS OPERA meeting, may VETO AND XPC: Preliminary ideas Outline: Mechanical structure Gas mixture study Aging tests Glass.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
Results from development of Glass RPCs for INO detector
S.Bianco CMS Frascati - LNF Scientific Committee 1 Stefano Bianco Laboratori Nazionali di Frascati dell’INFN CMS Frascati.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
Optimization of the operation of Muon systems at LHC: a closed- loop gas system for RPCs and a CF 4 -recuperation unit for the CSC of CMS Conseil Européen.
On aging problem of glass Resistive Plate Chambers India-based Neutrino Observatory (INO) collaboration JIGSAW.
Optimization of the Resistive Plate Chamber operation with a closed loop gas system at the Large Hadron Collider experiments M. Capeans, I. Glushkov, R.
September 9, 2003A. Cardini / INFN Cagliari1 M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini 2, C. Deplano 2, P. de Simone 1, F. Murtas 1, D.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
The RPC Closed loop Gas System Slides from Bianco and Guida.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Andrea Di Simone Andrea Di Simone – INFN Roma2 Andrea Di Simone CERN PH/ATC and INFN-CNAF On behalf of ATLAS RPC groups: Lecce, Napoli, Protvino, Roma2.
Control of the RPC ageing effects in the ATLAS chambers at the GIF - X5 CERN irradiation facility Siena 2004 Siena, 24/05/2004 By G. Aielli on behalf of.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
The gas system for the CMS-RPC detector Roberto Guida Collaborazione CMS-RPC Riunione CSN1 Roma, 2 Aprile 2007.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
The closed loop system at ISR We moved the system at ISR in January. Preliminary tests has been done in order to verify the possible use in the “ISR conditions”:
For 2016 RPCWorkshop 1 Charge Distribution dependency on gap thickness of CMS endcap RPC Sung Park, KODEL, Korea Univ On behalf of the CMS RPC group 1.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.
S.Colafranceschi 20 June Stefano Colafranceschi LNF Frascati CERN Universita’ di Roma – La sapienza An overview on gas studies, purifier materials.
Meeting RPC Gas Task Force Meeting – 15 A. Sharma January 21st, 2009
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
SiO x coated fiber optic sensor for gas monitoring in RPC S. Grassini 1, M. Parvis 2, M. Ishaiwi 2 1 Dip. di Scienza Applicata e Tecnologia 2 Dip. di Elettronica.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
G.SavianoWorkshop RPC Mumbai February Materials, Filters and Gas analyses for CMS RPC detector in Closed Loop test setup S.Bianco a, A. Brotzu.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
10/8/ HMPID offline status D. Di Bari, A. Mastroserio, L.Molnar, G. Volpe HMPID Group Alice Offline Week.
Use of fiber optic technology for Relative Humidity monitoring in RPC detectors- M.A. RPC Use of fiber optic technology for Relative.
Monitoring the Concentration of Fluoride and Other Impurities Across a Purification System Naomi Mburu University of Maryland, Baltimore County Supervisors:
GGM Integration Stefano Colafranceschi for the Frascati group
R. Guida PH-DT-DI Boston Students Program CERN, 16/1/2013
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Resistive Plate Chambers performance with Cosmic Rays
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Presentation transcript:

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Gas Gain Monitoring e attivita’ all’ISR Status, problemi, organizzazione Stefano Bianco Laboratori Nazionali di Frascati dell ’ INFN 1.Status of ISR Closed Loop recirculation gas system 2.Gas Analyses 3.Gas Gain Monitoring System Tests and Integration 4.Master Planning

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb STATUS OF ISR CLOSED LOOP (see Roberto Guida’s Talks in Twiki Page) Stable operation with 10% fresh mix during 2007Stable operation with 10% fresh mix during 2007 –Up to 2 months filters lifetime with no currents increase August 2007 Freon supplier changed, air contamination discovered and studied by RobertoAugust 2007 Freon supplier changed, air contamination discovered and studied by Roberto –Manpower burden for purging new bottles September 2007 new double gaps installed at ISRSeptember 2007 new double gaps installed at ISR November-December 2007 new GC-MS arrived, commissioned, operated.November-December 2007 new GC-MS arrived, commissioned, operated. January 2008 one-year Technical Student for ISR Closed Loop (S.Colafranceschi, Frascati)January 2008 one-year Technical Student for ISR Closed Loop (S.Colafranceschi, Frascati) January - February 2008 problem of air intake in Closed Loop, fixedJanuary - February 2008 problem of air intake in Closed Loop, fixed Now Closed Loop operational, restarted, currents are slowly increasingNow Closed Loop operational, restarted, currents are slowly increasing

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb STATUS OF ISR CLOSED LOOP (see Roberto Guida’s Talks in Twiki Page) Run with saturated filters till currents increase, then regenerateRun with saturated filters till currents increase, then regenerate Perform Gas analysis samplings between filters regenerationsPerform Gas analysis samplings between filters regenerations System operates correctly between filters regenerationsSystem operates correctly between filters regenerations Currents increase was always recovered by regenerating filters and/or switching to Open ModeCurrents increase was always recovered by regenerating filters and/or switching to Open Mode No permanent damage was ever foundNo permanent damage was ever found We use ISR as a unique tool to understand and optimize the chemistry of filtersWe use ISR as a unique tool to understand and optimize the chemistry of filters

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Gas analysis CONCLUSIONS AND OUTLOOK on analyses Presence of HF in system, and trace elements (metals, etc)Presence of HF in system, and trace elements (metals, etc) The system is very complex. Many different chemical compositions in the system components. The presence of F compounds in gas-mix damages some af them.The system is very complex. Many different chemical compositions in the system components. The presence of F compounds in gas-mix damages some af them. These results are preliminary. We need different operating procedures for studying the filters kinetic and customize best desorbtion process.These results are preliminary. We need different operating procedures for studying the filters kinetic and customize best desorbtion process. Although filters need to be chemically characterized, the set-up currently used is able to operate correctly the CMS-RPC detector.Although filters need to be chemically characterized, the set-up currently used is able to operate correctly the CMS-RPC detector. SEM-EDS analyses are currently in progress on bakeliteSEM-EDS analyses are currently in progress on bakelite We are setting up a new procedure for analyses on gas at ISRWe are setting up a new procedure for analyses on gas at ISR G.SAVIANO RPC07 MUMBAI

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb oGas sampling and analysis at the ISR Closed Loop performed by Roberto in the past (see RPC07 Mumbai, January 2008)  Observed production of HF and metallic trace elements oAd-hoc sampling points setup by Roberto (before and after filters) oNew sampling scheme (Saviano, Piga, Ferrini)  Gas is bubbled in LiOH solution for a better absorption of pollutants 2. GAS SAMPLING AND ANALYSIS

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb GAS SAMPLING AND ANALYSIS Using LiOH solution reaction formulaUsing LiOH solution reaction formula 2LiOH + Me 2+ --> Me(OH) 2 + 2Li + After sampling amount of LiOH solution will be analyzed by IC (Ionic Chromatograph) for F - and other anions and the remnant will be acidified with HNO 3 and analyzed by ICP-AES (Inductive Coupled Plasma- Atomic Emission Spectrometry) for metallic cationsAfter sampling amount of LiOH solution will be analyzed by IC (Ionic Chromatograph) for F - and other anions and the remnant will be acidified with HNO 3 and analyzed by ICP-AES (Inductive Coupled Plasma- Atomic Emission Spectrometry) for metallic cations –Ppm-sensitivity analyses (Univ. Roma) using IC and ICP-AES Anions F-, S--, solfati, cloruri using IC at Univ. RomeAnions F-, S--, solfati, cloruri using IC at Univ. Rome Metals at Ministry of industryMetals at Ministry of industry F- specific electrodes for HF accumulation measurements (INFN funded)F- specific electrodes for HF accumulation measurements (INFN funded) Tested in Frascati sampling procedure to avoid backdiffusion of LiOH into Closed Loop, no big change in pH of H 2 O control flask, analysis of H 2 O in progress (ICP-AES)Tested in Frascati sampling procedure to avoid backdiffusion of LiOH into Closed Loop, no big change in pH of H 2 O control flask, analysis of H 2 O in progress (ICP-AES) Now procuring sampling material (plastic flasks, tubing, etc)Now procuring sampling material (plastic flasks, tubing, etc) LiOH One-way valve tubing for additional filtering Gas mix

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb TEST IN FRASCATI Tested in Frascati sampling procedure to avoid backdiffusion of LiOH into Closed Loop.Tested in Frascati sampling procedure to avoid backdiffusion of LiOH into Closed Loop. Li concentration, mg/l:Li concentration, mg/l: –flask 2 = mg/l –flask 4 = mg/l NO BACKWARDS DIFFUSION OF Li OBSERVEDNO BACKWARDS DIFFUSION OF Li OBSERVED One-way valve H2OH2OLiOH Gas mix empty H2OH2O

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Gas Gain Monitoring System tests System operational at ISR, working on integration with DCSSystem operational at ISR, working on integration with DCS Tests on sensitivity of charge and avalanche/streamer ratios for working point changesTests on sensitivity of charge and avalanche/streamer ratios for working point changes Good sensitivity in avalanche-to-streamer transition regionsGood sensitivity in avalanche-to-streamer transition regions Run with (0% SF6) --> (0.3% SF6) taken at ISR last week, analysing resultsRun with (0% SF6) --> (0.3% SF6) taken at ISR last week, analysing results

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Preliminary studies Cosmic Rays charge distribution Pedestal Avalanche + Streamer HV= 10.2 kV; HV eff =10.7 kV; Gate=100ns; T=22°C; RH=50%; 26 Oct2007 Streamer counts ADC ch pC Pedestal Avalanche HV=9.4kV; HV eff =9.9kV; Gate=100ns; T=22°C ; RH=50%; 26 Oct2007 counts ADC ch CMS RPC preliminary Avalanche threshold pC Avalanche threshold L.BENUSSI RPC07 MUMBAI

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Preliminary studies Sensitivity of charge distribution to HV (2/3)‏ Inefficiency region avalanche Avalanche + streamer A very rough estimate of sensitivity to working point changes in avalanche – streamer transition Working in the avalanche + streamer region provides a sensitivity of 1.25 pC/10 V CMS RPC preliminary L.BENUSSI RPC07 MUMBAI 100 pC

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Preliminary studies Sensitivity of charge distribution to HV (3/3)‏ Transition region pedestal to avalanche and avalanche to streamer are sensitive to working point changes Blue curve avalanche yield black curve streamer yield avalanche Avalanche + streamer Inefficiency region CMS RPC preliminary L.BENUSSI RPC07 MUMBAI

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Integration with DCS Yesterday CAEN SY1527 at ISR was read by PVSS/DCS (S.Colafranceschi, thanks to G.Polese helpdesk)Yesterday CAEN SY1527 at ISR was read by PVSS/DCS (S.Colafranceschi, thanks to G.Polese helpdesk) CURRENTS MONITOR PLOT HERE

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Master Planning V1 25/2 Closed Loop running with saturated filters25/2 Closed Loop running with saturated filters 3/3 Currents start increasing3/3 Currents start increasing –stop CL – regenerate filters, take samples of used filters –restart CL –Switch gaps to individual CAEN HV SY /3 Giardoni, ISR10/3 Giardoni, ISR –Transport material (PC, gas sensor box, RAID backup, opt fiber) –check air-tightness of 3 gas gain monitoring gaps, connect 3 gas gain monitoring gaps to closed loop –Connect 5 large DG to HV 24/3 Currents start increasing Giardoni, Ponzio, Currents start increasing Giardoni, Ponzio, –stop CL –take samples of exausted filters, install new filters, –install sampling flasks, install F- specific electrodes –restart CL, start gas sampling 30/3 Benussi, ISR30/3 Benussi, ISR 6/4 Benussi, Benussi, 13/4 Benussi, ISR13/4 Benussi, ISR 15/4 Currents start increasing15/4 Currents start increasing –Stop CL –Take samples of used filters, regenerate filters, resume sampling 20/4 Benussi, ISR 27/4 Bianco, Bianco, MayMay –Start Gas and filters sampling with individual purifiers May-JuneMay-June –Install gaps at SGX5

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb Issues Installation of gas gain monitoring at SGX5Installation of gas gain monitoring at SGX5 –Gas Gain monitoring very useful at ISR now. Two-stage installation proposed: Stage 0Stage 0 –Installing gaps with no integration racks, minimal operation »Need basements, power, network »MAY - JUNE Stage 1Stage 1 –Gas integration rack »Negotiate cost with F.Hahn »Time schedule ? Integration with DCSIntegration with DCS –HV and current monitoring OK –Gain monitoring parameters to DCS Event Header 5wordsEvent Header 5words 8gaps * 10words/gap8gaps * 10words/gap 1run=10k events = 1000s = 20min1run=10k events = 1000s = 20min –TOT ~ 100words/run PROPOSAL: RUN LOCALLY DAQ, write DST to file, access file via PVSS/DCS, load DCS Database.PROPOSAL: RUN LOCALLY DAQ, write DST to file, access file via PVSS/DCS, load DCS Database.  ADDITIONAL REQUESTS  ADDITIONAL REQUESTS –Missioni estere, consumi

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb CONCLUSIONS Closed ISR showed how 10% fresh mix operation is possible for several weeks between filters regenerationsClosed ISR showed how 10% fresh mix operation is possible for several weeks between filters regenerations Results on filters bakelite and gas show presence of HF and trace elements (metals mainly)Results on filters bakelite and gas show presence of HF and trace elements (metals mainly) System is complex (bakelite, gas, filters) and it is being characterized by new gas analyses System is complex (bakelite, gas, filters) and it is being characterized by new gas analyses Closed Loop for CMS RPC can be used at SX5Closed Loop for CMS RPC can be used at SX5 Full understanding of filter, gas, materials chemistry in progress at ISR (six months-one year)Full understanding of filter, gas, materials chemistry in progress at ISR (six months-one year) DRAFTSDRAFTS –Gas filters bakelite analysis (90%) –CFD simulation of flux in small gaps (80%) –Gas Gain Monitoring gaps (10%) –High-statistics bakelite analysis

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb CMS-ATLAS-OPERA collaboration

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb SPARE

4 marzo 08 Stefano Bianco (Frascati) - CMS RPC Italia Feb USC5UXC5 C 2 H 2 F 4 /SF 6 /i-C 4 H 10 /H 2 O Slow Ctrl GC, p/T/RH/Ph CMS VENT PURIFIERS SGX Bldg RPC TRIG2 RPC TRIG1 RPC TRIG4 RPC TRIG3 RPC PAD REF2 RPC PAD REF1 RPC PAD MON6 RPC PAD MON5 REFERENCE half wheel lines VENT RPC PAD MON4 RPC PAD MON3 RPC PAD MON2 RPC PAD MON1 MONITOR VENT Gas Gain Monitor (conceptual design ) VENT