10/02/2015 DT Shifts for Run II 2015 DT Detector Online Contact (DOC): - Bologna: Daniele Fasanella, Giuseppe Codispoti, Gianni Masetti - Torino: Linda.

Slides:



Advertisements
Similar presentations
Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
Advertisements

Project Manager P. Paolucci M. Tytgat & G. Pugliese Project Manager P. Paolucci M. Tytgat & G. Pugliese Run Coordinator L. Benussi H. Shahzad N. Zaganidis.
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT Tasks/Responsibilities/Manpow er issues. 1.
Year End Technical Stop DT work Mu Barrel Workshop 13 October 2011 A. Benvenuti (INFN Bologna)
Logistics for P5 Underground visit of CMS Detector with CMS Technical coordination – We are in the middle of LS1 … what is going on on the detector? Tour.
Information Systems and Data Acquisition for ATLAS What was achievedWhat is proposedTasks Database Access DCS TDAQ Athena ConditionsDB Time varying data.
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
1 Status at P5 Ignacio Redondo & Gianni Masetti CIEMAT INFN Bolonia Cosmic event during MWGR10.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
TE/MPE/EM/PMT Collaborations Rui de Oliveira on behalf of PCB workshop team 29/11/20121.
RPC project status report RPC IB meeting 28 June 2011 Pigi Paolucci.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Institutional Responsibilities HEPHY – CMS Management Meeting June 20, 2013.
Electronic Detector status and run organization Logistics and organization Updates on the electronic detector since last year run Conclusions.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
1 Gif ++: August Beam Data Taking Summary 7/24/2015.
CAF shifts and procedures Marcello, Raffaello, Alberto, Pigi, Sungeun, David, Silvia, Anna & all the 2009 shifters.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
24/02/2011Muon Barrel Workshop1 Gianni Masetti & Ignacio Redondo (and others) Shutdown interventions and operation in 2011.
NA62 TDAQ WG Meeting News and usual stuff M. Sozzi CERN – 29/5/2009.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
February 07, 2002 Online Monitoring Meeting Detector Examines Should aid in: 1.Diagnosing problems early and getting it fixed 2.Making decisions on the.
Muon Institution Board 29 March 2011 Pigi Paolucci RPC project status.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
Phase 2 muon plenary, 11-Feb-2015 Jay Hauser  Based on three main arguments:  Age/reliability  Radiation tolerance  Maintainability  Bonus: L1 trigger.
Run2 Muon System Experts and other thoughts Alessandro Cardini INFN Cagliari.
MUON DAQ WORKSHOP Muon Week, CERN February 2014 Nicoletta Garelli (SLAC)
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 Minutes form last discussion (after second test beam) 0-Data analysis: a taks force led by the DT DPG convenors to expedite the analysis of Gif++ data.
LHCbComputing Personnel status Preparation of discussion at next CB.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
Control Room and Shift Operations: CMS Greg Rakness (CMS Deputy Run Coordinator) University of California, Los Angeles ATLAS Post-LS1 Operations Workshop.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Arnd Meyer (RWTH Aachen) July 21, 2003Page 1 Data Taking July 14 – 20 Day∫L dt (del)∫L dt (rec)Efficiency Mon 956nb nb % Wed 111nb nb.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
Philip Burrows TIARA Preparation Board, CERN, 14/10/091 TIARA WP5 preparation status Philip Burrows John Adams Institute for Accelerator Science Oxford.
ADC Operations Shifts J. Yu Guido Negri, Alexey Sedov, Armen Vartapetian and Alden Stradling coordination, ADCoS coordination and DAST coordination.
Institution board (Chairman) Conference committee (Chairman) Editorial board (Chairman) Resource manager Upgrade SC (Chairman) DPG coordination Project.
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
“Technical run experience” Gianluca Lamanna (CERN) TDAQ meeting
M4 Operations ● Operational model for M4 ● Shifts and Experts ● Documentation and Checklists ● Control Room(s) ● AOB Murrough Landon 24 July 2007.
P. Kuijer1 System run coordinator meeting
«The past experience with JCOP in ALICE» «JCOP Workshop 2015» 4-5 November 2015 Alexander Kurepin.
P. Paolucci G. Pugliese M.Tytgat
Draft of to institute heads
Federico Ronchetti, LNF weekly meeting
ESR for the muon DT Minicrate System
TC activities.
LAV front-end and readout status
Meeting at Erice Great success!
ITS Cooling: Xmas Plan Claudio Bortolin.
ESR for the muon DT Minicrate System
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
CMS Goal of the experiment
ورود اطلاعات بصورت غيربرخط
Talk general structure
DQM for the RPC subdetector
MoA for DT system Milano
Presentation transcript:

10/02/2015 DT Shifts for Run II 2015 DT Detector Online Contact (DOC): - Bologna: Daniele Fasanella, Giuseppe Codispoti, Gianni Masetti - Torino: Linda Finco, Gian Luca Pinna, Vincenzo Monaco - Madrid: Jesus Puerta Pelayo, Juan Pablo Fernandez Ramos - Oviedo: Isidro Gonzalez Caballero - Aachen: Soren Erdweg, Daniel Teyssier, +1 -University of Malaya: Mira Zukhaimira (DQM expert in training) 13 contacts to cover 43 weeks in 2015: 5 new contacts (PhD students). DT Infrastructure contact to be pointed to DT DOC eventually - Will keep it pointing to local CERN experts at run start 46 weeks DT offline shifts distributed over pool of dozen of expert shifters -Good entry point to the system -Does not require CERN presence -DT offline expert paralle shift as needed

10/02/2015 Local DT Experts for Run II 5-6 CERN based experts, not 100% dedicated to operation but very committed Alberto Benvenuti, overviewing Gas, HV and TC issues, leaves CERN half of the year Ignacio Redondo is Technical Coordinator and local readout and TCDS expert Daniele Fasanella is deputy Technical Coordinator and Power supply (HV) system and WinCC (PVSS) expert. Andrea Triossi is Electronics Coordinator and local Slow Control and DSS expert Gianni Masetti is Run Coordinator and local MiniCrate and trigger expert Daniel Teyssier is deputy Run Coordinator and local VDC and Gas expert 3 “complete” FTEs are required to operate DT in 2015, 2016, DT project contributes to supporting experts maintaining alignment (Zoltan and Noemi) and our Integration Office contact (Domenico Dattolla)  could be available for emergencies

10/02/2015 Remote Support for Run II Most of the Knowledge is based at home institutes in ~ 20 experts. Fraction devoted to operation oscillates a lot [10, 50] %. Some of them covers crucial areas in the day to day operation Some of them carry an advisor role (in case of problems) Padova (Sandro Ventura,Matteo Pegoraro, Franco Gonella, Lorenzo Castellani, Fabio Montecassiano, Massimo Benettoni) Legnaro (Michele Gulmini, Nicola Toniolo) CIEMAT (Cristina Fernández, Alvaro Navarro, Javier Sastre, Jesús Puerta) Bologna (Marco Dallavalle, Luigi Guiducci, Giuseppe Codispoti, Casimiro Baldanza) Torino (Silvia Maselli, Paolo de Remigis, Francesco Rotondo)  ~4 “complete” home institutes FTE are required to operate DT in Technical support during Year End Technical Stops 5

10/02/2015 Manpower for Run II 13 DT DOC shifts to cover 43 weeks in 2015( ) 46 weeks of DT offline shifts to be covered in 2015 ( ) 5-6 CERN based experts, not 100% dedicated to operation but very committed  3 “complete” local FTEs are required to operate DT in 2015, 2016, 2017 Most of the Knowledge is based at home institutes in ~ 20 experts.  ~4 “complete” home institutes FTE are required to operate DT in Operating efficiently and safely the detector we have today is our more important responsibility DT operation will be part of the Muon operation during 2016 &2017 Continuity?  Consolidation? 6