Aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status.

Slides:



Advertisements
Similar presentations
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Advertisements

19 Sept 2005Flavio Dal Corso INFN-Pd1 MiniCrates Status Components Status (BTIM, TRB, CCB, SB) MC production: quantity and rate, past and future Production.
Marzo 2004Flavio Dal Corso INFN-Pd1 Status of Drift Tubes Local Trigger Electronics.
Marzo 2004Flavio Dal Corso INFN-Pd1 Results from May 2003 Test Beam First test of all the electronics integrated in a MB1 Minicrate Items tested: Hardware.
Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
1 Linac/400 MeV BPM System Status Nathan Eddy PIP Meeting 8/8/12.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
& GUIDED QUESTIONS MATH VOCABULARY DAY 1. Everyday you will be given some Math words to define. You will use your MATH JOURNAL to define them. Copy down.
Fgasparini LHCC Review May 041 SUMMARY: Latest results on the Minicrate performance Status of chamber production Torino line The High Voltage Boards problem/status.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
TMDB delay and production plan Augusto. TMDB Prototype Status The prototype boards almost fully assembled should be delivered this week ( May 5 th ) First.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Station Board EVLA F2F Meeting: December Dave FortEVLA F2F Meeting: 11/12 December Outline Station Board Review Station Board Status Delay.
Status Report # 1 Home Security Wire Protection System Ronald, Robert, Orlando, Jaime An interfacing module to communicate with previously designed protective.
Keeping Safe in Northamptonshire The Learning Disability Partnership Board Meeting October
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Grid Workload Management Massimo Sgaravatto INFN Padova.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
- Introduction - Procurement status - Main milestones EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Schedule.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
06/02/02CERN - LARG meeting1 CALIBRATION BOARD STATUS  Status of the DMILL chips used on the calib. boards  Low Offset Op Amps: Offset measurements 
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Status of NA62 straw electronics Webs Covers Services Readout.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
WEEK 1 You have 10 seconds to name…
Collaborative tools for translators at the EP Pedro García Diéguez Head of the CAT and collaborative tools service 08/04/2015.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 25, 2004.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Converter Regulation Board Status WP PO 09/12/ CRB_PC_Advanced_Control.ppt Ph. Fraboulet – Converter Regulation Board 1.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
L1Calo L1 Coordination Meeting March 24th, 2015 Rainer Stamen.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Merge Sort Comparison Left Half Data Movement Right Half Sorted.
Under class work click on capstone. Click getting started for a quick review of the project. Each heading has info that can help.
TDC/TEL62 update M. Sozzi NA62 TDAQ WG meeting Bruxelles – 9/9/2010.
Chris BoothUniversity of Sheffield 1 Target Status & Progress 1 st February 2006 Disappointingly slow progress over last 2 months. However, progress is.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
NTC 362 Week 5 DQ 1 What are some of the major electronic and physical threats to communications networks? What can be done about them? To purchase this.
ESR for the muon DT Minicrate System
Studies of Padova Perugia 16 June 2009 Flavio Dal Corso INFN-Padova.
CMS November Upgrade Week
DT Consolidation Summary
ESR for the muon DT Minicrate System
10/month is the present production rate 2 FTE + sporadic contributions
CMS Goal of the experiment
ALREADY,STILL, OR YET LEVEL 10.
AIDA Asic Heatsinks Prototype received, and approved.
C.2.10 Sample Questions.
SVT – SuperB Workshop – Frascati Sept. 2010
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Plans for the 2004 CSC Beam Test

Presentation transcript:

aprile 2004Flavio Dal Corso INFN-Pd1 Drift Tubes Local Trigger Electronics Boards Production Status

aprile 2004Flavio Dal Corso INFN-Pd2 Multichip Ceramic Module: 4 BTI per module. Almost half production done (~5500/12500). A lot of 2500 modules re-tested successfully by Metallux: only 5 (=0.2%) modules rejected. Results on the new glob resin top not yet available. (Works on Metallux is going on slower, as the engineer responsible of the project has left Metallux). BTIM

aprile 2004Flavio Dal Corso INFN-Pd3 Boards already available: –29 TRB-φ –9 TRB-θ TRB Trigger Boards. Boards available soon (by mid of May) : –50 TRB-φ –20 TRB-θ –10 TRB-φ-32 Enough for ~15 minicrates. Start of mass production foreseen for September.

aprile 2004Flavio Dal Corso INFN-Pd4 The 40 prototypes, foreseen at the beginning of April, are delayed to end of May. Few samples promised within the first week of May. CCB CCB link Control Boards.