IBL and SLHC activities at LPNHE Paris 2011 - 2012 – 2013 Réunion Atlas France - 10 octobre 2012.

Slides:



Advertisements
Similar presentations
Development of super module structures at Glasgow Calum I. Torrie 20 th April 2007.
Advertisements

Institut für Verbundwerkstoffe GmbH Erwin-Schrödinger-Str Kaiserslautern Germany 1© Institut für Verbundwerkstoffe GmbH, N.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
Activités mécaniques 17 septembre 2013 D. Laporte F. De Matos / Y. Orain / P. Ghislain Atlas / SLHC.
1 David Santoyo Petal Locking Points: AUW Nov 2014 Petal Locking Points.
Saga of the IBL Staves Franck Cadoux on behalf of the ATLAS IBL engineering team (and Eric Vigeolas in particular)
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Outer Stave Prototype Update E. Anderssen, M. Cepeda, M. Garcia-Sciveres, M. Gilchriese, N. Hartman, J. Silber LBNL W. Miller, W. Shih Allcomp, Inc ATLAS.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Training for cAreer deveLopment in high-radiation ENvironment Technologies 1 Work Package 4 New mechanical integration methods November 20 th, 2013 Franck.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
M. Gilchriese Update on Pixel Prototype Mechanics/Cooling Structures at LBNL February 1, 2008 M. Cepeda, S. Dardin, M. Garcia-Sciveres, M. Gilchriese and.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
ATLAS Pixel Detector July 2001 Cooling Services Connections N. Hartman LBNL Cooling Connections Status Report October 11, 2001 N. Hartman, E. Anderssen,
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
Aug/16/05 Su DongSiD Vertexing: Snowmass 05 SiD trk+vtx1 SiD VXD Geometry Update Su Dong SLAC.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
WP4 – Plans for next 6 months
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
PHENIX Silicon Vertex Tracker. Mechanical Requirements Stability requirement, short and long25 µm Low radiation length
FOS monitoring for Off-beam infrastructure AIDA 2 nd Annual meeting WP9.3 Iván Vila Álvarez Instituto de Física de Cantabria (CSIC-UC )
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
ATLAS Inner Detector thermal study. The Inner Detector.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Considerations on integration, mechanics and cooling R. Santoro, D. Perini ITS Upgrade plenary meeting, 29-May 2011.
FEM/CFD thermo-mechanical analyses on IBL Mock-up A. Sciuccati.
IN2P3. Why Titanium for cooling circuits? Titanium material collect the most important criteria for cooling circuit design: Low CTE: important parameter.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
Mechanical layout, services and integration R. Santoro On behalf of the ITS upgrade WG4.
Pierre Barroca ITK LAPP – Goals 2.Simulation 3.Prototype measurements 4.Setup 5.Results 6.Conclusions 1.Goals 2.Simulation 3.Prototype measurements.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
Thermal modeling, interfaces, test results LBNL Composites Workshop February 29-March 3, 2016.
The ATLAS Insertable B-Layer Detector (IBL) F. Hügging on behalf of the ATLAS IBL collaboration Pixel th International Workshop on Semiconductor.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
Straw man layout for ATLAS ID for SLHC
Local cooling LAPP – Annecy /IN2P3
IBL project for DT Science-Techno Tea
Status of GASPARD mechanics
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Hcal Geometry and Assembly
Strip Petals: Local supports and prototype tests
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
LPNHE-CPPM 28 juillet 2006 A.Rozanov
C.Clerc ILD session, ALCPG /03/2010
Services Layout – Update
WG4 – Progress report R. Santoro and A. Tauro.
Barrel stave allocation on the PP0 exhaust fitting
IBL activities ATLAS Meeting Milano, 14 May 2012 S. Coelli,
9/20/2018 CHIPP Meeting 10 September 2008 Slides for use by Sven for ATLAS talk DPNC Geneva 10 September 2008.
CF testing pipe & testing plan
Presentation transcript:

IBL and SLHC activities at LPNHE Paris – 2013 Réunion Atlas France - 10 octobre 2012

IBL activities D. Laporte (IE) 90% P. Ghislain (AI) 10% B. Grosjean (student) 2 months

IBL parts End ring (x5), Al Central ring (x3), Al and PEEK X0 optimization

IBL Mockup Dummy staves (x14) Titanium screws Peek sliding parts Carbon fiber tube

Fitting at PP1 with LAPP

Fitting tools

SLHC activities D. Laporte (IE) 90% F. De Matos (IR) 50% P. Ghislain (AI) 10% Y. Orain (AI) 50 % B. Grosjean (student) 2 months S. Bouaziz (student) 6 months

Activities Cartigny design with CPPM Xo evaluation for differents group – UNIGENE : super modules – LBNL : Ibeam solution – Cartigny – Alpine stave – Barrel & Endcap calorimeter (response) FEA simulations – Cartigny Mechanical support for silicium R&D.

Cartigny design with CPPM

Thermal simulations

Thermomecanics FEA

X0 development Mode batch Fichier Paramètres Contrôle répertoire Message fin Non Oui Test mémoir e Macro catia Non Oui Catia Ecriture données Angle + pas Limite angle Non Oui Non Oui Macro IBM Developments by LPNHE Team, and IAO team (CCIN2P3) Additional layers have been developed, to cope with : CATIA memory management limitations Traceability of design analyses Huge output : scan on 0.1 by 0.1 grid  1.5 Gb file

X0 examples : Ibeam DistanceXo En bleu clair, mousse (X0=2130 mm) En cyan, structural beam en forme de I (X0=224 mm) En vert, Face sheet (X0=224 mm) En rouge, cooling pipe (Alu, X0=88.97 mm) En noir, cooling fluid (C3F8, X0= mm)

X0 examples : Alpine layer 3 Endblock Sensors Foam Face plate Omega tube X0 eta Epaisseur (mm)

Total cost : IBL Parts – Ti screws2,2K€ IBL mockup – Composite tube 1 K€ – Dummy pipe (steel)0,2 K€ – Sliding parts (PEEK)0,5 K€ – Dummy staves0,5 K€ IBL fitting – Tools0,2 K€ Total ,6 k€ SLHC (prevision for 2013) – X0 software adaptation2 K€ – Purchase of materials for prototyping/testing2 K€

Perspectives IBL – LPNHE commitments delivered – Participation to installation  4 k€ travels in 2013 SLHC – X0 software adaptation2 K€ – Purchase of materials for prototyping/testing2 K€