FINUDA TRIGGER FINUDA Collaboration Meeting Trieste, May 6-7 2004 Simonetta Marcello - Torino Paola Gianotti - LNF Fulvio Pompili - LNF Aldo Zenoni (MC)

Slides:



Advertisements
Similar presentations
Apostolos Tsirigotis KM3NeT Design Study: Detector Architecture, Event Filtering and Reconstruction Algorithms XXV Workshop on recent developments in High.
Advertisements

TIME 2005: TPC for the ILC 6 th Oct 2005 Matthias Enno Janssen, DESY 1 A Time Projection Chamber for the International Linear Collider R&D Studies Matthias.
2 Oct 2003 UCL 2nd Year Talk 1 Crosstalk Removal to Improve Muon dE/dX Measurements Leo Jenner, UCL.
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
CERN Summer Student Session
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
STAR Status of J/  Trigger Simulations for d+Au Running Trigger Board Meeting Dec5, 2002 MC & TU.
Dec/02/04 Su DongCaltech Trigger/DAQ/Online workshop1 Level 1 Trigger: Introduction L1 trigger objects and strategy Implementation features L1 composition.
Test beam 2001 Results M.C. Fouz Muon Week, CERN Nov 01.
Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Summary of downstream PID MICE collaboration meeting Fermilab Rikard Sandström.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
IJAZ AHMEDNational Centre for Physics1. IJAZ AHMEDNational Centre for Physics2 OUTLINES oLHC parametres oRPCs oOverview of muon trigger system oIdea of.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
TOF Electronics Qi An Fast Electronics Lab, USTC Sept. 16~17, 2002.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
PERFORMANCE OF THE MACRO LIMITED STREAMER TUBES IN DRIFT MODE FOR MEASUREMENTS OF MUON ENERGY - Use of the MACRO limited streamer tubes in drift mode -Use.
MICE CM16 Oct 2006Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM15 o Detector DAQ software o Interface DDAQ / Mice Control & Monitoring.
RISING stopped beam trigger Take Saito and Nik Kurz.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
C.Vigorito, University & INFN Torino, Italy 30 th International Cosmic Ray Conference Merida, Mexico Search for neutrino bursts from Gravitational stellar.
Peter-Bernd Otte - 8 th March 2010 CB collaboration meeting, Mainz.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
LNF Scientific Committee, October 28th 1 Paola Gianotti LNF.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Trigger and DAQ System Zhao Jing Wei Sept. 2002, BESIII review, Beijing Outline Trigger system Event rate estimation Principle of design Scheme Monte Carlo.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Front Tracker: main technical solutions 40x50 cm 2 module Front Tracker Chamber: 40x150 cm 2  Use COMPASS approach: 3xGEM, 2D readout - one significant.
Trigger System LIU Zhen’an Inst. of High Energy Physics, Beijing Sep
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
IHEP/Protvino for FP420 R&D Collaboration 1 IHEP/Protvino Group: Igor Azhgirey Igor Bayshev Igor Kurochkin + one post-graduate student Tools:
Nevio Grion- – LNF Scientific Committee, Frascati, May 29 th, 2003.
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
Search for neutron-rich hypernuclei in FINUDA: preliminary results presented by M. Palomba 1 for the FINUDA Collaboration 1 INFN and Dipartimento di Fisica,
Preliminary Design of Trigger System for BES III Zhen’an LIU Inst of High Energy Physics,Beijing Oct
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
1 The Scintillation Tile Hodoscope (SciTil) ● Motivation ● Event timing/ event building/ software trigger ● Conversion detection ● Charged particle TOF.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Time-zero evaluation using TOF, T0 and vertex detectors
"North American" Electronics
Yet another approach to the ToF-based PID at PANDA
Electronics Trigger and DAQ CERN meeting summary.
First …. Hyper-meeting Who we are? (alphabetical order)
ETD meeting Electronic design for the barrel : Front end chip and TDC
Tracking results from Au+Au test Beam
The Beam Test at Fermilab:
Special edition: Farewell for Valerie Halyo
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
The First-Level Trigger of ATLAS
Special edition: Farewell for Stephen Bailey
BESIII EMC electronics
Special edition: Farewell for Eunil Won
Trigger session report
Particle ID Diagnostics in the MICE Beamline
Quarkonium production in p-p and A-A collisions: ALICE status report
The CMS Tracking Readout and Front End Driver Testing
August 19th 2013 Alexandre Camsonne
The LHCb Front-end Electronics System Status and Future Development
Trigger operation during 2007 run
Presentation transcript:

FINUDA TRIGGER FINUDA Collaboration Meeting Trieste, May Simonetta Marcello - Torino Paola Gianotti - LNF Fulvio Pompili - LNF Aldo Zenoni (MC) - Brescia Francesca De Mori (OA) - Torino ….

FINUDA TRIGGER Strategy n SELECTIVE TRIGGER based on fast detector (TOF) and electronics n MODULAR and PROGRAMMABLE STRUCTURE to have a flexible configuration n CARE of TRIGGER DESIGN from the beginning to cope with high rates (up to 30 MHz) n Dedicated MC SIMULATION physical events, background (Touschek) [2000: G.Gomez- 2003: A. Zenoni] n Latency ~ 200 ns at First Level RF signal not used at all in the Logic (due to old FEE on detectors) RF: 380 MHz (interbunch time 2.6 ns) rate ~ 400 Hz, interaction time 2 ms HYP rate < 1Hz Bhabha < 200 Hz n Asynchronous Trigger (continous source of events) FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 L = cm -2 s -1 Accurate TIMING is CRUCIAL to select events from background For more details: ISEO 2002

Level 0 u selection is made using TOFINO signals u here trigger is asynchronous Level 1 u selection includes TOFONE signals u synchronization is given by level 0 TRIGGER STRATEGY Selections energy loss topology multiplicity tof (In-Ext barrels) Mean Timing signals to identifiy hit slabs FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 ISEO 2002

TIMING alignment Reference: photodiode Gated OR TOFONE TOFINO LThr MTTOFINO HThr MT MLU Exclusive BTB 1-1 BTB (Bhabha, not used for triggering) PAL Exclusive BTB 1-3 BTB (Bhabha + KsKl) OR-MB PAL NOT Excl BTB 1-3 K+K- OR-EL PCoin narrow window OR-TOFONE Prompt Coincidence (less +) Slow Coincidence (only +) MULT SEL HYP 2-7 HYP Mult MULT SEL BHABHA 2-7 BHABHA Mult MALU Gate from OR Tofino DISC MULT TOFONE > 1 TOFONE MT FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 LASERLASER TRIGGER LOGIC

COSM HYP BHABHA LASER OR TOFONE MULT TOFONE > 1 OR TOFINO BASIC TRIGGERS TRIGGER LOGIC FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 BTB Bhabha MULT Bhabha BTB K+K- MULT HYP OR MB MULT TOFONE > 1 OR TOFONE LASER PhDiode PLU System + PRESC

Moduli VME (Heart of Trigger Logic) progettati e realizzati da Silvano Gallian Electronic Lab - Torino INFN) n Pattern Recognition LE297 BtB Topologies OK n Multiplicity Selector LE308 HYP, BHA multiplicities OK n Prescaler LE312 prescaling triggers OK Prompt Coincidence LE301 tof Tofino-Tofone Not working in CRoom! Already repaired, it still gives problems of noise. New tests and/or design needed Estimated time 6 m.u. FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04

Rate TOFINO ~ 400 kHz ! SELECTION OF HYP EVENTS Background rejection for HYP Trigger L = cm -2 s -1 High rejection power MC ISEO 2002 FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 Real HYP TRIG Rate ~ 7 L ~ 4x10 31 cm -2 s -1 RUN

SELECTION OF BHABHA EVENTS Background rejection for Bhabha Trigger L = cm -2 s -1 MC ISEO 2002 FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 Real BHABHA TRIG Rate ~ 15 L ~ 4x10 31 cm -2 s -1 RUN Maybe Tofino efficiency for mip ?

TRIGGER Efficiency for BHABHA selection FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 Pattern Recognition exclusive BTB 1-3 Topologies 95% evaluated on TDC hits 98% evaluated on MT hits Multiplicity Selector * BTB1-3 Mult 2-7 on Tofone 90% evaluated on TDC hits 99% evaluated on MT hits ? evaluated on MT hits inside Tofino gate Need of TOF Calibration Beam Runs Dec 2003 with Trigger ORTofino*ORTofone TRIGGER EFFICIENCY

What about Trigger Efficiency for HYP selection ? Maybe not enough statistics on Beam Runs with Trigger ORTofino*ORTofone We have to check including last runs FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 TRIGGER EFFICIENCY

Trigger Timing FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 MT Tofino (jitter/jump ~ 10 ns) MT Tofone (jitter < 2ns) Timing Alignment with LASER Maybe due to CFD ? Between Tofino and Tofone (Basic Trigger signals) FINAL Timing Alignment with with beam collisions Due to not safe calibrated optical fibers Loose Timing Need of TOF Calibration to measure real length of fibers

SELECTION OF HYP EVENTS prompt - Fast coincidence ( tof) custom VME module Multiplicity >= 1 (Ext TOF) custom VME module + from K + decayprompt - tof Inner-Outer Barrels K + mean lifetime = 12.4 ns MC ISEO 2002 Trigger Timing

Common STOP FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 Programmable Choice using Output Register CES ST03 OR Tofino (Physics, Cosmics) OR Tofone (Cosmics) Photodiode (LASER) RF (not used, but read out on dedicated TDC) 8 double ANDs, 1 gate Progettato e realizzato da Fulvio Pompili (INFN-LNF) Safe Timing > 10 ns

TO BE or NOT TO BE FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 RF for Physics (on all TDCs) OR RF not used, but read out on dedicated TDC Times with Physics Meaning TOF (particle time of flight between Tofino and Tofone) Computing differences RF expires NO advantage Resolution still depends on Tofino and Tofone ones

Higher Levels of Trigger FINUDA TRIGGER - Simonetta Marcello - TS 6/5/04 Maybe useful at 3 rd Level TOF used at 1 st Level LMD and STB not useful alone at 2 nd Level SIL most interesting information to be manage at 2 nd Level, BUT unfortunately too slow (> 15 ms) TOF again at 2 nd Level ? Filippini/Panzarasa TALK Do we need a strict selection ?