Status reports: Production environment Trigger simulationM. Palutan, B. Sciascia EmC responseS. Miscetti Background selectionS. Miscetti, M. Moulson DC.

Slides:



Advertisements
Similar presentations
Status reports/Discussion items S. DellAgnello DC geometry review DC wire sag measurements P. de SimoneDC s-t relations with new sag model S. Miscetti.
Advertisements

Status reports Trigger simulationM. Palutan, B. Sciascia DC GeometryA. Antonelli, S. Dell’Agnello DC wire sag measurementS. Dell’Agnello, C. Forti DC s-t.
Barbara Sciascia – LNF 1 K  semileptonic BR measurement B. Sciascia 4 may 2006 KpmKSL joint meeting.
KLOE GM Capri May 2003 K charged status report DE/Dx development vs PiD (next talk by E.De Lucia) →K e3 studies: initial design of efficiency measurement.
Wing Attack - Plan R or How I learned to stop worrying and love the Monte Carlo 06/06/06.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s M. Palutan et al.Trigger simulation parameters S. GiovannellaGEANFI.
Generators VS Alternators Tech Topic Presentation Mandi Fournier.
10/14/20051 Tau reconstruction and H/A →  H/A →  MC events: PYTHIA ⇒ OSCAR ⇒ DIGI (mass 120 GeV ?) 10k events overnight DIGI ⇒ DST: crashes DIGI ⇒
HiT – Higgs and Top (Thursday, June 22, 2000) 1.News - Boaz/Meenakshi 2.Trigger Simulator Status – who?? 3.Proposal for a HiT workshop – Meenakshi/Boaz.
Software parallel session summary MICE collaboration meeting INFN, Frascati 27/6-05.
Status of EMC background data Tim West University of Manchester.
Offline Trigger Software Update Akio Ogawa STAR Collaboration Meeting 2003 Feb 28 BNL.
Notes on offline data handling M. Moulson Frascati, 29 March 2006.
M. Primavera 2 nd KLOE Physics Workshop, 10 th -12 th june 2002 Otranto (LE) 1 Perspectives on charged K physics in KLOE 2 nd KLOE Physics Workshop, 10.
KLOE Offline Status Report Data Reconstruction MonteCarlo updates MonteCarlo production Computing Farm C.Bloise – May 28th 2003.
Study of response uniformity of LHCb ECAL Mikhail Prokudin, ITEP.
Online and offline software overview, status and plans Status and Integration to STAR : Trigger DAQ Monitoring Slow Controls Online Databases Online/Offline/MC.
Offline Discussion M. Moulson 22 October 2004 Datarec status Reprocessing plans MC status MC development plans Linux Operational issues Priorities AFS/disk.
Magnetic Field Measurement System as Part of a Software Family Jerzy M. Nogiec Joe DiMarco Fermilab.
Realistic, large-scale MC production M. Moulson, 20 December 2002 Summary presentation for KLOE General Meeting Outline: Production proposal Refinements.
November 6, 2004Carl Bromberg, FNAL LAr Exp. Workshop Nov. 4-6, Particle ID, energy resolution, neutrino flavor tagging, efficiencies, backgrounds,
Status reports M. Antonelli ISR and f decay simulation S. Dell’AgnelloDC geometry review P. de SimoneDC s-t relations with new sag model A. AntonelliDC.
MC/Offline Planning M. Moulson Frascati, 21 March 2005 MC status Reconstruction coverage and data quality Running time estimates MC & reprocessing production.
Offline/MC status report M. Moulson 6th KLOE Physics Workshop Sabaudia, May 2006.
KLOE Computing Update Paolo Santangelo INFN LNF KLOE General Meeting University of Rome 2, Tor Vergata 2002, December
Status report from T2K-SK group Task list of this group discussion about NEUT Kaneyuki, Walter, Konaka We have just started the discussion.
STATUS OF KLOE F. Bossi Capri, May KLOE SHUTDOWN ACTIVITIES  New interaction region  QCAL upgrades  New computing resources  Monte Carlo.
V.Patera – KLOE GM – Otranto – 10 June 2002 K  reconstruction status K + K - retracking features New vs Old : resolution New vs Old : efficiencies Conclusion.
Update on MC-04(05) –New interaction region –Attenuation lengths vs endcap module numbers –Regeneration and nuclear interaction –EMC time resolution –
CEBAF The Continuous Electron Beam Accelerating Facility(CEBAF) is the central particle accelerator at JLab. CEBAF is capable of producing electron beams.
Status of the KLOE experiment M. Moulson, for the KLOE collaboration LNF Scientific Committee 23 May 2002 Data taking in 2001 and 2002 Hardware and startup.
Status of K S   e analysis C. GattiT. Spadaro Selection on data Selection on MC Efficiencies from data, K L   e, K S    ,      , bhabha.
The KLOE computing environment Nuclear Science Symposium Portland, Oregon, USA 20 October 2003 M. Moulson – INFN/Frascati for the KLOE Collaboration.
Dead or alive ??!! … Erika & Patrizia …. … this story begins when … … we were trying to produce the KMP dst’s for 2004 data … reproduce the List oh the.
Offline meeting Outcome of Scientific Committee Status of MC04 Proposal for a minimum bias EvCl sample Other offline activies: –Reprocessing –Dead wires.
Offline meeting  Status of MC/Datarec  Priorities for the future LNF, Sep
Measurement and simulation of neutron detection efficiency in lead-scintillating fiber calorimeter Active material:  1.0 mm diameter scintillating fiber.
Status report from the Atlas LNF group Bellisario Esposito Outline -LNF partecipation in Atlas -Detector activity and status -Preparation to the Analysis.
A proposed plan for fine tuning of EMC MC The plan is to :  SURVEY the existing situation over the runs - Validation of plots using  and.
Offline Status Report A. Antonelli Summary presentation for KLOE General Meeting Outline: Reprocessing status DST production Data Quality MC production.
TB model improvements in Mokka and status of MC production Fabrizio Salvatore Royal Holloway University of London.
Status report of the KLOE offline G. Venanzoni – LNF LNF Scientific Committee Frascati, 9 November 2004.
Status of the hadronic cross section (small angle) Federico Nguyen February 22 nd 2005  the 2002 data sample and available MC sets  trigger efficiency.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
Work finished M. Antonelli ISR and f decay simulation M. MoulsonBank-reduction code for DST’s.
Status of vertex efficiency evaluation Fabio Ambrosino, Patrizia de Simone, Paolo Massarotti, Vincenzo Patera the idea is to look for events where the.
2 nd KLOE Physics Workshop A. Ferrari 1 of the K L  K S regeneration cross section: F. Ceradini, A. Ferrari, A. Passeri Universita’ di Roma Tre & INFN.
MC sign-off and running plans M. Moulson, 1 March 2004 Offline discussion Outline: Results of tests on new MC files Sign-off on production version What.
Offline Status Review M. Moulson, P. Valente, for the Offline Group 16 March 2001 Outline: Status update FILFO: new developments (G. Finocchiaro) Questions.
The MEG Offline Project General Architecture Offline Organization Responsibilities Milestones PSI 2/7/2004Corrado Gatto INFN.
Tuning of trigger simulation parameters (Bossi, Moulson, Palutan, Sciascia) Calorimeter trigger thresholds calibration using prompt photons from K S 
Status report on analysis of BR(K S  p + p - p 0 ) A. Antonelli, M. Moulson, Second KLOE Physics Workshop, Otranto, June 2002.
1 Reminder: Why reprocess? data Reconstruction: DBV DSTs: DBV data DBV-19 for reconstruction & DSTs, Run < DBV-20 for.
Data vs MC … issues of the K +- group 1.Accidentals … contribution from Erika & Roberto 2.DC background.
BESF Framework Development Weidong Li
DST data structures: Status report M. Moulson, CP working group 25 October 2001.
KLOE general meeting December 2002 Tor Vergata K charged status report DST production status New analysis items:  K + K - cross section/  line.
M. Martemianov, ITEP, October 2003 Analysis of ratio BR(K     0 )/BR(K    ) M. Martemianov V. Kulikov Motivation Selection and cuts Trigger efficiency.
Paolo Massarotti Charged Kaon Meeting 4 may 2006 Charged kaon lifetime P. Massarotti.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
Status of the measurement of K L lifetime - Data sample (old): ~ 440 pb -1 ( ) - MC sample: ~125 pb -1 ( mk0 stream ) Selection: standard tag (|
Update on the false-dead DC wire problem
KLOE offline & computing: Status report
Status report on   f0  00
Salvatore Fiore Università di Roma “La Sapienza”
MC ’04-’05 objectives                                                       
Large scale MC production II
G. Venanzoni-LNF KGM Frascati, 19 Dec 2006
Practice Geometry Practice
Presentation transcript:

Status reports: Production environment Trigger simulationM. Palutan, B. Sciascia EmC responseS. Miscetti Background selectionS. Miscetti, M. Moulson DC dead/hot & efficienciesM. Moulson Background insertionM. Moulson, S. Miscetti Background harvestM. Moulson, S. Miscetti Beam position and momentumM. Moulson, S. DellAgnello Beam energy spreadT. Spadaro, C. Gatti DB modificationsI. Sfiligoi Scripting for MC productionM. Moulson, C.Bloise Bank-reduction code for DSTsM. Moulson Streaming code for MC DST productionC. Bloise? Scripting for MC DST productionM. Moulson?

Status reports: MC executable GEANFI on IBMS. Giovannella DC GeometryA. Antonelli, S. DellAgnello DC wire sag measurementS. DellAgnello, C. Forti DC s-t relations with new sag modelP. De Simone EmC geometryS. Miscetti, C. Bloise Generators/MC tuningC. Bloise

Status reports: Generators ISR and f decay simulation M. Antonelli w p 0 g P. Gauzzi a 0, f 0 : KLOE spectraP. Gauzzi Kl3 g F. Scuri, M. Antonelli, C. Gatti K L p+p-g T. Spadaro K L 3p C. Bloise RegenerationA. Ferrari K mng ITEP