1 Preparazione analisi Global Runs Esperienza dal November Global Run (GREN): ~ 2 settimane di data taking [ => running conditions (non sempre stabili.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advanced Piloting Cruise Plot.
1 Attivita su analisi dati cosmici (CRAFT: B=3.8 T & CRUZET(B=0) Pd meeting, 10 Nov 2008 A.Branca, A.Calderon, A.Gresele, U.Gasparini, A.Meneguzzo (+ F.
15 December 2008Pd meeting1 News/highlights dalla CMSweek ( con qualche dettaglio su analisi dei CRAFT data ) U.Gasparini.
1 Brevi Notizie dal Commissioning di CMS… November Global Run (GREN): will last 2 weeks: 26 Nov-7 December (Dec Cosmic Run cancelled, Tracker will probably.
1 CHEP 2000, Roberto Barbera The ALICE Inner Tracking System Off-line Software CHEP 2000, (
Primo (e ultimo ?) giorno di fascio a LHC Nuovo Logo di CMS valido almeno fino alla prossima primavera:
Kapitel 21 Astronomie Autor: Bennett et al. Galaxienentwicklung Kapitel 21 Galaxienentwicklung © Pearson Studium 2010 Folie: 1.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
My Alphabet Book abcdefghijklm nopqrstuvwxyz.
Multiplying binomials You will have 20 seconds to answer each of the following multiplication problems. If you get hung up, go to the next problem when.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
LHCb Alignment 12 th April 2007 S. Viret Coseners Forum « LHC Startup » 1. Introduction 2. The alignment challenge 3. Conclusions.
C1 Sequences and series. Write down the first 4 terms of the sequence u n+1 =u n +6, u 1 =6 6, 12, 18, 24.
ZMQS ZMQS
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
ABC Technology Project
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Chapter 5 Microsoft Excel 2007 Window
Linking Verb? Action Verb or. Question 1 Define the term: action verb.
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Chapter 5 Test Review Sections 5-1 through 5-4.
SIMOCODE-DP Software.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
How Cells Obtain Energy from Food
CpSc 3220 Designing a Database
CMS Databases P. Paolucci. CMS DB structure HLT-CMSSW applicationReconstruction-CMSSW application FronTIER read/write objects.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
The CMS LEVEL 1 TRIGGER SYSTEM FUNCTIONALITY and PERFORMANCE
1 M. Paganoni, 17/1/08 Modello di calcolo di CMS M. Paganoni Workshop Storage T2 - 17/01/08.
Calibration Status of the art – the first tTrig calculated from data
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
DQM for the RPC subdetector
Presentation transcript:

1 Preparazione analisi Global Runs Esperienza dal November Global Run (GREN): ~ 2 settimane di data taking [ => running conditions (non sempre stabili con : DT (whole YB0), RPC (baseline: YB0/+1/+2 Sect4/5/10/11), CSC (YE+2, ME2+ME3) HCAL, ECAL DTTF,CSCF trigger & readout ] Preparazione/schedula prossimi Global runs: - ~fine Febbraio (3 wheels? Alcuni moduli del Tracker?) - Aprile (full Tracker?) - Maggio: CMS chiuso, 4 weeks data taking, B on

2 Next Global Runs Tentative schedule (Acosta/Camporesi, Dec.CMSweek)

3 GREN ~20 M triggers very useful for - syncronization, calibration, alignment - reconstruction optimization: local/global - trigger` studies - correlation between different detectors In generale, e stata una ottima palestra per le DT Alcuni esempi…

4 Synchronization: BX id for HH triggers Triggering Sectors: 3,4,5 & 9, 10,11 Sector 11 Sector 10 Sector 3 Sector 4Sector 5 Sector 9

5 Prompt-Offline time calibration (DT+RPC+HCAL triggers) -MB1 -MB2 -MB3 -MB4

6 Prompt- Local Reconstruction checks: Hit residuals (dominated by uncertainty due to muon time of arrival within the BX window): Run MB1 -MB2 -MB3 -MB4

7 DT in RPC-triggered Events: [ Run ; RPC Triggers in Sectors 9,10,11 & 3) Trigger checks: DT vs RPC

8 Correlation between DTTF & TDC data No bending angle in MB3 Track angleTrack position Trigger position MB1 MB2 MB3 MB4 position plot shifted for MB2 (understood)

9 Global reconstruction Multiplicity of associated hits to global tracks (linking 2 or more stations): Run 30625

10 Global reconstruction Run 30514, ~ 107,000 triggers, ~45 data taking, ~ 40 Hz

11 Extrapolations to calos Run ~20% (~8 Hz) ~40% Extrapolation used in HLT streams

12 DT HCAL correlations Analysis of HCAL-mip triggers using DT tracks, P.De Barbaro et al. Run 30205, 8,000 Hcal mip triggers HCAL Phi tower index HCAL Eta tower index Usage of DT info from other detectors DT Eta tower predictionDT Phi tower prediction

13 GREx- sw documentation …. https: //twiki.cern.ch/twiki/bin/view/CMS/DTanalysisGR GREx documentation (sw, config files, db info…) pages will be regularly linked from the general DT-DPG twiki: https: //twiki.cern.ch/twiki/bin/view/CMS/MuonDPGDT

14 Dati: trasferiti e registrati a Legnaro prompt Calib + reco checks here Output to CMS Orcoff (in a non-authomatized way) Prompt official CAF then Reco, DTEcal/DTHcal streams ect.. to others T1/T2 tiers ~10 h latency Dati analizzabili dal cluster lxcmssrvN (N=4,6) di Padova: working example su : /raid3/share/GRENanalysis/DTAnalyzer_GREN_YB0_Frontier_LNL.cfg

15 Preparazione Global Runs futuri - Utilizzo dati di allineamento (survey + allineamenti interni alle camere) tests sui dati gia esistenti del GREN inserimento in DB ufficiale letto da CMSSW (analogamente a quanto gia fatto per i test pulse di calibrazione temporale) - Studio sui dati esistenti delle estrapolazioni al tracker (rates, possibili selezioni di triggers); studio delle estrapolazioni sopra-sotto; - Essere pronti a inglobare i dati del Tracker nell analisi contatto/collaborazione col gruppo di ricostruzione del Tracker (Patrizia?/ Boris? / altri…?)

16 Alignment checks on GREN data Using data produced from Santander Group (P.Martinez et al.) From commissioning & Quality Control Check data http: //cmsdoc.cern.ch/cms/MUON/ alignment/DTinternal/main.html [ YB0 Sectors: 3, 9, 10 & 11; not all chambers available at moment ] Some **very** preliminary Results (Alicia, U.G.) (next slides)

17 Internal Alignment: Nominal position Using alignment DB MB2 MB1 MB4 MB3 MB4: no correction available GREN Run YB0, Sect 3

18 Internal alignment YB0, Sect 9

19 Internal alignment YB0, Sect 10

20 Internal alignment YB0, Sect 11

21 Checks of survey data: alignm.between chambers - Observed relative mis-alignments between chambers w.r.t. nominal geometry -Correlate with survey measurements (to be done) - Insert data in DB; needed for correct trigger DTTF behaviour as soon as we want to implement pointing LUTs (e.g. to Tracker) for next Global Runs (next slides)

22 Alignment between chambers YB0, all sectors ( GREN Run 30625) : Extrapolations: MB1 MB2 MB1 MB3 MB1 MB4 MB2 MB1

23 Alignment : YB0 Sect 3,4 & 5 Extrapolations: MB1 MB2 MB1 MB3 MB1 MB4 MB2 MB1

24 Alignment : YB0 Sect 9, 10 & 11 Extrapolations: MB1 MB2 MB1 MB3 MB1 MB4 MB2 MB1

25 Confronto dati -MC Muon spectra & mu+/mu- ratio Ripetere le analisi di MTCC (su tutto il detector!)