1 Brevi Notizie dal Commissioning di CMS… November Global Run (GREN): will last 2 weeks: 26 Nov-7 December (Dec Cosmic Run cancelled, Tracker will probably.

Slides:



Advertisements
Similar presentations
CALICE Summary of 2006 testbeam for the ECAL
Advertisements

1 Attivita su analisi dati cosmici (CRAFT: B=3.8 T & CRUZET(B=0) Pd meeting, 10 Nov 2008 A.Branca, A.Calderon, A.Gresele, U.Gasparini, A.Meneguzzo (+ F.
1 Preparazione analisi Global Runs Esperienza dal November Global Run (GREN): ~ 2 settimane di data taking [ => running conditions (non sempre stabili.
Primo (e ultimo ?) giorno di fascio a LHC Nuovo Logo di CMS valido almeno fino alla prossima primavera:
Compact Muon Solenoid Thomas Themel TU Wien June 2009 Institut für Hochenergiephysik, ÖAW Control of the Global Muon Trigger Tobias Noebauer Ivan Mikulec.
J. Varela, CERN & LIP-Lisbon Tracker Meeting, 3rd May Partitions in Trigger Control J. Varela CERN & LIP-Lisbon Trigger Technical Coordinator.
May 11 th, 2007 LNF Scient. Comm M.Spinetti 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of.
Modifications  CMS-RPC-1 and CMS-RPC-3: updated dimensions (Ian Crotty, March 1 st )  ATLAS-sMDT: updated dimensions (Felix Muller, February 26 th )
Giuseppe Roselli (CMS-RPC) Università degli Studi di Bari – INFN RPC Efficiency with Track Reconstruction Giuseppe Roselli.
New Chambers for M23R12 for the Muon Upgrade Alessandro Cardini INFN Cagliari.
1 Ratio mu+/mu- & muon reco studies on CRAFT data Status update, 6 Nov 2008 A.Calderon, INFN Padova & Ministerio de Educacion Y Ciencia, Spain F. Cavallo,
Calibration for different trigger sources (DT,CSC,RPC) S.Bolognesi for the Torino group (with a big help from M. Dalla Valle) DT Cosmic Analysis meeting.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Approved Plots from CMS First Beam Runs 2-October-2008.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
CMS Databases P. Paolucci. CMS DB structure HLT-CMSSW applicationReconstruction-CMSSW application FronTIER read/write objects.
Nov. 5th, 2007CMS Tier1 visit to FNAL, “Commissioning, Global Runs & ROC”, Kaori Maeshima 1 Commissioning, Global Runs & ROC CMS Tier1 visit to FNAL November.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
W. Smith, U. Wisconsin, LHCC CMS Review, May 6, 2008 Trigger Coordination - 1 Trigger Coordination Report Wesley H. Smith U. Wisconsin CMS Trigger Coordinator.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
First CMS Results with LHC Beam
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
1 DT Local Reconstruction on CRAFT data Plots for approval CMS- Run meeting, 26/6/09 U.Gasparini, INFN & Univ.Padova on behalf of DT community [ n.b.:
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
US AFEB timing in CSCs in splash events, run N. Terentiev, CMU CSC Synchronization meeting Nov. 16, 2009, CERN.
DQM for the RPC subdetector M. Maggi and P. Paolucci.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
The CMS LEVEL 1 TRIGGER SYSTEM FUNCTIONALITY and PERFORMANCE
TeV Muon Reconstruction Vladimir Palichik JINR, Dubna NEC’2007 Varna, September 10-17, 2007.
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
Muon Reconstruction and Vertex Constraint Giovanni Abbiendi Bologna CMS meeting, 20 November 2007.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
David Lange Lawrence Livermore National Laboratory
Status at CERN 8 fills  ~500/pb since last Tuesday – ~5.3/fb delivered, ~4.8/fb recorded, … SEU workshop on Friday – Different detectors have different.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
Approved Plots from CRAFT
Calibration Status of the art – the first tTrig calculated from data
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
Commissioning of the MUON Spectrometers in ATLAS and CMS
ATLAS Muon Spectrometer and
SLB Synchronization in H4 Beam (LIP - Lisbon)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Project Presentations August 5th, 2004
DQM for the RPC subdetector
Resistive Plate Chambers performance with Cosmic Rays
The CMS muon system performance
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC approved plots.
Presentation transcript:

1 Brevi Notizie dal Commissioning di CMS… November Global Run (GREN): will last 2 weeks: 26 Nov-7 December (Dec Cosmic Run cancelled, Tracker will probably not partecipate) => aiming for stable running conditions with : DT (baseline: whole YB0), RPC (baseline: YB0/+1/+2 Sect4/5/10/11), CSC (YE+2, ME2+ME3, 108 chambers) HCAL, ECAL DTTF,CSCF trigger & readout Expected ~10 50 M triggers very useful for - syncronization, calibration, alignment - reconstruction optimization: local/global - trigger` studies - correlation between different detectors https: //twiki.cern.ch/twiki//bin/view/CMS/GlobalRunGoalsNov2007 More on twiki page:

2 Praparation for Global Run: STA muons - First analysis (up to STA muons) of one full wheel (YB0) data (local run): Associated hits to reco STA muons: CMSSW 1_6_3 + EventFilter/DTRawtoDigi fix (committed for 1_7_0) Run ~ 50,000 triggers ~ 50 Hz ( 5 triggering Sectors: 7,8,9,10 & 12 )

3 Example: Oct 22th Integration Run Extrapolated to HCAL surface