Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Electronics Review Review of cable procurement and installation Davide Piccolo INFN Napoli.
Advertisements

P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LV and HV status of the RPC system RPC detector and trigger group.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Low Voltage LB status RPC detector and trigger group.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Mary-Cruz Fouz CIEMAT-Madrid Muon Week Bologna Apr03 Madrid Status Report.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Status of NA62 straw electronics Webs Covers Services Readout.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
V. Bobillier1 Cable installation status.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
≈450 mm 50 x 220 mm 2 ≈450 mm 50 x 220 mm 2 Electronics boards Size: 50 x 220 mm 8 VMM chips à 64 ch Total: 512 ch/board Zebra contact Arrangement of electronics.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
PIXEL CAEN Installation Status
Cables for the RE4 Upscope in CMS
LKr status R. Fantechi.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
DCS: Temperature Probes
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
Electronics for RPC Upscope
HV & LV status LV system in W+1 and W+2 is OK
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
23 Barrel chambers and 12 Endcap chambers
HV Imon in 1th MTCC period
Dr. Pierluigi Paolucci - INFN di Napoli
HV-LV-DCS Status NEWS DCS Endcap Integration
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
RPC Detector Control System: towards the final system
HV & LV status LV system in W+1 and W+2 is OK
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV cable-distrib: 1 month * 2 people people involved up to now: G. Passeggio, F. Cassese, A. Vanzanella A. Cimmino and P. Noli HV Patch Panel connection: 2 weeks * 2 people

Giovanni Polese 2 Power system Status New CAEN firmware 2.4. Is sync now OK ?? test in Napoli is OK ?? No offset change test at CERN next week !!! No news on the thermal drift !! LV tower cable installed (W ) 1 more LV board + 3 HV boards broken 2 HV crates in CR (W+2 and W+1) have been connectorized and are under test (A. Cimmino) 3 more HV crates will be worked by CPE ??

Giovanni Polese 3

4

5

6 LV cabling tower and tower-tower cabling installation: (1 week * 2 people)/wh  5 weeks LV test: (1 week * 2 people)/tw  10 weeks temp test: (1 week * 2 people)/wh.  5 weeks Infrastructure cabling and test (1 week * 2 people)/wheel  5 weeks

Giovanni Polese 7 HV & LV components status Log scale

Giovanni Polese 8 Components - numbers modelloordinaticonsegnatimancanti SY A MACISTE312 A3512N - HV BC A A CRATE34 0 A3000FB - FAN14 0 A3486S - MAO505 A LV60573 To modify Late delivery