Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.28 AR Page No. 1 Activity Report WG A3.28 Switching phenomena.
Section 4.9 Review Work Group Update to Board of Directors March 11, 2015.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
SC-A3 (High Voltage Equipment) SCA3 meeting, Delft (Neetherlands), March 12, 2014 A. Mercier (Convener) WG: A3.35 report Guidelines and Best Practices.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
MAC Committee Update Robert Kondziolka, MAC Chair.
1 CNC-CIGRE Study Committee Report October 18-20, 2010 VANCOUVER CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure.
PRIIA Section 305 Next Generation Equipment Pool Committee Ken Uznanski Amtrak Policy and Development SCORT National Meeting September 21, 2010.
Compliance Performance Measure Proposals and Preliminary Trends Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee.
Afef Challouf STEG Medelec Annual meeting/AUE Seminar, Jordan, March 26-28, 2012.
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Session 2, III - Voltage dips and disturbances in customers installations Barcelona May 2003 Activities of Joint Cigré/CIRED/UIE Power Quality Working.
ACBCYW HIGH RISK Ad Hoc WORKGROUP REPORT March 2014.
IEEE Working Group on Broadband Wireless Access Roger Marks, Chair IEEE /0041.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
IEEE CIGRE Liaison Report on SCA2 Transformers
CIGRE JWG / CIRED Power Quality Indices and Objectives Progress report on joint Cigré / Cired Germain Beaulieu, conv. February 2003.
Working Group 1: Evolving 911 Services Status Update December 3, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
Earthquake Response Cooperation Initiative Phase 1 Progress Report By Chinese Taipei May 19, 2001 APEC EWG 21 Kuala Lumpur, Malaysia.
NLDC 1 VLPGO : Group of the Very Large Power Grid Operators.
Page 1Wireless World Research Forum (WWRF) September 18, 2001.
1 Pacific Area Standards Congress April 2007 Cartagena, Colombia Gary W. Kushnier, Chair Rob Steele, Secretary Report from the PASC Standing Committee.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
1 GEO Task US-09-01a XX SBA SBA: XX Analyst: Name, Organization Current Status of Report: (e.g., Final, awaiting AG or L. Friedl Input, Preparing Draft,
Border Master Plan Laredo, Texas July 28, 2010  Laredo District  Coahuila  Nuevo León  Tamaulipas.
ITU Regional Standardization Forum For Arab Region SESSION 5 14:00-14:35 Guidelines for effective preparation.
In-session workshop on safety standards Vienna, 19 July 2016 Page 1 /13.
Worldwide ENC Database Working Group
The Research Agenda of the 2008 SNA
Reliability Assessment Committee Proposal TSS Meeting
August LNBA Agenda Time Topic 1:00 – 1:15
CIGRE WG C4.28 Extrapolation of EMF measurements
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
WG Composition: WG Convener: W. A. Radasky
CENELEC TC215 WG3 (EN Series)
Compliance Performance Measure Proposals and Preliminary Trends
Marine Strategy Framework Directive (MSFD)
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
IEEE Rail Transit Vehicle Interface Standards Committee
WG Chair: Charles Ehrlich, NIST, U.S.A. CIML Member
Task Force 3: Electrolyte leakage
WSC Market Report Task Force Meeting
ITU Regional Standardization Forum For Arab Region SESSION 5 14:00-14:35 Guidelines for effective preparation  
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
Electric Vehicles and the Environment (EVE IWG)
IEEE 802 EC Privacy Recommendation SG November, 2014, Report to 802 EC
Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate.
ENERGY Working Group Shanghai 2011
Task Force – Cyber Security, Data Protection and Over-the-Air issues
Common Understanding Way forward
Item 4.2 – Towards the 2016 AES Philippe Lombardo Eurostat-F5
Action points Who When WG GES 31 March March 2017
Green Infrastructure: Working method
Sub-Group on Review of Priority Substances – state of play
Action Plan following the Active substance workshop
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Presentation transcript:

Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge Amon - BR Number of Members:15 Regular Members:11 (BR, CH, USA, NE, IN, CR, FR, SA) Corresponding Members: 4 (D, BR, JP, CA) Dismissed inactive members: 4 Working Group Activity ReportPage No.: 1March 2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportPage No.: 2 Activities & discussion items Five meeting until date: September 2011 in Vienna, March 2012 in Baden, August 2012 in Paris,March 2013 in Rio, September 2013 in Johannesburg. Work divided in 6 different topics: 1. Stressing parameters: - Environmental, Electrical, Dielectric, Mechanical, Prioritization of stressing parameters 2. Equipment capabilities - Standards, Test protocols, Specification, Influence of aging (WG A3.29) 3. Review of utilities processes to assess potential overstresses risk 4. Measures for risk mitigation: - What utilities do (or should do) to mitigate equipment´s overstress risks? 5. Proposal for improvements on the overstress management process: - gap analysis of utilities overstress management X main stressing parameters & available information on equipment capabilities -proposals for improvement & recommended processes - suggestions for standards improvements 6. Brochure annexes: - overstress checking procedures for selected equipment and stress parameters. March 2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportMarch 2014Page No.: 3 Activities & discussion items State of the work: Item 1 (Stressing parameters) already concluded; Item 2 (Equipment capabilities):  standards analysis to be finalized next meeting;  test protocols and specification analysis to be prepared for sept./2014;  Aging influence: waiting for WG A3.29 results; Item 3 (Review of utilities processes):  Experiences so far collected: ONS, AXPO, EDF, LIANDER, BPA, VLPGO (NG, TERNA, REE, ONS & RTE)  first draft foreseen for sept./2014; Item 4 (Measures for Risk Mitigation):  Experiences so far collected: ONS, AXPO, EDF, LIANDER, BPA, VLPGO (NG, TERNA, REE, ONS & RTE)  first draft foreseen for sept./2014; Item 5 (Proposal for improvements): last task, conclusion foreseen for May 2015 Item 6 (Annexes): already started for CB and CT, conclusion foreseen for March 2015

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportPage No.: 4 Membership Members CompanyCountry 1Antonio Carvalho 2Christian 3Kenn 4Jorge Amon 5Marcel NVNetherland 6Robin Kumar Sarkar POWERGRIDIndia 7Petr HV LaboratoryCzech Republic 8 Reto Karrer 9 Santosh Kumar Annadurai 10Pierre-Daniel Moreau CISTFrance 11Sphiwe Africa Corresponding members 12Armin Aachen UniversityGermany 13Jonas 14 Yubun Chubu Electric Power Co., Inc. Japan 15André March 2014