Review ROAD storage permit Knowledge dissemination 26 October 2012, Oostvoorne.

Slides:



Advertisements
Similar presentations
ICP 7-th Regional Coordinators Meeting World Bank, Washington D.C.
Advertisements

SARQA/DKG Conference 3-4 October SARQA/DKG Conference 3-4 OCTOBER 2002 Annex 13 Update An Industry Perspective Michael J Cooke Director, Global.
A 2030 framework for climate and energy policies Marten Westrup
The Latest Developments in Ukraines Intellectual Property Laws and Data Protection.
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
1 Measurement of Production of Financial Institutions Conclusions and recommendations 3-10 by the OECD Task Force on Financial Services (Banking Services)
Orientation Session on International Public Sector Accounting Standards (IPSAS) September 1, 2009.
1 Welcome Safety Regulatory Function Handbook April 2006.
Dispute Settlement in the WTO
Jean-Michel DELAVAL 19 November 2009
1 A FUTURE EUROPEAN SPORTS POLICY In the name of Autonomy and Specificity By Prof. Michele Colucci, Tilburg University Website: -
Regional Policy EUROPEAN COMMISSION 1 EGTC regulation EGTC regulation ESF and EGTC regulations Regulation of the European Parliament and of the Council.
The Implementation Structure DG AGRI, October 2005
1 Harmonisation of requirements: where we are Erik Waterdrinker, IFAH-Europe 2nd Veterinary Workshop on E-submission 4 Dec 2009, EMEA, London.
- GDP 2011 versus 2010 – increase by 5.5%
The Managing Authority –Keystone of the Control System
European Union Cohesion Policy
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 FOURTEENTH MEETING OF THE EXPERT GROUP ON.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Regional Policy Cohesion Policy Legal Package State of play Porto, 29th April 2013 Vicente RODRIGUEZ SAEZ Deputy Head of Unit DG REGIO.D.1 Transnational.
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 SEVENTEENTH MEETING OF THE EXPERT GROUP ON.
European Union Cohesion Policy
WHO Good Distribution Practices for Pharmaceutical Products
Overview of the Basel Convention and Basel Protocol: History and Goals Ms. Donata Rugarabamu Senior Legal Officer Secretariat of the Basel Convention Regional.
The Basel Convention and its application to ship recycling
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
Presented by Beth Waldman, JD, MPH For the Iowa DHS Remedial Services Working Group Meeting Four December 3, 2010.
Opole University1 Jerzy Jendrośka Implementing the CCS Directive in Poland: key findings from the transposition process Implementing the EU CO2 Storage.
Briefing to the Select Committee on Security and Constitutional Development 11 February
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
EMS Checklist (ISO model)
Presentation of the proposed Annex 19 – Safety Management
Human Capital Investment Programme Disability Activation Project (DACT) WELCOME Support Workshop Thursday 7 th February
Subsidy Contract Lead Partner seminar October 2008, Riga Arina Andreičika Managing Authority
EU Remedies Directives Update Florence Gregg figpc ltd, M:
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
The Draft National Harmonised Regulatory Framework Coal Seam Gas.
1 The interconnection of business registers Judit Fischer – DG Internal Market and Services Budapest, 14 June 2010.
VOORBLAD.
© 2005 KPMG IFRG Limited, a UK registered company, limited by guarantee, and a member firm of KPMG International, a Swiss cooperative. All rights reserved.
EU Institutional Architecture for Financial Regulation – Constitutional Issues and Solutions Alexander Türk Dickson Poon School of Law, Centre of European.
HORIZON 2020 STEPHEN FOX FOR KEELE UNIVERSITY 26 TH FEBRUARY 2014.
Third Energy Package for Change of Supplier 2009/73/EC.
Presented to: Minnesota Chamber of Commerce October 1, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
Internal Control–Integrated Framework
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Clinical Trial Agreements
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
European Commission, DG Energy Ewout Deurwaarder 29/06/2010 Biofuels in the EU Renewable Energy Directive - Update Energy crops advisory group EF/010/077.
1 The Data Protection Officer at work Experience, good practices and lessons learnt Pierre Vernhes – former DPO at the Council of the EU Workshop on Data.
Regulation of Food Additives in the EU
Market4RES –the policy framework
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
LACPA ISA Presentation
1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
1 APCD Analytical Workgroup April 30,
1 Budapest, June 14, Cross border communication among registers - Practical aspects - Yves Gonner Managing director - Trade and Companies Register.
Date faculty of lawgroningen centre of energy law CCS: Regulating Subsoil Storage of CO2 Prof. dr. martha M. Roggenkamp
Carbon Capture and Storage State Legislation Kathy G. Beckett Midwest Ozone Group January 22-23, 2009.
The New EMC Directive 2004/108/EC and the DTI transposition Brian Jones and Peter Howick.
-EU Climate and Energy Package- Mihai Tomescu Policy Officer, Unit ‘Energy and Environment’ Directorate-General Environment European Commission Enabling.
DRAFT Proposal for a European Directive on the Geological Storage of Carbon Dioxide Subject to modification on adoption by the Commission.
Twinning project ENEA – ENforcing Environmental Acquis Skopje, 19 th of November, 2015.
Date faculty of lawgroningen centre of energy law CCS and issues of post- injection liability Mark Wissink
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Presentation transcript:

Review ROAD storage permit Knowledge dissemination 26 October 2012, Oostvoorne

Page 2 Presentation 1.EU CCS Demonstration network - Case study storage permit ROAD 2.CCS Directive 3.Transposition CCS Directive in the Netherlands 4.Storage permit process 5.Addressing the key issues in the storage permit 6.Key challenges

Page 3 1. EU CCS Demonstration network - Case study storage permit ROAD At the Cottbus knowledge sharing event, there was a fruitful discussion with the projects actively sharing their experiences. Below is a list of the key findings that came from the regulatory session: financial issues, liability and responsibility; the transposition of the EU Storage Directive 2009/31/EC (CCS Directive) into national laws; and Lessons learnt from the ROAD storage permitting process.

Page 4 There was a high level of concern among the members that the current manner of implementation of the CCS Directive presents a significant financial hurdle for attaining a feasible project; Using a risk-based assessment for the Financial Security (FS) reduces the requirements to a much more feasible level; All of the projects gave an update of the state of transposition of the CCS Directive in their countries. All are on track for full transposition, although some are doing so in a draft form; ROAD emphasised that the national transposition of CCS Directive should be as general as possible and that site-specific or storage-type specific issues should not be included; Regulation concerning civil liability is not addressed in the CCS Directive and could prove problematic if it is not addressed by member governments.

Page 5 1. EU CCS Demonstration network - Case study storage permit ROAD The most important CCS legislation regarding the storage of CO2 comes from the Directive 2009/31/EC on the geological storage of CO2. There are several important requirements of this legislation leave room for interpretation by Member States. The case study by the ROAD project assesses key issues relating to the storage permit. It must be noted that the storage permit application is filed by TAQA. TAQA already holds the current gas production permit and submitted the application and will be the storage permit holder and the storage operator. ROAD describe their view of the process from a full chain project view. The case study is drafted by the ROAD-project and therefore it only represents the views and opinions of the ROAD joint-venture parties.

Page 6 2. CCS Directive CCS Directive 2009/31/EC: a regulatory framework to ensure permanent containment of CO2 and, where this is not possible, eliminate possible negative effects and any risk to the environment and human health CCS Directive introduces several key elements: -Plans (monitoring, corrective measures, closure, post closure) -Financial Security -Criteria for transfer responsibility -Financial Mechanism (transfer responsibility)

Page 7 2. CCS Directive Interpretation of these elements is up to the Member States. The Guidance Documents (300 pages) give no sufficient clarity and are especially applicable on storage in aquifers Furthermore, regulation of civil liability is not addressed in the Directive, this is up to the Member States Other relevant legislation for regulating CCS in the Netherlands: Long-term CCS-policy (CCS-obligation, cohesion with mining activities, selection storage sites etc.). Proposals were expected in 2011, but are postponed (after demonstration projects)

Page 8 3. Transposition CCS Directive in the Netherlands Implementation CCS Directive in Dutch Mining Act: 1.Literal translation 2.Contains no further interpretation of open standards 3.Interpretation of open standards in storage permit ROAD fully endorses this approach: Each CCS project has its own specific characteristics Tailor made approach is essential Regulation should not restrict the development of CCS, keep legislation as general as possible, location-specific agreements in storage permit.

Page 9 3. Transposition CCS Directive in the Netherlands Transposition in: Dutch Mining Act. On 25 January 2011 the Parliament (except for the Partij voor de Dieren) voted in favor of the Amendement. Senates approval came in June Mining Decree and Mining Regulation. These frameworks give general rules for the process of the storage permit application. These amendments entered into force in September Storage permit. The permit applicant has to explicate how to give substance to financial security, monitoring, post-closure obligations etc.

Page Storage permit process

Page Storage permit process June 2010: TAQA submitted application (under old Mining act) June – September 2011: opening storage permit P18-4 for competition August 2011: the draft storage permit was ready and sent to the EC December 2011 – February 2012: publication draft storage permit under RCR and opportunity for public parties to submit their opinions February 2012: the EC adopted its first Opinion on the draft permit. Only minor changes in draft storage permit Final and irrevocable permit will be published soon

Page Storage permit process Although the storage permit is finalized and ready for publication, the permit needs a detailed update before injection starts (2015): All plans (monitoring, corrective measures etc.) are not operational yet and must be finalized in 2014 Additional studies will be carried out (for example: well and fault integrity studies) The Financial Security must be in place in 2014 The minister must give his/her approval on these updates when the permit will be adjusted and Sodm and TNO (state advisors) will give their expert advice The Opinion of the EC..confirms the suitability of the chosen storage location for the permanent storage of CO2 as was demonstrated by a detailed characterisation and assessment of the storage site and complex. But the EC will be enabled in 2014 again to give a non legal-binding opinion on the update of the storage permit.

Page Addressing the key issues in the storage permit Four examples: 1.Financial Security (FS) 2.Transfer of responsibility 3.Financial Mechanism 4.Definitions storage site and storage complex

Page Addressing the key issues in the storage permit 1.Financial Security (FS) Which activities are included in the FS? Calculate the amount of the costs (risk based approach) Are all available financial instruments accepted?

Page Addressing the key issues in the storage permit Year 1Year 2Year 3Year 4Year 5Year 6Year 7Year 8Year 9Year Monitoring Contingency monitoring Corrective measures Abandonment well P18-4A2 Abandonment platform P18A CO 2 -proof abandonment P15-9 Financial mechanism EU-ETS Subtotal Contingency 20% Total

Page Addressing the key issues in the storage permit 2. Transfer of responsibility Key question: when and how can you prove that all available evidence indicates that the stored CO2 will be completely and permanently contained? Thorough elaboration of procedures and criteria in the storage permit? There are no reasons why the minimum period of 20 years has to lapse. Monitoring plan is considered to be sufficient to prove the complete and permanent containment. The operator must submit a report to the competent authority for approval of the transfer (after injection phase).

Page Addressing the key issues in the storage permit 3. Financial Mechanism Monitoring period and cost limited to 30 years of monitoring Otherwise there will not be a transfer (operator pays for everything) Monitoring after handover is included in monitoring plan

Page Addressing the key issues in the storage permit 4. Definitions storage site and storage complex It is clear that if CO2 migrates out of the reservoir (out of the storage site) into the complex, additional monitoring is required. The permit is granted for storing CO2 in the site, not in the complex. According to the law, only corrective measures need to be taken in case of leakage, meaning CO2 leaking out of the complex. Therefore, a width definition of the storage complex is preferable, especially for projects storing CO2 in aquifers. According to the EU ETS Directive in the occurrence of any CO2 leakage, the permit holder would need to purchase CO2 allowances equivalent to the volume of escaped CO2. The definition of leakage is not the same as the definition for leakage in the CCS Directive: only EUAs must be purchased in case the CO2 leaks to the atmosphere. No EUAs need to be purchased in case the CO2 leaks out of the storage complex, but remains trapped under the ground.

Page Key challenges Storage process: Although the storage permit is finalized and ready for publication, the permit needs a detailed update before injection starts No 100% certainty before 2014 Second opinion EC in 2014 Financial Security: Which financial instrument (bank guarantee, balance sheet, insurance, etc.) will be accepted in 2014? Can increase (and decrease) over time Transfer of responsibility: No certainty on period after abandonment to transfer Financial Mechanism

Page Key challenges Civil liability Amendment of Dutch Civil Act not published yet (how to qualify carbon dioxide?) Transfer of liabilities with transfer of responsibilities Cap in time Volatility EUAs Costs for leakage are unknown Speculation on EU ETS should not be part of CCS demonstration projects

Page 21 Thank you for your attention. Any questions?